Cooling System Solutions

Slides:



Advertisements
Similar presentations
1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
Advertisements

24 June 2010 Immanuel Gfall (HEPHY Vienna) CO 2 Cooling for PXD/SVD IDM Meeting.
HVAC System Design PES Institute of Technology. Objective Goal: To develop an automotive air-conditioning system that is smaller and lighter than with.
M. Battistin – 1 st September 2009 EN/CV/DC 1 M. Battistin (EN/CV/DC) 1 st October 2009 ATLAS cooling Group - Thermosiphon solution for ATLAS ID cooling.
Cooling Update (May 2011) Tim. Overview From last time – Estimate Power Loads Active components Extraneous heat sources – Develop methodology for exploring.
TOTEM Collaboration Meeting, Feb. 2005, F. Haug, CERN Cooling System for TOTEM Friedrich Haug and Jihao Wu Cryogenics for Experiments CERN TOTEM Collaboration.
CO 2 return pressure drop budget and pipes from PP2 to tracker Georg Viehhauser.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Large-capacity Helium refrigeration : from state-of-the-art towards FCC reference solutions Francois Millet – March 2015.
Chilled water Meyrin consolidation Study 1 st Part Many thanks for their contribution to: Pasquale Alemanno, Fortunato Candito, Alexander Putzu.
1 CO 2 cooling of an endplate with Timepix readout Bart Verlaat, Nikhef LCTPC collaboration meeting DESY, 22 September
13th April 2005R.Bates, QM Measurements of Barrel and EC HEX R. Bates, M. Olcese, B. Gorski, QM for prototype builds.
Detector Cooling Project Thermosiphon Project Status Report
CMS CO2 Test Stand Specifications and Installation Status Erik Voirin Fermilab PPD - Process Engineering Group CMS CO2 Cooling Test Stand1.
Heat Transfer Equations For “thin walled” tubes, A i = A o.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire 1CERN - 4th November 2011 Experience from Construction.
20 th June 20111Enrico Da Riva, V. Rao Project Request and Geometry constraints June 20 th 2011 Bdg 298 Enrico Da Riva,Vinod Singh Rao CFD GTK.
19 th November 2010EN/CV/DC Thermosiphon project IV review - Overall cost estimation and planning Michele Battistin Elena Perez Rodriguez 19 th November.
Update on UT cooling specifications and status of activities LHCb CO2 cooling meeting 8/7/2015 Simone Coelli For the Milano UT group INFN milano 1 Istituto.
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.
J. Direito - M. Battistin – 28 th May 2010EN/CV/DC J. Direito, M. Battistin (EN/CV/DC) 28 th May 2010 Detector Cooling Project III Thermosiphon Workshop.
1 BREC Air-cooled water chillers BREF Air-cooled water chillers with free-cooling system 1602A A A A A 3202A A A -
Full Scale Thermosyphon Design Parameters and Technical Description Jose Botelho Direito EN/CV/DC 19 November, th Thermosyphon Workshop.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
LHCb-VELO Microchannel fracture safety system and evaporator concept 26 June 2015 Bart Verlaat 1.
Detector Cooling CERN, September 28, 2006 Jaak Lippmaa HIP, University of Helsinki.
CO 2 Cooling: Overview over CMS activities Jennifer Merz RWTH Aachen University, 1. Physikalisches Institut B May CEC General Meeting, Karlsruhe.
Cooling plant upgrade Jose Botelho Direito, Michele Battistin, Stephane Berry, Sebastien Roussee 2 nd SPD Cooling Workshop 30/11/201112nd SPD.
Overview WG4 Meeting - 16th October 20121M. Gomez Marzoa, E. Da Riva Maximum ΔT admissible at cooling system T_1 T_2 T_1+0.5*ΔT Stave  If T_2 – T_1 =
Heat Transfer Equations For “thin walled” tubes, A i = A o.
CO2 cooling in CMS General overview 30 July 20101Hans Postema - CERN.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
CO 2 Controlling a 2-phase CO2 loop using a 2-phase accumulator
Reviewers report of the LHCb C0 2 cooling EDR EDR date: 3 rd of December January
LHCb Install Meeting - 12 / 05 / 2004 Paolo Guglielmini - TS / CV LHCb Cooling of the sub – detectors INNER TRACKER TRACKER TRIGGER RICH 1 RICH 2 Status.
Cooling of GEM detector CFD _GEM 2012/03/06 E. Da RivaCFD _GEM1.
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH Design of the thermosiphon Test Facilities Thermosiphon Cooling Review A. MORAUX PH Dpt / DT Group CERN SEPTEMBER.
COOLING BY EVAPORATION OF PERFLUOROCARBONS Why evaporate? 1. To enhance the heat transfer per unit area The heat transfer coefficient increases significantly.
Thermosiphon Project for ATLAS ID C 3 F 8 Evaporative Cooling - Status Report ATLAS ID Week CERN – Geneva October 28 th, 2013 M. Battistin & all TS team.
Aachen Status Report: CO 2 Cooling for the CMS Tracker at SLHC Lutz Feld, Waclaw Karpinski, Jennifer Merz and Michael Wlochal RWTH Aachen University, 1.
Microchannel Cooling D. Bouit, J. Daguin, A. Jilg, L. Kottelat, A. Mapelli, J. Noel, P. Petagna, G. Romagnoli – CERN PH-DT K. Howell – Georges Mason University.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
A two-stage system for the future cooling system.
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
7 February 2012 Annekathrin Frankenberger (HEPHY Vienna) Open CO 2 Cooling System at the beam test Belle II SVD-PXD Meeting.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
Ullrich, DESY Dubna GDE XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser 1 Water cooling XFEL Desingn of the XFEL water cooling.
For more information, please contact 24/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Installation rules and guidelines
Paolo Guglielmini - TS / CV LHCb Install Meeting - 24/05/2006 LHCb - Install Meeting 24/05/06 TS/CV/DC activities for LHCb: - IT, TT, OT & SPD/PS, RICH.
1M. Battistin M. Battistin CERN EN/CV/DC 9 th July 2009 CO2 kick-off NIKHEF - Cooling activities organization at CERN 9 th July 2009.
Demineralised water cooling system
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
For the CMS Pixel detector
Performance of a CO2 System with Four Parallel Pipes
cooling for BGV modules
M. Battistin CERN EN/CV/DC 9th July 2009
Aachen Status Report: CO2 Cooling for the CMS Tracker
Aachen Status Report: CO2 Cooling for the CMS Tracker at SLHC
COOLING & VENTILATION INFRASTRUCTURE
EN-CV: P8 systems and Detector Cooling
Recirculating CO2 System
VELO Thermal Control System
Members of project: Christian Brosch Andreas Maier Tamara Bubeck
Aachen Status Report: CO2 Cooling for the CMS Tracker
VITALITY Large Splits Johnson Controls PowerPoint Guidelines | July 21, 2009.
Presentation transcript:

Cooling System Solutions SiPM Fiber Tracker Cooling System Solutions Michele Battistin – Enrico Da Riva CERN Engineering Department Cooling and Ventilation Group Workshop on SiPM cooling for Fiber Tracker CERN, 17th October 2013 SiPM Cooling for Fiber Tracker M. Battistin - E. Da Riva

AGENDA Perfluorocarbon or not perfluorocarbon?? evaporative solution mono-phase solution Details on the pre-study for SiPM cooling SiPM Cooling for Fiber Tracker M. Battistin - E. Da Riva

C3F8 Evaporative Cooling System POTS STATIONS LOCATION TOTEM Roman Pots C3F8 Evaporative Cooling System Eng Spec EDMS 778214 v1 POTS STATIONS LOCATION XRP1 XRP1 XRP3 XRP3 Main station DESIGN PARAMETERS SiPM Cooling for Fiber Tracker M. Battistin - E. Da Riva

Evaporative system @ C3F8 Roman Pot cooling Evaporative system @ C3F8 2006 costs SiPM Cooling for Fiber Tracker M. Battistin - E. Da Riva

TOTEM RP cooling C3F8 main working points SiPM Cooling for Fiber Tracker M. Battistin - E. Da Riva

TOTEM RP Cooling System Schematic SiPM Cooling for Fiber Tracker M. Battistin - E. Da Riva

Could C3F8 or C2F6 Evaporative System Be the Solution for SiPM Fiber Tracker? The solution has already been used for TOTEM Roman Pots and ATLAS Blends Low operation temperature easily achivable (-43°C during Totem tests with C3F8 – lower with C2F6); Low opeartion pressure on the detector (0.8 - 1 bara); Temperature stability and uniformity is granted by the evaporation pressure; Tranfer lines operates at ambient temperature: can be very long (300 m for Totem). The cooling station can be in an accessible area (no operation in the protected zone); Known technology both on detector structure than on the cooling system The system is running since 2007 with high reliability; Cost estimate (based on TOTEM and ATLAS-Blends cooling): Cooling station 250 kCHF @ 2007 (EN-CV-DC mechanical and electr. construction); Copper not insulated transfer lines 30-50 kCHF; Manifolding ?? Do we need to use C3F8? NO No radiation -> other industrial refrigerants (more green) could be studied (R23; R125;…) SiPM Cooling for Fiber Tracker M. Battistin - E. Da Riva

For each distribution line Large cost reduction possible A mono-phase system ?? Chiller 1 -50°C 8 kW Transfer Line(s) UX85 experiment SiPM Fiber Tracker liquid tank 2 redundant pumps 3 m3/h Manual on/off valve Cryo extension Manual regul valve For each distribution line - Large cost reduction possible reducing loops number Chiller 2 -50°C 8 kW T regulation heater UX85 protected Filter section SiPM Cooling for Fiber Tracker M. Battistin - E. Da Riva

