Scheduling McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.

Slides:



Advertisements
Similar presentations
Johnson’s Rule Johnson’s rule: A procedure that minimizes makespan when scheduling a group of jobs on two workstations. Step 1. Find the shortest processing.
Advertisements

Scheduling.
Process Selection and Facility Layout
Scheduling for Low-volume Operations Chapter 15 Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation.
© The McGraw-Hill Companies, Inc., 1998 Irwin/McGraw-Hill Module 11 Operations Scheduling Chapter 16 (pp ) Work Center and definitions  Objectives.
Scheduling.
© The McGraw-Hill Companies, Inc., Chapter 16 Operations Scheduling.
Theory of Constraints Scheduling APICS PDM January 14, 2009.
1-1 McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved 1 Chapter 19 Operations Scheduling.
DOM 102: Principles of Operations Management Operations Scheduling
23–1. 23–2 Chapter Twenty-Three Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Chapter 16 Scheduling Scheduling
Operations Management
Operations Management R. Dan Reid & Nada R. Sanders
22–1. 22–2 Chapter Twenty-Two Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Scheduling.
Operations Management
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Process Selection and Facility Layout
1 ISQA 459/559 Mellie Pullman Scheduling Shop Floor.
1 Chapter 15 Scheduling. 2 Scheduling: Establishing the timing of the use of equipment, facilities and human activities in an organization Answering “when”
CHAPTER 19 Scheduling Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 16: Learning Objectives
JIT and Lean Operations
Process Selection and Facility Layout
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Operations Management Contemporary Concepts and Cases Chapter Thirteen Scheduling Operations Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights.
Industrial Systems Engineering Dept. İzmir University of Economics
Chapter 16 Scheduling McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Copyright 2009, John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Scheduling Operations Management - 5 th Edition Chapter 17.
Scheduling.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
15-1Scheduling William J. Stevenson Operations Management 8 th edition.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 13 Aggregate Planning.
Operations Management
15-1Scheduling William J. Stevenson Operations Management 8 th edition.
15-1Scheduling Operations Scheduling Chapter Scheduling The Hierarchy of Production Decisions The logical sequence of operations in factory planning.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
1 1 Slide Short – Term Scheduling Professor Ahmadi.
Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Scheduling Process and Production Management.
Topics To Be Covered 1. Tasks of a Shop Control Manager.
Scheduling for Low-volume Operations Chapter 15 Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
Chapter 17 Scheduling. Management 3620Chapter 17 Schedule17-2 Overview of Production Planning Hierarchy Capacity Planning 1. Facility size 2. Equipment.
Scheduling. Definition of scheduling Establishing the timing of the use of equipment, facilities and human activities in an organization In the decision-making.
Scheduling. Scheduling: The allocation of resources over time to accomplish specific tasks. Demand scheduling: A type of scheduling whereby customers.
1 Chapter 10 Scheduling 1 Chapter 10 SCHEDULING McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved.
Scheduling for Low-volume Operations
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10 Aggregate Planning and Master Scheduling
CHAPTER SEVENTEEN SCHEDULING Chapter 17 Scheduling.
CHAPTER 4 : SCHEDULING Presented by: HAMKA BIN TAIP
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 6 Process Selection and Facilities Layout.
Scheduling.
Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Chapter 16: Learning Objectives Instructor Slides You should be able to: 1.Explain what scheduling involves and the importance of good scheduling 2.Describe.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 8 Facility Layout.
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Production Planning and control – ME 1009 Unit 1 Introduction.
Chapter 15 Scheduling McGraw-Hill/Irwin
FACILITY LAYOUT Facility layout means:
Chap 11 Learning Objectives
Scheduling Scheduling is an important tool for manufacturing and service industries, where it can have a major impact on the productivity of a process.
8 Job Sequencing & Operations Scheduling CHAPTER Arranged by
Production and Operations Management
Inputs and Outputs to Aggregate Production Planning
Presentation transcript:

Scheduling McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.

You should be able to: 1. Explain what scheduling involves and the importance of good scheduling 2. Describe scheduling needs in high-volume and intermediate-volume systems 3. Describe scheduling needs in job shops 4. Use and interpret Gantt charts, and use the assignment method for loading 5. Give examples of commonly used priority rules 6. Summarize some of the unique problems encountered in service systems, and describe some of the approaches used for scheduling service systems 16-2 Student Slides

Scheduling: Establishing the timing of the use of equipment, facilities and human activities in an organization Effective scheduling can yield Cost savings Increases in productivity Other benefits 16-3 Student Slides

Flow System High-volume system in which all jobs follow the same sequence Flow system scheduling Scheduling for flow systems The goal is to achieve a smooth rate of flow of goods or customers through the system in order to get high utilization of labor and equipment Workstation 1 Workstation 2 Output 16-4 Student Slides

Outputs fall between the standardized type of output of high-volume systems and the make-to-order output of job shops Output rates are insufficient to warrant continuous production Rather, it is more economical to produce intermittently Work centers periodically shift from one product to another Student Slides 16-5

Job shop scheduling Scheduling for low-volume systems with many variations in requirements Make-to-order products Processing requirements Material requirements Processing time Processing sequence and steps A complex scheduling environment It is impossible to establish firm schedules until actual job orders are received 16-6 Student Slides

Loading the assignment of jobs to processing centers Gantt chart Used as a visual aid for loading and scheduling purposes Purpose of the Gantt chart is to organize and visually display the actual or intended use of resources in a time framework Managers may use the charts for trial-and-error schedule development to get an idea of what different arrangements would involve 16-7 Student Slides

Assignment model A linear programming model for optimal assignment of tasks and resources Hungarian method Method of assigning jobs by a one-for-one matching to identify the lowest cost solution 16-8 Student Slides

Sequencing Determine the order in which jobs at a work center will be processed Priority rules Simple heuristics used to select the order in which jobs will be processed The rules generally assume that job setup cost and time are independent of processing sequence Job time Time needed for setup and processing of a job Student Slides 16-9

Local priority rules: Focus on information pertaining to a single workstation when establishing a job sequence Global priority rules: Incorporate information from multiple workstations when establishing a job sequence Student Slides

Johnson’s Rule Technique for minimizing makespan for a group of jobs to be processed on two machines or at two work centers. Minimizes total idle time Several conditions must be satisfied Student Slides

1. List the jobs and their times at each work center 2. Select the job with the shortest time a. If the shortest time is at the first work center, schedule that job first b. If the shortest time is at the second work center, schedule the job last. c. Break ties arbitrarily 3. Eliminate the job from further consideration 4. Repeat steps 2 and 3, working toward the center of the sequence, until all jobs have been scheduled Student Slides

Theory of constraints Production planning approach that emphasizes balancing flow throughout a system, and pursues a perpetual five-step improvement process centered around the system’s currently most restrictive constraint. Bottleneck operations limit system output Therefore, schedule bottleneck operations in a way that minimizes their idle times Drum-buffer-rope Drum = the schedule Buffer = potentially constraining resources outside of the bottleneck Rope = represents synchronizing the sequence of operations to ensure effective use of the bottleneck operations Student Slides

Varying batch sizes to achieve greatest output of bottleneck operations Process batch The economical quantity to produce upon the activation of a given operation Transfer batch The quantity to be transported from one operation to another, assumed to be smaller than the first operation’s process batch Student Slides

If scheduling is done well: Goods and services can be made or delivered in a timely manner Resources can be used to best advantage Customers will be satisfied It is important to not overlook the importance of scheduling to strategy and competitive advantage Student Slides 16-15