Taikan SUEHARA, IN2P3-KEK collaboration meeting on ATF2, Annecy, 2007/10/15 Shintake Monitor: Installation and Commissioning Schedule Taikan SUEHARA, The.

Slides:



Advertisements
Similar presentations
Liverpool LHCb Planning. April (2001) –Clean room (production facility) handover and qualification (April 19) (delayed to May 10) –Thermal model Results.
Advertisements

ATF2 Interaction Point Beam Size Monitor (Shintake Monitor) Status T. Yamanaka, M. Oroku, Y. Yamaguchi, S. Komamiya ( Univ. of Tokyo ), T. Suehara, Y.
1/8 T. Kume, Y. Honda, and T. Tauchi High Energy Accelerator Research Organization (KEK) T. Suehara, H. Yoda, M. Oroku, T. Yamanaka and Y. Kamiya The univ.
Summary of the discussion for the commissioning session 2 nd ATF2 Project Meeting KEK, Tsukuba, Japan 6/ 1/ 2006 T.Okugi (KEK)
Detector Systems Update MICO March 17, MICE Detector Systems  CKOV u Mississippi RAL  TOF0/1 u Hamamatsu PMT assemblies show an increasing.
Wed 15 Jul 2009 ATF2 weekly meeting Oxford MONALISA 1 MONALISA at ATF2 First installation report 15 July 09.
Taikan SUEHARA, ILC-Asia wg4 KEK, 2005/7/27 Laser interferometric beam size monitor (Shintake-monitor)
BDS GDE context LC-ABD2 : WP4 - Beam Line Design 12 th April 2007, LC-ABD Plenary, RHUL Deepa Angal-Kalinin ASTeC, The Cockcroft Institute.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
-brief report of October runs and some inputs for the Nov/Dec planning – Nobuhiro Terunuma, KEK, ATF ATF session on LCWS13, Tokyo Univ., Nov. 13, 2013.
ATF2 Progress Report For CLIC Workshop Kiyoshi KUBO.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
Plan for the summer Nobuhiro Terunuma, KEK ATF day: ATF Collaboration Meeting European Linear Collider Workshop ECFA LC2013, May 28,
High Resolution Cavity BPM for ILC final focal system (IP-BPM) ILC2007/LCWS 2007 BDS, 2007/6/1 The University of Tokyo, KEK, Tohoku Gakuin University,
Discussion on Milestone and schedule Toshiyuki Okugi ATF2 commissioning meeting 1 / 7 / 2009.
What’s already existing?What’s already existing? Laser system & impacts on Optics TransportLaser system & impacts on Optics Transport –Laser power –Focusing.
Status of QBPM Electronics and Magnet Movers as of June 3 rd 2008 D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
IPBSM status and plan ATF project meeting M.Oroku.
ATF2 ILC Final Focus Test Beam Line at KEK-ATF References : ATF2 Proposal, KEK Report ATF2 Proposal Vol.2, KEK Report ホームページ:
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
IPBSM - Stability of the laser system - Nobuhiro Terunuma Feb. 12 th 2014, KEK, 17 th ATF2 project meeting.
Taikan SUEHARA, 3 rd ATF2 project KEK, 2006/12/18 Status of Shintake-monitor Optics (focused on phase stabilization) Taikan SUEHARA The University.
IP-BSM Improvement Work N. Terunuma 2012/6/26 ATF2 Project Meeting.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
G.Barber KEK Test Beam Update, Berkeley 9 Feb KEK Test Beam – Tracker Progress Contents:- Station Space Frame Light Guide Map Station Connectors.
ATF1/2 laser-wires Stewart T. Boogert on behalf of UK Extraction line laserwire collaboration A. Aryshev, G. Blair, S. Boogert, A. Bosco, L. Corner, L.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
Commissioning Status of Shintake Monitor (IP-BSM) T. Yamanaka, M. Oroku, Y. Yamaguchi, Y. Kamiya, S. Komamiya (Univ. of Tokyo), T. Okugi, N. Terunuma,
Taikan Suehara, 2008/03/05 Shintake monitor in ATF2: status, performance and prospects Taikan Suehara (The Univ. of Tokyo) M.
1/10 Tatsuya KUME Mechanical Engineering Center, High Energy Accelerator Research Organization (KEK) ATF2-IN2P3-KEK kick-off meeting (Oct. 10, 2006) Phase.
