STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG 13-14 November 2007 Pasadena, California.

Slides:



Advertisements
Similar presentations
During spacecraft-level environmental testing, after all instruments were integrated, the government assembled a data clerk team to support test data collection.
Advertisements

Title: ICON L0 from MOC to SOC automation Author: MOC/SOC Resides: SOC Description: This is a script that copies the ICON L0 files from the MOC to the.
MISSION OPERATIONS DIRECTORATE CARGO INTEGRATION AND OPERATIONS BRANCH Brion J. Au Johnson Space Center/DO55.
Solar-B FPP 1 Ted Tarbell, TRACE Operations 3 February 2003 MODA Mtg, ISAS The TRACE Model for Operations Ted Tarbell
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG #22 (via telecon)
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG # March 2010 Dublin, Ireland.
1 STEREO Today Status report presented by Janet Luhmann and Peter Schroeder for the ACE/STEREO/WIND/SOHO Workshop 2010 June 8-10, Kennebunkport (Material.
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center Phase E Kickoff Meeting February 23, 2007.
STEREO Space Weather Beacon: December 2003 D.A. Biesecker NOAA/SEC.
IMPACT Report SSMO Receiving Review– January 23, 2007.
SECCHI – Sun-Earth Connections Coronal and Heliospheric Investigation SECCHI Synoptic and Special Observing Programs Simon Plunkett SECCHI Operations Lead.
Online Analysis for STEREO's IMPACT Investigation: Lessons Learned P. Schroeder, J.G. Luhmann, W. Marchant and V. Toy (University of California – Berkeley),
Page 1HMI Team Meeting – January 26, 2005 HMI Mission Operations Rock Bush HMI Stanford Program Manager Stanford University
STEREO Science Center SWG – Dec 2004 William Thompson NASA Goddard SFC Code Greenbelt, MD
STEREO Science Center SWG – May 2005 William Thompson NASA Goddard SFC Code Greenbelt, MD
PLANS FOR THE INTERNATIONAL HELIOPHYSICAL YEAR (IHY) Sept 2005 An international program of scientific research Joseph Davila, Barbara Thompson, Nat Gopalswamy.
STEREO Science Center William Thompson NASA Goddard SFC Code Greenbelt, MD
InSight Archive Status Ed Guinness and Susie Slavney PDS Geosciences Node PDS Management Council Berkeley, California November 18-19, 2014.
NASA/ESA Interoperability Efforts CEOS Subgroup - CINTEX Alexandria, Sept 12, 2002 Ananth Rao Yonsook Enloe SGT, Inc.
AERONET Web Data Access and Relational Database David Giles Science Systems and Applications, Inc. NASA Goddard Space Flight Center.
NASA’s Goddard Space Flight Center LRO Operations Concept Richard Saylor Jr. HTSI/Code 444 August 16-17, 2005.
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG #23 29 March 2012 (via telecon)
STEREO Space Weather Group update Dave Webb ISR, Boston College and Air Force Research Laboratory STEREO SWG October 2009 Meredith, NH.
Near-Real-Time HIRDLS Processing for START08 Vince Dean HIRDLS Science Team Meeting January 30, 2008 Boulder, CO.
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG 3-5 February 2009 Pasadena, California.
STEREO - Solar Terrestrial Relations Observatory Mission STEREO STEREO Science Team Meeting May 2, 2005 Presented by Edward Reynolds APL STEREO Project.
Geosciences Node Ed Guinness MC Face-to-Face Meeting Washington, DC March 27-28, 2012.
Instrument Performance Spefication 13 July 2001 SECCHI Consortium Meeting Cosner’s House, Abington Dan Moses.
Spacecraft and Ground Segments Status March 21, 2014 Dan Ossing STEREO Mission Operations Manager (240)
PDS Geosciences Node Page 1 Archiving Mars Mission Data Sets with the Planetary Data System Report to MEPAG Edward A. Guinness Dept. of Earth and Planetary.
MODIS OCEAN QA Browse Imagery (MQABI Browse Tool) NASA Goddard Space Flight Center Sept 4, 2003
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG April 2008 Meudon, France.
Solar Shield project - lessons learned and advances made (ccmc.gsfc.nasa.gov/Solar_Shield) Pulkkinen, A., M. Hesse, S. Habib, F. Policelli, B. Damsky,
