J.H. ChrzanowskiMod Coil R&D Update1 Modular Coil R&D Update April 2, 2003 James H. Chrzanowski.

Slides:



Advertisements
Similar presentations
American Institute of Steel Construction Charlie Carter Vice President and Chief Structural Engineer.
Advertisements

Mechanical Properties of the NCSX Modular Coil Conductor 14 January 2004 Leonard Myatt Myatt Consulting, Inc.
Summary of Twisted Racetrack / Clamp Analysis K. D. Freudenberg.
IHEPTrip Cherrill Spencer 12/20/05 1 Report on my December 2005 Trip to IHEP, Beijing to Monitor Fabrication of ATF2 Quads By Cherrill Spencer, SLAC, for.
J.H. ChrzanowskiMod Coil R&D Update1 Modular Coil R&D Keystone Activities April 30, 2003 James H. Chrzanowski.
J. H. ChrzanowskiNSTX TF Flag Joint Design Review1 NSTX TF Flag Joint Design Review Fabrication and Assembly April 10, 2003 By: James H. Chrzanowski.
NCSX Vacuum Vessel Overview Paul Goranson WBS 12 Manager Vacuum Vessel Manufacturing Study Kickoff meeting April 29, 2003.
GLAST LAT ProjectF2F, June 15, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety Assurance Manager.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Rapid prototyping is a computer program that constructs three-dimensional models of work derived from a Computer Aided Design (CAD) drawing. With the use.
Metrology for NCSX Steve Raftopoulos and the NCSX Metrology Team.
NCSX Modular Coil Turning Fixture FDR. FDR Charge (answers were added below after the review) Modular Coil Turning Fixture FDR - Charge to Reviewers –The.
Records Search Demonstration. Page 2 Records Search Options  Searching Across All Records  Searchable Fields for the Simple Search Box  Records Option.
NCSX May 12, 2005 ACC Review- Station 5 J.H. Chrzanowski - 1 ACC Review Of Modular Coil Manufacturing Facility Station No. 5 [VPI] the NCSX Manufacturing.
Manufacturing Engineering Department Lecture 9 – Automated Inspection
Eucard WP 7.3 HFM Winding and tooling tests Insulation choice F.Rondeaux /01/2011 Dipole design review- II-8 Winding and tooling tests – insulation.
NCSX Metrology 1/7/04. Short term purchase recommendation Buy the Spatial Analyzer Software package –This software will be the user interface for operating.
September 30, 2003 NCSX Modular Coil Winding Form Prototype FDR1 NCSX Prototype Modular Coil Winding form FDR Phil Heitzenroeder PPPL September 30, 2003.
SC Project Review of NCSX, April 8-10, 2008 NSCX Poloidal Field Coils Michael Kalish.
NCSX Modular Coil Composite Conductor Torsion Measurement of the Conductor Shear Modulus at Both Room and Liquid Nitrogen Temperatures 15 Dec 2004.
NCSX Modular Coil Turning Fixture FDR. Background Modular Coil winding forms are cast structures which provide the foundation on which the coils are constructed.
Ultra-Compact Electrical Machines for Wind Energy DE-FOA : Demo Machine C. L. Goodzeit and M. J. Ball May 1, 2014 General List of Tasks by Performance.
1 NCSX Modular coil winding pack To shim or not to shim? NCSX WBS 1 Engineering Meeting July 7, 2004 What is requirement? What is baseline winding pack.
LQ status and plans – G. Ambrosio 1 LARP Collaboration Meeting - LBNL, April , 2006 BNL - FNAL - LBNL - SLAC OUTLINE: Goals, Input and Output Sub-tasks.
Measurement of Modular Coil Keystone Effect Peer Review 4/1/03.
1 WBS 1 Design Analysis Status NCSX Analysis Meeting Dec 3, 2003.
June 12, 2003FDR Race Track Test Coil1 Final Design Review Racetrack Test Coil James H. Chrzanowski (PPPL) and Oak Ridge National Laboratory June 12, 2003.
J.H. ChrzanowskiMod Coil R&D Update1 Modular Coil R&D Update April 9, 2003 James H. Chrzanowski.
Fred Nobrega, Nikolai Andreev 21 September, 2015.
Twisted Racetrack Manufacturing & Metrology. Winding/metrology prototype chronology Various keystoning tests – Completed. –Established keystone effect.
Dan Cheng Mar 6, 2014 QXF Instrumentation Trace Fabrication Update.
A Review of NCSX Conventional Coil Insulation Stresses Presented by Leonard Myatt.
NCSX A. Brooks, P. Fogarty, G. Lovett, D. Williamson June 3, 2005 Modular Coil Type-C Final Design Review – Part II.
