CO2 cooling in CMS General overview 30 July 20101Hans Postema - CERN.

Slides:



Advertisements
Similar presentations
AUTOMOTIVE COOLING SYSTEMS
Advertisements

1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
24 June 2010 Immanuel Gfall (HEPHY Vienna) CO 2 Cooling for PXD/SVD IDM Meeting.
Basic Refrigeration Cycle
1 Nikhef Activities on CO 2 Cooling Bart Verlaat, Nikhef Introduction meeting with FOM director W. van Saarloos 1 Picture: LHCb-VELO evaporator.
1 Dept. of Energy Technology, Div. of Applied Thermodynamics and Refrigeration Tube diameter influence on heat exchanger performance and design. Single.
18th March Richard Hawkings Humidity control in the ATLAS ID Richard Hawkings (CERN) JCOV meeting 18/3/04  Overview of humidity and associated gas.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
Cryogenic cavern in Asian site Conceptual design of the cryogenic system Layout of the cryogenic plant for site A & B New layout of the cryogenic system.
1 CO 2 cooling of an endplate with Timepix readout Bart Verlaat, Nikhef LCTPC collaboration meeting DESY, 22 September
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
Overview of basic issues.   The design of the (Outer) Tracker Upgrade for phase 2 has been ongoing for more than 4 years  So far the (implicit) assumption.
CO 2 Development of the Velo Thermal Control System (VTCS)
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
CMS Pixels upgrade CO 2 cooling transfer lines Introduction to the two projects P.Tropea 5 Dec 2012.
Concept idea for the modular 2PACL system for the Atlas ITK 3 June 2015 Bart Verlaat 1.
CRYOGENICS FOR MLC Cryogenic Piping in the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
Cooling R&D at RWTH Aachen Lutz Feld, Michael Wlochal (RWTH Aachen University) CEC Meeting, CERN Lutz Feld, Michael Wlochal (RWTH Aachen University)
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.
CPPM Pixel Evaporative Cooling Plant Description & Operation with C 3 F 8 or C 4 F 10 G. Hallewell, CPPM, Feb 07, 2005.
14 May 2009Hans Postema - CERN CMS Upgrade Workshop Tracker Phase I upgrades 14 May
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
Solar Heating/Cooling/Dehumidifier Systems
CO 2 Cooling: Overview over CMS activities Jennifer Merz RWTH Aachen University, 1. Physikalisches Institut B May CEC General Meeting, Karlsruhe.
Meeting with TUM 1/5/2016P. Petagna – LHC Detector Upgrades: Cooling Visit of the President of the Munich Technical University LHC DETECTOR UPGRADES: COOLING.
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
CMS Pixels upgrade CO2 cooling transfer lines Draft spec – for introduction Paola Tropea & Hans Postema 5 December 2012.
Cooling System Solutions
Jan. 28, 2014W. Bertl, PSI BPIX Cooling Status W. Bertl, PSI.
Neutrino Cryogenics Requirements Meeting 25/09/2014 Day 1 review.
CMS consolidation activities of detector cooling system Detector cooling project P. Tropea.
CO 2 Controlling a 2-phase CO2 loop using a 2-phase accumulator
Reviewers report of the LHCb C0 2 cooling EDR EDR date: 3 rd of December January
CO2 Cooling For the CMS Pixel detector 11 November 20081Hans Postema & Antti Onnela.
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH Design of the thermosiphon Test Facilities Thermosiphon Cooling Review A. MORAUX PH Dpt / DT Group CERN SEPTEMBER.
Aachen Status Report: CO 2 Cooling for the CMS Tracker at SLHC Lutz Feld, Waclaw Karpinski, Jennifer Merz and Michael Wlochal RWTH Aachen University, 1.
A two-stage system for the future cooling system.
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Institut für Experimentelle Kernphysik
High Granularity Calorimeter Workshop Ideas for cooling of a high granularity calorimeter Nick Lumb, IPN-Lyon 02/02/2015.
7 February 2012 Annekathrin Frankenberger (HEPHY Vienna) Open CO 2 Cooling System at the beam test Belle II SVD-PXD Meeting.
CMS Upgrade CERN April 27, 2010 W. Bertl PSI Power & Cooling: Design Status of BPIX.
CERN Cryolab CO 2 cooling for pixel detectors Investigation of heat transfer Christopher Franke, Torsten Köttig, Jihao Wu, Friedrich Haug TE-CRG-CI.
Pixel Cooling Upgrade (2013) 1 December 20081Hans Postema - CERN.
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Institut für Experimentelle Kernphysik
CO 2 Cooling Plants for the LHCb upgrade LHCb infrastructure workshop February Burkhard Schmidt With input from Bart Verlaat, Paolo Petagna and Lukasz.
H. Hayano(KEK), B. Petersen(DESY), T. Peterson(FNAL),
2016/12/6 Yasuhiro R&D status of a gas-compressor based 2-phase CO2 cooling system for FPCCD vertex detector 2016/12/6 Yasuhiro Sugimoto.
For the CMS Pixel detector
AUTOMOTIVE COOLING SYSTEMS
Status of Cooling Development in Karlsruhe
Refrigeration & air conditioning
Dynamic Simulations of CO₂ Cooling Systems
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
Safety approval of the installed copper cooling pipes
For the CMS Pixel detector
Performance of a CO2 System with Four Parallel Pipes
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
Aachen Status Report: CO2 Cooling for the CMS Tracker
Re-circulating CO2 Test System
Pixel CO2 Cooling Status
Detector Technology Group
Recirculating CO2 System
Status Report on Fermilab CO2 cooling activities
CO2 Cooling IPNL Nick Lumb, 28/01/09.
Aachen Status Report: CO2 Cooling for the CMS Tracker
Second Meeting of the Material Budget & Engineering Working Group
Status and Prospects of Tracker Services Hans Postema (CERN)
For the CMS Pixel detector
Presentation transcript:

CO2 cooling in CMS General overview 30 July 20101Hans Postema - CERN

Why CO2? Radiation hard Not electrically conductive, non corrosive Not flammable, not toxic Has excellent thermodynamic properties for micro- channels. Low dT/dP Low mass Low liquid/vapour density ratio Low viscosity High latent heat High heat transfer coefficient Environmental friendly 230 July 2010Hans Postema - CERN

Pressure advantage Intuitively, higher pressures seem a disadvantage but: Gas flow at higher pressures needs smaller pipe diameters Pressure drops due to flow become less significant, allowing smaller pipes Small pipes can easily support the required pressures 330 July 2010Hans Postema - CERN

Pixel barrel structure 430 July 2010Hans Postema - CERN

CO 2 Cooling Test Setup 30 July 20105Hans Postema - CERN PRESSURE GAUGE METERING VALVE OPTIONAL CAPILLARY TUBE DETECTOR TUBE WITH ELECTRIC HEATING MASSFLOW METER CO 2 BOTTLE WITH PLUNGER CONCENTRIC TUBE HEAT EXCHANGER VENT TO ATMOSPHERE PROPORTIONAL RELIEF VALVE WATER BATH HEATER

Straight Tube -10°C 30 July 20106Hans Postema - CERN

Cooling Pipes No space left in CMS to install new supply and return line for CO2 cooling We must reuse the exiting pipes since the currently installed cooling pipes are virtually impossible to replace People ask: “Is this really the case” Please have a look at the following slides 30 July 20107Hans Postema - CERN

Empty YB0 – far left 30 July 20108Hans Postema - CERN

YB0 – fully cabled 30 July 20109Hans Postema - CERN

YB0 - numbers Tracker cooling pipes below all the cables HB: 180 cables, 180 optical fiber cables EB: 1600 cables, 180 optical fiber cables Tracker: 3000 cables, 640 Optical fiber cables 9 month plus, installation time Removing and reinstalling ~10 year old EB cables is inviting trouble 30 July Hans Postema - CERN

Re-use of installed pipes The currently installed pipes are OD=14 and OD=16 mm copper pipes with a wall of 1 mm Cannot be used for 2 phase CO2 cooling without special precaution But can be used when the system design takes care that pressures remain below a limit Avoiding 100+ bar pressures is also advantageous for detector design 30 July Hans Postema - CERN

Storage tank The system contains a cooled storage tank When system is inoperative, all liquid is condensed in the tank, all warm components are filled with gas (Standard for cryogenic systems) A very similar system is used for the CDF COT flange cooling, same concept, different fluid, different temperature. See next slide 30 July Hans Postema - CERN

Which pressures Strong request for detector operation with coolant at +15 C. Avoids condensation during the installation and testing phase. For this a safety valve setting at 57 bar, corresponding to +20 C seems acceptable. Normal operation is below 0 degree C, which corresponds to 35 bar 30 July Hans Postema - CERN

Operation modes Normal operation, system cooled by commercial chiller, CO2 temperatures between 0 and -20 C, pressures 35 to 20 bar Testing during installation, system cooled by chilled water, temperature +15 C, pressure 50 bar Storage during shutdown, cooled by standard CERN chilled water system, temp +5 C, 40 bar 30 July Hans Postema - CERN

Strategy (1) CO2 cooling plants cannot be bought off the shelf Relevant experience is not available in industry Current activities are generating the necessary experience “in house” Future CO2 cooling plants shall be designed and constructed “in house” 1530 July 2010Hans Postema - CERN

Strategy (2) Cooling plant shall be constructed early, leaving 1 year for commissioning on the surface and 1 year for installation in UX To avoid schedule constraints, one cooling plant foreseen for detector commissioning in TIF, and one for installation in the CMS cavern 1630 July 2010Hans Postema - CERN

Cooling plant 1730 July 2010Hans Postema - CERN

Including dummy load 1830 July 2010Hans Postema - CERN

1930 July 2010Hans Postema - CERN

Conclusions Test results of the small tubes inside the detector show very good cooling performance Several re-circulating cooling plants are now operating successfully We need to get full understanding of the flow properties of the large diameter supply and return lines since they cannot be replaced by pipes that are better suited to CO2 cooling 30 July 2010Hans Postema - CERN20

Participating groups CERN – Atlas CERN – CMS CERN – PH-DT CERN – EN-CV CERN – Cryolab EPFL Lausanne Fermilab IPN Lyon NIKHEF – Atlas, LHCb PSI RWTH Aachen SLAC Atlas University Esslingen University Karlsruhe 2130 July 2010Hans Postema - CERN