Could C6F14 Mono-phase System Be the Solution for SiPM Fiber Tracker? The solution has already been used for 13 cooling systems for LHC Exp. detectors LHCb Inner Tracker, Trigget Traker, Rich1&2; Low operation temperature easily achivable (-50°C or less) depending on chiller selection; Low opeartion pressure on the detector (3-5 bar); Temperature stability and uniformity is granted by a fast T regulation heater; Tranfer lines shall be insulated (0.5 K temperature rise – see: E. Da Riva); Known technology both on detector structure than on the cooling system Refers to E. da Riva presentation this morning for the on-detector solution; Cost estimate (based on LHCb IT-TT-Rich cooling systems) Cooling station: 140-180 kCHF @ 2013 (tendered); Insulated transfer lines 80-100 kCHF; Manifolding: about 1500 CHF/cooling loop (based on 48 loops of 6 modules – see E. Da Riva presentation); Do we need to use C6F14? NO No radiation -> other industrial (more green) fluids are available (NOVEC646 – see: E. Da Riva). SiPM Cooling for Fiber Tracker M. Battistin - E. Da Riva

Conclusions Perfluorocarbons have no advantages: alternative fluids can be used in the same process installation. Liquid mono-phase cooling appears more appealing for cooling system simplicity (installation & maintenance cost) cooling efficiency (operation cost) Two-phases allows warm small pipe distribution up to the protected “enclave” (integration issues) SiPM Cooling for Fiber Tracker M. Battistin - E. Da Riva

Thanks for your attention You can find as back-up the details of the C6F14 single-phase cooling system preliminary design done by Enrico Da Riva “Order of magnitude estimate for open discussion” SiPM Cooling for Fiber Tracker M. Battistin - E. Da Riva

liquid tank Chiller ~70 m 6 modules connected in series X 48 branches manual ON-OFF valve FLOW REGULATION Very simple design, as compared to traditional two-phase systems, which would require 288 capillaries, automatic pressure regulation valve(s), (two-stage) compressor, lubricant-free compressor or dealing with oil return issues, higher system pressure …; Only evident drawback: lines must be insulated, while two-phase system can have warm lines up to the capillaries and heater or water heat exchanger at the modules outlet; Temperature stability demanded to the chiller only, no other regulation needed (constant heat load); C6F14 is not binding, “green” fluids such (e.g. its substitute NOVEC649) can be used, but tests needed. SiPM Cooling for Fiber Tracker M. Battistin - E. Da Riva 12

MAIN DISTRIBUTION LINE MAIN COMPONENTS Chiller power: 5~8 kW @ -50°C (~5 kW from modules in the very worst case scenario assuming 20 W per module, ~3 kW due to heat pick-up along lines); Pump: 3.3 m3/h, Δp ≤ 3 bar; Mass of C6F14: ~300 kg; 96 on/off valves (2 per branch); 48 manual flow regulation valves (1 per branch); Liquid tank / expansion vessel (~200 L); 336 connectors between modules; MAIN DISTRIBUTION LINE DN32 (o.d. 42 mm), 1 m/s, 70 m + 70 m (a/r); 5 cm armaflex insulation, Tsurface ~ 17°C, heat pick-up ~12 W/m; Temperature rise along 70 m: ~ 0.5 K; Δp along 70 m + 70 m ≤ 1 bar SiPM Cooling for Fiber Tracker M. Battistin - E. Da Riva 13

EXPECTED SILICON DIE TEMPERATURE (worst case scenario) MODULES LINES 48 branches, 6 modules fed in series; i.d. 4 mm, o.d. 6 mm, 1.5 m/s; 3 cm armaflex insulation, Tsurface ~ 17°C, heat pick-up ~ 6 W/m; Refrigerant temperature rise along 5 m of insulated line: <1 K; Refrigerant temperature rise through 6 modules: 3.6 K [assuming 20 W per module]; HTC: 1200 Wm-2K-1, refrigerant-to-wall ΔT: 2.6K [assuming 20 W per module]; Δp through 6 modules (3 m + 24 bends) ≤ 1 bar. EXPECTED SILICON DIE TEMPERATURE (worst case scenario) Assumption, ΔT through ceramic stiffener, flex-cable, teflon substrate < 3K; Silicon die at the beginning of the first module fed: -43.9°C; Silicon die at the end of the last module fed: -40.3°C. SiPM Cooling for Fiber Tracker M. Battistin - E. Da Riva 14

Serial vs parallel module connection Serial connection is to be preferred to parallel connection: Much lower length to insulate → easier to install, lower heat load; Optimal flow rate in every module (good for HTC inside the pipes and heat pick up); Connectors can be installed between each module: in case of problems the two on/off valves can be closed, only 6 modules over 288 will be off, the faulty module alone can be removed. ~3m SiPM Cooling for Fiber Tracker M. Battistin - E. Da Riva 15