Resource Loading and Leveling Kathy S. Schwaig. A Roadmap of the Project Planning Process Develop project charter Establish work breakdown structure Analyze.

Slides:



Advertisements
Similar presentations
Project Management Concepts
Advertisements

Chapter 2 The Analyst As Project Manager In Managing Information Systems 2.3.
Copyright 2006 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Third Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Scheduling Resources and Costs CHAPTER EIGHT Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Chapter 8: Scheduling Resources and Costs
MANAGING PROJECT RESOURCES. Resource Allocation Problem  A shortcoming of most scheduling procedures is that they do not address the issues of resource.
Chapter 10 Resource Management. Objectives Human Resource Management Capital Resource Management Managing the Resource Profile.
Network Analysis and Duration Estimating Kathy S. Schwaig.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Project Management 6e..
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
Software Project Management
Resource Planning. 51 Resource Planning Estimating Schedule Activity Resource Requirements Determining what resources will be required (labor, equipment,
CHAPTER 4 MANAGING PROJECT PROCESSES. THE CONCEPT A project is an interrelated set of activities that has a definite starting and ending point and that.
Project Management (2) Chapter 16, Part 2. EJR 2006 Review of Project Management, Part 1 What is a project? Examples of projects Project performance expectations.
CS3773 Software Engineering Lecture 8 Software Planning and Estimation.
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Project Management.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
Chapter 4: Project Management Objectives Define the terms project and project management, and differentiate between project and process management. Describe.
What is a project? Project Management Institute definition
Class 28: Chapter 16: Project Management Class 28 Agenda –Collect Player Diary 2 and Conduct Player Audit No ed diaries – 5 PM Deadline –Discuss Grade.
Software project management (intro) Resource allocation.
Software project management (intro)
Chapter 9. Intro  What is Project Management?  Project Manager  Project Failures & Successes Managing Projects  PMBOK  SDLC Core Process 1 – Project.
CHAPTER 8: RESOURCE ALLOCATION NET481: Project Management Afnan Albahli.
Chapter 8: Resource Allocation NET481: Project Management Afnan Albahli.
MANAGING PROJECT RESOURCES
Copyright 2002 Prentice-Hall, Inc. Managing the Information Systems Project 3.1 Chapter 3.
PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#10 DEPARTMENT OF ENGINEERING MANAGEMENT.
Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall Essentials of Systems Analysis and Design Fourth Edition Joseph S. Valacich Joey F.
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Essentials of Systems Analysis and Design Fourth Edition Joseph S. Valacich Joey F.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
MANAGING PROJECT RESOURCES
Copyright 2006 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Third Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Time/Cost Trade-off Analysis
BIS 360 – Lecture Two Ch. 3: Managing the IS Project.
Managing Project Resources. Project Resources Human Resources Project stakeholders: – Customers – Project team members – Support staff Systems analyst.
© The McGraw-Hill Companies, Software Project Management 4th Edition Resource allocation Chapter 8.
Scheduling Resources and Costs CHAPTER EIGHT Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Chapter 11. Intro  What is Project Management?  Project Manager  Project Failures & Successes Managing Projects  PMBOK  SDLC Core Process 1 – Project.
The Resource Problem Resources and Priorities
Scheduling Resources and Cost
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
PMI-Planning Process Group Lecture 08 Ms Saba Sahar.
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design.
Information Systems System Analysis 421 Chapter 3 Managing the Information Systems Project.
Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall Chapter 3 Managing the Information Systems Project 3.1.
Copyright 2001 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Chapter 2 Managing the Information Systems Project 2.1.
MARCH 1 Project Management Problem statement l no hurdles, no problem just a goal l open-ended … no single correct answer l closed-ended … single answer.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
16 Scheduling (focus on sequencing; FCFS, SPT, EDD pages , and Johnson’s rule pages ) Homework; 6, 7, 11.
6 Resource Utilization 4/28/2017 Teaching Strategies
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
University Of Palestine Faculty Of Applied Engineering & Urban Planning Civil Engineering Department PROJECT MANAGEMENT Scheduling Resources and Costs.
Chapter 11 Project Management.
Software Project Management
Project Management -- Scheduling Resources and Costs
Chapter 3 Managing the Information Systems Project
PMIS Initiating a Project Application of Project Management Processes Project Charter Stakeholder Analysis and Stakeholder Register 2. Planning.
ENGINEERING MANAGEMENT (GE 404)
Software Project Management Fifth Edition
Project Management Chapter 11.
Where We Are Now. Where We Are Now The Resource Problem Resources and Priorities Project network times are a schedule until resources have been assigned.
Chapter 2 Managing the Information Systems Project
Chapter 3 Managing the Information Systems Project
Presentation transcript:

Resource Loading and Leveling Kathy S. Schwaig

A Roadmap of the Project Planning Process Develop project charter Establish work breakdown structure Analyze sequencing relationships Estimate “normal” activity durations Perform network calculations Validate/revise initial schedule Perform time-cost tradeoff analysis Load resources to activities Resolve any resource/workload imbalances Develop budget and cash flow plan based on analysis of direct and indirect costs Our Focus Today

What is a Resource? What’s a resource? A resource is any entity that contributes to the accomplishment of project activities Personnel Equipment Contractors Space Materials

Resource Planning Resource planning is the process of making sure resources are available as required to execute the project according to schedule Questions to ask: What type of resource is required? How much resource is required? When and how long is the resource needed? Where is the resource required?

Resource Loading Resource loading involves specifying the types and quantities of resources required to complete each activity in a project Note that resources are loaded not at the project level, but at the activity level Resources can be identified By name (if you have individual professionals with unique skills, this is a reasonable approach) By generic type (e.g., system analysts)

How Do We Quantify Resources Used? One way is to use some measure of resource usage Programmer days Staff hours Equipment hours Another way is to indicate the number of units of resource assigned Programmers Workstations

Scheduling Resources A resource requirements list can be constructed by listing each activity and the resources that will be required Example Required resources are then mapped to the activity plan to assess the distribution of resources required over the duration of the project ActivityResourceDaysNotes Design database Systems Analyst 7 F/T

Developing a Resource Profile EPS 2 DUR 4 EPC 6 LAC 11 TS 5 LAS 7 D EPS 7 DUR 4 EPC 11 LAC 12 TS 1 LAS 8 G EPS 7 DUR 1 EPC 8 LAC 12 TS 4 LAS 11 F EPS 11 DUR 3 EPC 14 LAC 15 TS 1 LAS 12 J EPS 15 DUR 0 EPC 15 LAC 15 TS 0 LAS 15 End EPS 0 DUR 2 EPC 2 LAC 7 TS 5 LAS 5 A EPS 2 DUR 8 EPC 10 LAC 10 TS 0 LAS 2 H EPS 2 DUR 5 EPC 7 LAC 8 TS 1 LAS 3 E EPS 10 DUR 5 EPC 15 LAC 15 TS 0 LAS 10 K EPS 0 DUR 2 EPC 2 LAC 2 TS 0 LAS 0 B EPS 1 DUR 3 EPC 4 LAC 10 TS 6 LAS 7 I EPS 0 DUR 0 EPC 0 LAC 0 TS 0 LAS 0 Start EPS 0 DUR 1 EPC 1 LAC 7 TS 6 LAS 6 C (0) (2) (5) (4) (3) (2) (1)(2) (0) (2) (1) (2) Numbers in ( ) show number of people needed for each activity

Developing a Resource Profile Day A B CDE F G H I K J

Developing a Resource Profile Resource Requirement (programmers) Time Period (days) Ideal profile

Resolving Workload/Resource Imbalances Request additional resources Plan to work overtime Contract out work Delay start or extend durations of non- critical activities Change the approach used to perform the work Reduce project scope or extend project deadline

Resource Leveling Scheduling resources by earliest possible start date often leads to an uneven resource profile that is more likely to call for levels of resource beyond those available By adjusting the start date of some activities and splitting others, we can achieve a more level resource profile, reducing the maximum level of demand for limited resources

Resource Leveling Allocating a resource to one activity limits the flexibility for resource allocation and scheduling of other activities Resources should be allocated to activities in some rational order The priority must always be to allocate resources to critical path activities and then to those activities that are most likely to affect others In this way, lower priority activities are made to fit around the more critical, already scheduled activities

Approaches for Prioritizing Activities Total slack priority Activities are ordered according to their to total slack, those with the smallest total slack having the highest priority Ordered list priority 1. Shortest critical activity 2. Critical activities 3. Shortest non-critical activity 4. Non-critical activity with least slack 5. Non-critical activities