Early Beam Injection in the Fermilab Booster & its Implementation Plan Chandra Bhat Todd’s Operation Meeting 20150212 13/12/2015 Chandra Bhat Abstract:

Slides:



Advertisements
Similar presentations
Measurements of adiabatic dual rf capture in the SIS 18 O. Chorniy.
Advertisements

PIP and the Booster Notch Bob Zwaska October 12, 2011 PIP Meeting.
Proton Beam Measurements in the Recycler Duncan Scott On Behalf of the Main Injector Group.
Muon Coalescing 101 Chuck Ankenbrandt Chandra Bhat Milorad Popovic Fermilab NFMCC IIT March 14, 2006.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Thomas Roser Snowmass 2001 June 30 - July 21, MW AGS proton driver (M.J. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas,
PSB magnetic cycle 160 MeV to 2 GeV with 2.5E13 protons per ring A. Blas 2 GeV magnetic cycle 29/04/ Requirements 1.Present performance: 1E13p from.
-Factory Front End Phase Rotation Optimization David Neuffer Fermilab Muons, Inc.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Eric Prebys, FNAL.  We consider motion of particles either through a linear structure or in a circular ring USPAS, Knoxville, TN, Jan , 2014 Lecture.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, N.Kazarinov.
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
Preliminary design of SPPC RF system Jianping DAI 2015/09/11 The CEPC-SppC Study Group Meeting, Sept. 11~12, IHEP.
First measurements of longitudinal impedance and single-bunch effects in LHC E. Shaposhnikova for BE/RF Thanks: P. Baudrenghien, A. Butterworth, T. Bohl,
Particle dynamics in electron FFAG Shinji Machida KEK FFAG04, October 13-16, 2004.
SNuMI (>1MW) SNuMI 1 Motivations for SNuMI The neutrino experimental program for the next decade –NOνA (long baseline νμ→νe search) –MINERνA (Main Injector.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
EDM2001 Workshop May 14-15, 2001 AGS Intensity Upgrade (J.M. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas, S.Y. Zhang) Proton.
J. Turner 02/07/05 SLAC PEPII Accelerator Physics LER WIGGLER PLAN J. Turner, M. Donald, M. Sullivan, U. Wienands, J. Yocky Motivation and Concerns Details.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, A.Drozhdin, N.Kazarinov.
Recent RF Development at Fermilab Weiren Chou and Akira Takagi Fermilab, U.S.A. July 7, 2003 Presentation to the FFAG03 Workshop July 7-12, 2003, KEK.
Booster Low Level Modules, Timing and some Measurements.
Alexei Fedotov, 02/02/12 1 Potentials for luminosity improvement for low-energy RHIC (with electron cooling) February 2, 2012.
1 Simulation of transition crossing in the Fermilab Booster Xi Yang September 5, 2006 Xi Yang the work has been done in collaboration with Alexandr Drozhdin.
Booster Cogging Bob Zwaska University of Texas at Austin Bill Pellico FNAL.
-Factory Front End Phase Rotation Gas-filled rf David Neuffer Fermilab Muons, Inc.
Elias Métral, LHC Beam Commissioning Working Group meeting, 08/06/2010 /191 SINGLE-BUNCH INSTABILITY STUDIES IN THE LHC AT 3.5 TeV/c Elias Métral, N. Mounet.
Production of bunch doublets for scrubbing of the LHC J. Esteban Muller (simulations), E. Shaposhnikova 3 December 2013 LBOC Thanks to H. Bartosik, T.
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
Damping Ring Parameters and Interface to Sources S. Guiducci BTR, LNF 7 July 2011.
RF improvements over the weekend Giulia on behalf of Delphine, Philippe, Andy and many other people in the RF team LHC Beam Commissioning Working Group,
Second Harmonic capture in the IPNS RCS: Transition from SH to fundamental rf operation during the acceleration cycle using CAPTURE_SPC Jeff Dooling Presented.
SPS proton beam for AWAKE E. Shaposhnikova 13 th AWAKE PEB Meeting With contributions from T. Argyropoulos, T. Bohl, H. Bartosik, S. Cettour.
High Intensity Booster Operations William Pellico PIP II collaboration Nov. 9 th 2015.
Eric Prebys, FNAL.  We consider motion of particles either through a linear structure or in a circular ring USPAS, Hampton, VA, Jan , 2015 Longitudinal.
Early Beam Injection Scheme for the Fermilab Booster: A Path for Intensity Upgrade Chandra Bhat Fermi National Accelerator Laboratory DPF2015, ANN ARBOR,
LER Workshop, Oct 11, 2006Intensity Increase in the LER – T. Sen1 LHC Accelerator Research Program bnl-fnal-lbnl-slac  Motivation  Slip stacking in the.
Beam loss and radiation in the SPS for higher intensities and injection energy G. Arduini 20 th November 2007 Acknowledgments: E. Shaposhnikova and all.
Longitudinal Painting S. Hancock p.p. G. Feldbauer.
Bunched-Beam Phase Rotation - Ring Coolers? - FFAGs? David Neuffer Fermilab.
F Project X: Recycler 8.9 GeV/c Extraction D. Johnson, E. Prebys, M. Martens, J. Johnstone Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
Longitudinal aspects on injection and acceleration for HP-PS Antoine LACHAIZE On behalf of the HP-PS design team.
ELENA RF Manipulations S. Hancock. Apart from debunching before and rebunching after cooling, the principal role of the rf is to decelerate the beam and.
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
ELI PHOTOINJECTOR PARAMETERS: PRELIMINARY ANALYSIS AND SIMULATIONS C. RONSIVALLE.
HP-PS beam acceleration and machine circumference A.LachaizeLAGUNA-LBNO General meeting Paris 18/09/13 On behalf of HP-PS design team.
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Alex Bogacz NuFact’08, Valencia, Spain, July 4, 2008 Acceleration.
RF manipulations in SIS 18 and SIS 100 O. Chorniy.
Beam Manufacture in PS2 M. Benedikt, S. Hancock. LHC Beams in the PS by 2015 Typeh injε l inj [evs] h ejN bunch ej RF ej [MHz] ε l ej [evs] τ ej [ns]
Towards a Common Proton Driver for a Neutrino Factory
Bocheng Jiang SSRF AP group
Impact of the current debuncher limitations (…can we get rid of longitudinal painting?)
402.5 MHz Debunching in the Ring
Alternative/complementary Possibilities
PSB rf manipulations PSB cavities
New AD Production Beam in the PSB
Multiturn extraction for PS2
CEPC Injector Damping Ring
LHC (SSC) Byung Yunn CASA.
November 14, 2008 The meeting on RIKEN AVF Cyclotron Upgrade Progress report on activity plan Sergey Vorozhtsov.
November 7, 2008 The meeting on RIKEN AVF Cyclotron Upgrade Progress report on activity plan Sergey Vorozhtsov.
Simulating transition crossing in the PS with HeadTail
I-LHC NOMINAL ions beam in 2007
JLEIC Ion Integration Goals
CDR2 – Injection System Injection system overview (Seeman) (2 pages)
Some Thoughts on the JLEIC Ion Injector
Optimization of JLEIC Integrated Luminosity Without On-Energy Cooling*
Updated MEIC Ion Beam Formation Scheme
Presentation transcript:

Early Beam Injection in the Fermilab Booster & its Implementation Plan Chandra Bhat Todd’s Operation Meeting /12/2015 Chandra Bhat Abstract: Over the past 6-8 months we have made significant progress in understanding the Early Injection Scheme (EIS) via simulations as well as by the experiments in the Booster. The studies needs dedicated beam time, hence, we developed 1-shot sequence which will help us to make progress in the beam studies even during the nominal beam operation. The results from the simulations on the EIS shows that one can operate Booster at a lower rf power, produce lower emittance beam and no beam losses under current operational scenario. The conclusions from a preliminary analysis (presented here) of the beam data from EIS are, 1) one can lower the rf power by ~15%, 2) beam delivery efficiency is about 90%, comparable to that with the current operation, even with a part of the scheme implemented in the tests. We present game plan for implementation of the full scheme in operation.

Schematic of the Beam Capture in the Booster ~60  s debunching 1/30s  s Bmin Booster B-curve Present operation: Beam Inj. 360  s for rf capture and acceleration  40  s injection 23/12/2015 Chandra Bhat 260  s for rf capture (no debunching) 150  s Early Beam Inj. Scheme Change in Es <0.24MeV the energy acceptance >  2MeV Beam  E <  0.8MeV f sy = 8kHz-27kHz for Vrf=0.035MV-0.4MV Begin Injection Early Beam Inj. Scheme can produce lower emittance beam to downstream accelerators

Beam Studies on Early Injection Scheme  The Beam studies were made on $17  Following Changes were made:  beam injection at 144  s earlier than BDOT=0.0  B:RSTDLY changed to 64491µs from nominal value of µs  New RF, ROF and Paraphase curves, B:VFINJ  Additional tuning was needed at transition crossing (some times) 3 13BT The beam lifetime was good for > First 1 ms! 3/12/2015 Chandra Bhat

New Settings for a few Parameters B:PARAT B:ROFB:RAGT B:APG B:CIGT

Beam Efficiency on $17 with 13BT ~90% efficiency was achieved. Goal is (82/84)  97% with notch.