NCSX Metrology. Goals –Need to accurately make measure measurements for several NCSX systems Modular coil –As-built measurements of coil form –Conductor,
Metrology Milestones Metrology Task Force –Vacuum vessel manufacture - P. Goranson –Mod. Coil Form manufacture - D. Williamson –Mod. Coil winding- S. Raftopoulos.
1 Short Model Coils George Ellwood, Simon Canfer Jan 08.
NCSX NCSX TF Coil Procurement 1 February 3, 2006 Michael Kalish NCSX TF Coil Procurement.
E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, F.O Pincot, X. Sarasola
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
NCSX NCSX Conceptual Design Review1 Manufacturing and R&D Phil Heitzenroeder for the NCSX Engineering Team.
Purpose and Goals of the NCSX Conference Call on Modular Coil Analyses February 25, 2004 ??
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
NCSX David Johnson August 18, 2004 Discussion of Co-Wound Flux Loops.
NCSX Field Period Assembly (FPA) Operations, Cost and Schedule, Staffing, and Metrology Utilization Mike Viola Field Period Assembly Manager NCSX FPA Peer.
11/2/2005Mike Viola1 November Lehman Review November 2, 2005 NCSX VVSA NCSX Vacuum Vessel Fabrication Major Tool and Machine – S F 3 120° segments.
F. Dahlgren -SC Project Review of NCSX, April 8-10, 2008 PF, TF, & Trim Coil Supports (WBS-15) Core Base Support Structure (WBS-17) F. Dahlgren NCSX Coil.
1 Field Period Assembly Office of Science Project Review Princeton Plasma Physics Laboratory Princeton, NJ November 2, 2005 T. Brown Princeton Plasma Physics.
Twisted Racetrack Analysis Update
NCSX M. Cole, P. Fogarty, K. Freudenberg, T. Hargrove, G. Jones, G. Lovett, B. Nelson, D. Williamson April 27, 2005 Modular Coil Type-C Final Design Review.
PDS4 Mission Needs Assessment Reta Beebe Dan Crichton.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem.
Testing Methods for Composites
1 Modular Coil Winding Keystoning Issues NCSX Technical Meeting May 29, 2003 What is the current baseline winding? What is the problem? What are the variables.
NCSX P. Fogarty, K. Freudenberg, T. Hargrove, G. Lovett, B. Nelson, P. Goranson, D. Williamson October 15, 2004 Twisted Racetrack Coil Final Design Review.
June 10, 2004Modular Coil Winding & Cooling WorkshopJ.H. Chrzanowski 1 Modular Coil Cooling Issues With Baseline & Status of Cooling R&D James H. Chrzanowski.
Strykowsky 1Project Review November 2, 2005 NCSX Project Review November 2, 2005 Cost and Schedule Ron Strykowsky.
1 Stellarator Core Metrology issues NCSX WBS-1 Meeting April 2, 2003 What are we measuring? When? How do we take the measurements? How do we correlate.
1 NCSX Composite Coil Testing Resin Impregnated Bare Conductor Longitudinal Compressive Tests.
NCSX R&D Activity Update Jim Chrzanowski June 11, 2003.
12/2/04Module 2C1 The NCSX Engineering Web – An Overview Part III Design Data, Fabrication, Assembly, and Installation Plans.
NSTX TF Flag Joint Status of Design, Analysis, Test Activities & Design Review Preparations C Neumeyer NSTX Team Meeting 7/24/3.
NCSX 21 March 2003 Reiersen - 1 PDR Preparations Wayne Reiersen NCSX Engineering Meeting 21 March 2003.
Twisted Racetrack Revisited Model Changes: Side A has 10 turns Clamps have been modified to as built geometry. Property Changes (linear results.
NCSX Strykowsky 1Cost and Schedule Rebaseline April 25, 2005 NCSX Project Re-baseline Review April 25, 2005 Cost and Schedule Ron Strykowsky.
NCSX Composite Coil Testing Tests Performed During the Week of 15 March 2004.
November 7, 2011 Objective: Students will understand how to read a credit report and begin to understand how to analyze a credit report to make a credit.
1 WBS 1 Preparation for FDRs NCSX WBS 1 Engineering Meeting March 17, 2003 What establishes the plan? What are near term deliverables? How will we status.
TF Fabrication Progress is being made on TF bundle fabrication activities but the schedule remains tight. All 24 outer conductors have been machined but.
QXF Coil Fabrication & Tooling Reaction / Impregnation
Stellarator Program Update: Status of NCSX & QPS
Presentation transcript:

J.H. ChrzanowskiMod Coil R&D Update1 Modular Coil R&D Update April 2, 2003 James H. Chrzanowski

J.H. ChrzanowskiMod Coil R&D Update2 Modular Coil R&D Activities- Epoxy Analysis work Keystone Trials Demo Coil Schedule

J.H. ChrzanowskiMod Coil R&D Update3 Modular Coil R&D Update- Epoxy Studies A contract will be placed with Composite Technology Inc. to perform tests to determine the mechanical & thermal properties of the epoxy/insulation system using CTD101k –[NCSX-SOW ] The NCSX project will receive a credit of approximately $56.0 k worth of testing in conjunction with a SBIR that CTD has with DOE The cost to the project will be between $10-20 k

J.H. ChrzanowskiMod Coil R&D Update4 Modular Coil R&D Update- Epoxy Studies Tests will include: Tensile, compressive and flexural on single conductor samples Shear and flexural on 4-conductor bundle VPI Shrinkage evaluation Thermal expansion

J.H. ChrzanowskiMod Coil R&D Update5 Modular Coil R&D Update- Epoxy Studies Test samples will be fabricated at PPPL –Impregnation of compression samples was performed this morning Compression samples will be sent to CTD next week CTD will begin on the VPI shrinkage and compression tests immediately Tooling design & fabrication [test fixtures] will also start immediately

J.H. ChrzanowskiMod Coil R&D Update6 Keystone Trials- A Peer review was held yesterday to discuss the type of measurements to be made on the Keystone winding form. Keystone winding will begin sometime next week.

J.H. ChrzanowskiMod Coil R&D Update7 Keystone Trials- A combination of global and local measurement systems will be used to obtain conductor position measurements Global measurements with “FARO arm. Local measurements with specially designed instruments Position data from Pro-E model is also available

J.H. ChrzanowskiMod Coil R&D Update8 Keystone Trials- Various versions of the local measuring tooling. This tooling is quickly and inexpensively fabricated. We can and will customize versions for the various geometries that we encounter. A simple version of this tooling is envisioned for use as the “go, no-go” gauge for winding the actual coils in the future. With dial indicator for direct reading With dial indicator and roller wheel for +/- reading With a spring loaded rod. Used like a tire tread depth gauge.

J.H. ChrzanowskiMod Coil R&D Update9 Demonstration Coil- J.P. Pattern has completed the casting and machining of the demo coil winding form. QA has issued release papers today. Delivery is expected Friday or Monday. Some additional machining for the leads will be performed at PPPL. Detail coil winding drawings still need to be completed prior to starting any winding operations. No designers are available at PPPL.

J.H. ChrzanowskiMod Coil R&D Update10 Demonstration Coil- The winding and VPI will completed in May. Testing in early June

J.H. ChrzanowskiMod Coil R&D Update11 Schedule Since the epoxy test samples will be made in-house, the decision has been made to delay the VPI of the highly shaped (twisted) tee until the demo coil has been fabricated Keystone tests- Complete by April 30 th. Test sample fabrication-thru mid May [overtime will be required] Demo coil fabrication complete May 30 th.