RECENT ENHANCEMENTS TO THE CDDIS IGS Network Systems Workshop November 2-5, 1998 Annapolis, MD Carey E. Noll Manager, CDDIS NASA GSFC Greenbelt, MD.
Observatoire de Paris University of Minnesota University of California - Berkeley Goddard Space Flight Center STEREO SWG, Fall Hills, Meredith, NH STEREO/WAVES.
Swift HUG April Swift data archive Lorella Angelini HEASARC.
Michael L. Kaiser STEREO Project Scientist NASA/Goddard Space Flight Center STEREO June 11, 2008 STEREO at 1.4 years.
IMPACT SWG Status Report – December 11, Early IMPACT Timeline Status Day 3,410-28, 10-29IDPU/MAG/SWEA and STE turned on Day 711-1Booms deployed.
SECCHI Status Russell A. Howard & The SECCHI Team 3 Feb 2009 STEREO SWG - Pasadena.
IMPACT Data Plans May 2006 Peter Schroeder UC-Berkeley
06-1L ASTRO-E2 ASTRO-E2 User Group - 14 February, 2005 Astro-E2 Archive Lorella Angelini/HEASARC.
William Thompson L-3 Communications NASA Goddard Space Flight Center STERE The STEREO Science Center.
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG March 27-28, 2007.
Michael L. Kaiser STEREO Project Scientist NASA/Goddard Space Flight Center STEREO May 2, 2008 STEREO at 1.25 years.
The Virtual Heliospheric Observatory and Distributed Data Processing T.W. Narock 1,2, A. Szabo 2, A. Davis 3 1. L3 Communications,
STEREO/WAVES Interplanetary Radio Burst Tracker Jean-Louis Bougeret, PI Observatoire de Paris - Meudon Science Working Group Meeting Cal Tech - Pasadena.
SECCHI Status Russell A. Howard & The SECCHI Team March 2010 STEREO SWG – Trinity College, Dublin.
SSC Support for Sim #3 Archived MOC Data Products, and distributed via web. –Level-0 telemetry files organized by year and month –SPICE orbit and attitude.
SSC Data Access Plans All data will be available through web –Also setting up anonymous ftp site –SECCHI images will be password protected during embargo.
1 SUZAKU HUG 12-13April, 2006 Suzaku archive Lorella Angelini/HEASARC.
GLAST Science Support CenterAugust 10, 2004 Users’ Committee Meeting The Project Data Management Plan David Band – GSSC.
1 Center for Astrophysics and Space Sciences, University of California, San Diego 9500 Gilman Drive #0424, La Jolla, CA , U.S.A
STEREO Science Working Group Fall AGU December 11, 2006 San Francisco Meeting #15 (I think) Agenda 19:00-19:30Project and SSC status 19:30-20:00SECCHI.
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG October 2009 Meredith, NH.
STEREO and the Virtual Heliospheric Observatory Tom Narock 1,2 Adam Szabo 1 Jan Merka 2 (1) NASA/Goddard Space Flight Center (2) L3 Communications, GSI.
(1)IHY 2nd Whole Sun Month (the “Whole Heliosphere Interval”) (2) Ulysses Fast Latitude Scan III (the Winter 2008 Quadrature) Steve Suess NASA MSFC, National.
IMPACT Conjunction and Sidelobe Operations Janet Luhmann, Dave Curtis, Peter Schroeder, Dick Mewaldt and the IMPACT Team July 2, 2014.
Space Weather William Thompson NASA Goddard Space Flight Center For Dave Webb Boston College & Air Force Research Laboratory STEREO SWG 3-5 February 2009.
1 NASA’s STEREO Mission J.B. Gurman STEREO Project Scientist W.T. Thompson STEREO Chief Observer Solar Physics Laboratory, Helophysics Division NASA Goddard.
STEREO Science Center SWG – November 2005 William Thompson NASA Goddard SFC Code Greenbelt, MD
SSC Preflight Status Tested during Sim #3: –Telemetry ingest –Beacon processing –Science planning –Archiving of MOC data products, including level-0 telemetry.
ACES User Interface Workshop #1 Prototype Inspection 22. November 2011.
Heliophysics MO&DA Program - November 13, Page 1 Notes from the Heliophysics MO&DA Program STEREO SWG Meeting Chuck Holmes “Director, Heliophysics.
PLASTIC Post Launch Data Flow Lynn Kistler & Lorna Ellis May 2006.
Working with MAVEN Data
Jan 2016 Solar Lunar Data.
Launch and On-orbit Checkout
STEREO Michael L. Kaiser STEREO Project Scientist
The STEREO Space Weather Broadcast
IMPACT Instrument Status
Presentation transcript:

STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG November 2007 Pasadena, California

Upcoming Events Momentum dumps occuring about once every 6 weeks for Ahead and 9 weeks for Behind. Next expected dumps are: –Ahead: Dec 19 –Behind: Nov 28 High gain antenna calibrations on both spacecraft January 9. –Spacecraft are rolled by ±2° to find best signal. –Occurs about once every 3 months. SECCHI campaign, January 7-20 –Extra downlink pass to bring down SECCHI data

Joint Observing Programs The SSC website currently lists twelve STEREO-related JOPs. –Four STEREO-related IHY Coordinated Investigation Programs (CIPs) are also listed, which were run earlier as a campaign. Currently concluding the SUMER campaign, which includes seven STEREO- related JOPs.

Possible science collaborations Ulysses quadrature, Dec 2007-May 2008 SECCHI campaign, Jan 7-20 Messenger – Mercury flybys –Jan 14, 2008 –Oct 6, 2008 –Sep 29, 2009 Whole Heliosphere Interval, Mar 20 – Apr 16 SUMER campaign, Apr 21 – May 16

Archive Status Archive currently contains just under 11 TB of data –Processed instrument data7166 GB IMPACT36 PLASTIC185 SECCHI6937 SWAVES9 –Level-0 telemetry2629 Spacecraft410 IMPACT101 PLASTIC106 SECCHI1943 SWAVES69 –Ancillary data (ephemerides, etc.)156 –Beacon55 –Preflight384 –Website349 New hardware has been installed to store data at both primary and backup sites

Data Availability Data available through web from SSC website –Instrument data, telemetry, ancillary, beacon –Archiving all data available from instrument sites. SECCHI, SWAVES within a few days Only IMPACT, PLASTIC level-1 IMPACT LET,SEPT,SWEA through Aug 31, MAG through Sep 30, no HET,SIT,STE Also serves as Virtual Solar Observatory data provider for processed instrument data –Working on customized search pages Links to instrument-specific websites Links to supporting auxiliary data –GONG, L’Observatoire de Paris radio, SOHO, ACE, WIND Documentation still needs to be provided –Alex Young working on Instrument Resource pages PLASTIC resources page available Need input from other instrument teams

Instrument Resources Pages A useful concept is to have resource pages for each instrument. Similar format for each instrument. Provides information about file formats, calibration, analysis software, and contact information. We ask that each team provide and maintain such a page. See the SOHO pages at the URL below for examples.

Level 1 software being integrated Level 1 software being validated Level 1 software not yet delivered Calibration issues need to be worked out

Would probably continue if Sun would wake up. Combined with WIND/WAVES Provided as software In beta-test

STEREO-A STEREO-B Samples of Merged 10-min PLASTIC Plasma and IMPACT MAG data and derived quantities from the beta test Level-2 Key Parameter Server Website PLASTIC -V -N -vth (coming) -Tp -Entropy w/MAG: -Beta -Total Pressure MAG -Br -Bt -Bn -Btot -Cone Ang. -Clock Ang.

Provided as software

Beacon Status Receive beacon telemetry from England and Japan on a regular basis. –CNES station in France expected to start testing in November –Wallops tracking is top priority—paperwork is main delay SECCHI images and IMPACT/PLASTIC data put on web within 5 minutes. –Working with SECCHI team to include HI-2 for daily browse pages, but not beacon page –Many improvements made to IMPACT/PLASTIC plots –SWAVES now producing beacon data—software has been delivered –Presentation given at NOAA SEL on PLASTIC beacon data products –New PLASTIC calibration table for beacon density calculations uploaded 10/23/07

Sample beacon plot of MAG and PLASTIC data

Sample beacon plot of SEP data

Science Publication Database (imminent)

Future Work Beacon processing: –Incorporate SWAVES –Real-time ASCII files. (Need software from IMPACT team.) Daily summary images/plots: –Add SECCHI HI-2 –Reach into instrument browse pages Customized search pages for VSO database –Search on individual instruments within suites