Studies Continued with B:RSTDLY=64635 (standard Val.)  Did continue our beam studies to optimize the APG and ROF curves on $17, B29 (Ramp 8) to smooth and reduce the RF power. 3/12/2015 Chandra Bhat6 >90% beam efficiency with 13BT. APG-Nominal APG-New B:ROF-New B:ROF-Nominal BLM data Fast bunch rotation APG-New B:ROF-New Beam The difference between new and nominal APG (Vrf) curves on the cycle are shown for comparison.

Samples of Transverse Beam Sizes for the First 2 ms 3/12/2015 Chandra Bhat 7 Data are for 14BT beam

Game plan & Issue  Early Injection Scheme can be made operational immediately  Set the B:RSTDLY = µs  Set new values for B:VFINJ, B:TTRXnn (turn dependent), … parameters indicated in earlier. This enables us to start beam capture immediately after Bmin.  Our immediate goal is to provide the beam with efficiency >85% (so far we have proved efficiency ~90% with 13BT).  We may have to inform the users about this new development and why we are doing this.  No showstopper  We will continue to optimize various parameters for better efficiency (similar to what is currently being done). This tuning is transparent to down-stream machines. Also improve on  PARAT, APG, ROF … curves, tune, chromaticity curves etc., 83/12/2015 Chandra Bhat This gives us an ability to make progress; reaching 97% efficiency with notch in place.

Game plan & Issue (cont.)  So far, we have taken only the partial benefits of Early Injection Scheme, i.e.,  Start beam rf capture immediately after Bmin though beam injection is about 144 µs earlier (in contrast, operationally we wait for 100s of µs on the up-ramp before rf paraphrase is turned on).  To take full benefit we need  To move the beam capture soon after the completion of the beam injection, i.e., B:VCDLY and B:VFIDR need to be referenced to TCLK  Currently, we use a calculated frequency curve which does not match with the value at injection (therefore we adjust B:VFINJ). We need better frequency synchronization bet. LLRF and real freq..  We also work on fast bunch rotation at extraction which is more clean and gives better lower energy spread beam to slip-stacking in RR.  If LINAC can give us more number of turns we can accommodate them! 93/12/2015 Chandra Bhat

Backup slides

Simulation of Beam Capture at Injection Early Injection Scheme: Beam Inj. at -144  s w.r.t. Bmin (17BT) Operational Scheme: Beam inj. at -11  s w.r.t. Bmin (17BT) Bucket Area=0.065 eVs  L = eVs No Beam loss Vrf  s) = 0.81 MV Bucket Area = 0.07 eVs  L = 0.06 eVs ~2% Beam loss even without SC effects Used dE Inj=  0.8 MeV (Measured at Inj.) 11 ~150  s after Bmin – end of capture ~220  s after Bmin – end of capture 3/12/2015 Chandra Bhat

Early Inj. Scheme: Beam at ~1ms w.r.t. Inj. Beam Inj. at -144  s w.r.t. Bmin (16BT) Simulations with longitudinal SC(symmetric) Vrf  s) = 0.44 MV Bucket Area=0.06 eVs  L   × 0.008µsc × 1.8 MeV = eVs No Beam loss even with SC effect ~30% lower rf power on average over the cycle 1ms w.r.t. Beam inj. Bmin(E s min) Vrf EsEs End of Capture 12 Injection region 3/12/2015 Chandra Bhat

Simulation for Injection  Extraction in the Booster Proposed Scheme: at -100  s, Capture from -64  s to 135  s, with a phase kick of ~ 6 deg after transition crossing. This video is for Inj  Extraction Mimic of Operational Scheme 13 VIDEO

Recent Beam Studies on Early Injection Preliminary Beam (no notch) APG Beam (with notch) BDOT=0.0 RF Beam WCM Beam BDOT

Beam Studies on Early Injection Scheme 12 BT after transition tuning Conditions: 1)beam injection at 144  s earlier than BDOT=0.0 2)New RF, ROF and Paraphase curves 3)Additional tuning was done at transition crossing Flans: We would like to start beam capture as early as possible after the beam injection with proper frequency curve. This needs some changes to the timing and hardwares. This work is in progress.