Status Report for KEK-PS E391a KEK IPNS G.Y.Lim 14 April 2003.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
Greeting for 10 th ATF2 project and TB/SGC joint meeting 1.
Production and Installation Policy of IP-BPM ATF2 Project Meeting, 2006/12/18 Y. Honda, Y. Inoue, T. Hino, T. Nakamura.
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
TGC-electronics commissioning before beam collision Y. Sugaya Osaka-U アトラス総会2004 12/23 河口湖.
T. Suehara, H. Yoda, T. Sanuki, Univ. of Tokyo, T. Kume, Y. Honda, T. Tauchi, High Energy Accelerator Research Organization (KEK) ATF2-IN2P3-KEK kick-off.
Global Design Effort Introduction and goals of the meeting Andrei Seryi, Toshiaki Tauchi Fifth ATF2 Project Meeting December 19-21, 2007.
IP instrumentation configuration for Autumn 2010 ATF2 runs Toshiyuki OKUGI, KEK 2010 / 7/ 1 10 th ATF2 project meeting.
1/13 Tatsuya KUME Mechanical Engineering Center, High Energy Accelerator Research Organization (KEK) ATF2-IN2P3-KEK kick-off meeting (Oct. 9, 2006) Mount.
Progress of Shintake Monitor Work KEK site meeting August 26, 2009 T. Yamanaka.
Status Report for E391a (Continuation of the previous PAC on April) G.Y.Lim IPNS, KEK Group Meeting at the JINR 26 th – 29 th July 2003 Dzhelepov Laboratory.
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake.
ATF2 beam operation status Toshiyuki OKUGI, KEK The 9 th TB&SGC meeting KEK, 3-gokan Seminar Hall 2009/ 12/ 16.
IPBSM Operation 11th ATF2 Project Meeting Jan. 14, 2011 SLAC National Accelerator Laboratory Menlo Park, California Y. Yamaguchi, M.Oroku, Jacqueline Yan.
Taikan SUEHARA, ATF2 meeting, KEK, 2006/11/22 Status of fringe stabilization of Shintake-monitor Taikan SUEHARA The University of Tokyo.
1 COBRA Magnet Status W.Ootani MEG Experiment Review Meeting, Jul W.Ootani MEG Experiment Review Meeting, Jul
Vibrations studies for the nominal optics and the ultra-low beta optics Benoît BOLZON 1 B. Bolzon, A. Jeremie (LAPP) P. Bambade, Y. Renier (LAL) A. Seryi.
Compton Experiment at ATF DR 2009 Summary and Plan ATF2 Project Meeting 15-Dec-2009 T. Omori (KEK) for collaborators.
Taikan SUEHARA et al., LCWS2007 & DESY, 2007/06/01 R&D Status of ATF2 IP Beam Size Monitor (Shintake Monitor) Taikan SUEHARA, H.Yoda, M.Oroku,
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
IP diagnostics Toshiyuki Okugi 2008 / 6 /19 ATF2 Software mini-workshop LAL, Orsay.
Progress of Shintake Monitor (ATF2 IP-BSM) KEK site meeting 2008/10/31 Takashi Yamanaka.
1 Kazuhiro Yamamoto Institute for Cosmic Ray Research The university of Tokyo LCGT internal review (Cryogenic payload) 30 January 2012.
Design for a New Optical Table of the Shintake Monitor Takashi Yamanaka The University of Tokyo ATF2 weekly meeting 2007/9/26.
Taikan SUEHARA, Joint Meeting of PRPPC in Honolulu, Hawaii, 2006/10/30 Laser Fringe Stabilization of 35nm IP Beam Size Monitor (Shintake monitor) for ATF2/ILC.
Progress of Shintake Monitor (ATF2 IP-BSM) ATF2 weekly meeting 2008/9/3 Takashi Yamanaka The University of Tokyo.
Compton Gamma-ray Generation Experiment by Using an Optical Cavity in ATF POSIPOL 2007 Workshop at LAL Hirotaka Shimizu Hiroshima University.
Hardwares for commissioning 2 nd ATF2 Project Meeting KEK, Tsukuba, Japan 5/ 31/ 2006 T.Okugi (KEK)
Gamma Detector of the Shintake monitor 2007/12/19 Masahiro Oroku, Takashi Yamanaka H.Yoda, T.Suehara Y.Kamiya S.Komamiya(Tokyo Univ) Y.Honda, T.Tauchi,
Alignment and stability session
ATF2 Status N.Terunuma, KEK
Summary FD Support System
10/month is the present production rate 2 FTE + sporadic contributions
CLIC-ILC BDS & MDI work.
ATF ICB meeting, LCWS08, UIC, Chicago, 11/18/2008
IP configuration session
OLYMPUS Collaboration Meeting Luminosity Monitor Calorimeter
Presentation transcript:

Taikan SUEHARA, IN2P3-KEK collaboration meeting on ATF2, Annecy, 2007/10/15 Shintake Monitor: Installation and Commissioning Schedule Taikan SUEHARA, The University of Tokyo

Taikan SUEHARA, IN2P3-KEK collaboration meeting on ATF2, Annecy, 2007/10/15Topics 1.Overall Schedule 2.Detailed Schedule –New Optical Table –Fringe Stabilization –Laser System –Gamma Detector 3.Beam Commissioning 4.Issue 5.Summary

Taikan SUEHARA, IN2P3-KEK collaboration meeting on ATF2, Annecy, 2007/10/15 Overall Schedule Installation on ATF2 beam line: May 2008 First beam size measurement: end of nm measurement: ?? (depends on beam)

Taikan SUEHARA, IN2P3-KEK collaboration meeting on ATF2, Annecy, 2007/10/15 Schedule of New Optical Table Basic design: Finished Detailed design (screw position etc.): by Oct Basic tests of new components: by Oct –Small crossing angle at IP (2 deg.) (ongoing) –Large crossing angle at fringe monitor –Crossing angle switch (finished) –Off-axis focusing and collimation Construction of new table: by Feb to 4 month from design fixed. KEK: Feb Alignment and assembly test: Mar. to May 2008 Installation on ATF2 beam line: May to Jun. 2008

Taikan SUEHARA, IN2P3-KEK collaboration meeting on ATF2, Annecy, 2007/10/15 Schedule of Fringe Stabilization Concept (magnification by lens): well confirmed Stability for low power cw. laser: good (finished) Stability for pulsed laser: not good (ongoing) –Detector sensitivity check –Laser quality check Stability for high power laser: not done yet Stability goal (0.2 radian = 10 nm or less) for high power laser should be achieved by end of 2007

Taikan SUEHARA, IN2P3-KEK collaboration meeting on ATF2, Annecy, 2007/10/15 Schedule of Laser System 310 mJ 532 nm laser pulse available Laser property is being checked, by end 2007 –Spatial profile is bad (M 2 ~ 5), Need tuning –Fringe contrast is good enough Transport to KEK in Feb –Laser hut should be available by Feb –Laser operation should be started by end Feb. –Laser tuning by manufacturer Transport line construction by Jun. 2008

Taikan SUEHARA, IN2P3-KEK collaboration meeting on ATF2, Annecy, 2007/10/15 Schedule of Gamma Detector Basic design: finished. Detailed design: almost finished. PMT check: ongoing Cosmic ray test: by end of Oct Beam test at ATF extraction line: Nov. to Dec Modification (if needed) Installation: early 2008 Beam commissioning: Oct (if ATF2 beam available)

Taikan SUEHARA, IN2P3-KEK collaboration meeting on ATF2, Annecy, 2007/10/15 Beam Commissioning 1~2 months for system commissioning –Laser beam alignment –Background measurement –Software commissioning Small crossing angle operation for tuning –Available by end of 2008 (if beam will arrive at IP soon after beam on) Full operation for 35 nm –Schedule depends on beam

Taikan SUEHARA, IN2P3-KEK collaboration meeting on ATF2, Annecy, 2007/10/15Issue Final optics tuning and test in ATF2 beam line –June 2008 ~ –To ensure laser safety, people except us should be kept out from IP area –Interfere with installation of final doublet??

Taikan SUEHARA, IN2P3-KEK collaboration meeting on ATF2, Annecy, 2007/10/15Summary Installation: –Optical table: Feb (outside shield) May to Jun (beam line) –Laser: Feb (laser hut) –Gamma detector: early 2008 Commissioning –First beam size measurement by end of 2008 (depends on beam condition)

Taikan SUEHARA, IN2P3-KEK collaboration meeting on ATF2, Annecy, 2007/10/15 Thank you.

Taikan SUEHARA, IN2P3-KEK collaboration meeting on ATF2, Annecy, 2007/10/15Manpower 4 students by March 2008 T. Suehara (D3), H. Yoda (M2), M. Oroku (M1), T. Yamanaka (M1) 2 students will remain after April 2008 Yoda and me will leave 6 advisory staffs Y. Kamiya, S. Komamiya (Univ. of Tokyo) T. Tauchi, T. Kume, Y. Honda (KEK) T. Sanuki (Tohoku Univ.)