Evaluation Measures for Municipal Storm Water Management Programs Daniel Rourke Fresno Metropolitan Flood Control District October 15, 2003 Counting Raindrops.

Slides:



Advertisements
Similar presentations
Session 6 Outline Overview of program requirements. Defining your program. Program components. Overview of BMPs. Maintenance inspection. Employee education.
Advertisements

Total Suspended Solids (TSS) Reduction Presenter: Keith Noble, Saginaw Bay District Office.
What are TMDLs? and What Might They Mean to MS4 Permittees?
Stormwater Management Program Training Presented By FAU Environmental Health & Safety Phone: Fax: Web:
When It Rains, It Drains An Overview of Our Community’s New Storm Water Management Program.
Central Massachusetts Regional Stormwater Coalition Part 5 Standard Operating Procedures September 26, 2013 Community Innovation Challenge Grant 2013.
MS4 Stormwater Permit Program and Great Bay. Brief Overview – EPA’s Stormwater Management Program Clean Water Act – NPDES Stormwater amendments.
Legislative Changes Affecting Water Quality at a Local Level October 2011 Robert Kollinger, P.E. Water Resources Manager Polk County Parks and Natural.
Utah Pollutant Discharge Elimination System (UPDES) Utah Sewer Management Program (USMP)
When It Rains, It Drains An Overview of Pennsylvania’s New Storm Water Management Program.
Upper Providence Township Stormwater Management MS4 Program.
When It Rains, It Drains An Overview of Our Community’s New Storm Water Management Program.
Environmental Harm Urban stormwater frequently contains litter, oil, chemicals, toxic metals, bacteria, and excess nutrients, like nitrogen and phosphorous.
Austin Peay State University Stormwater Program Kristen Spicer, Ph.D.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
When It Rains, It Drains An Overview of the Hempfield Township’s New Storm Water Management Program.
Upper Merion Township’s New Storm Water Management Program
When It Rains, It Drains An Overview: The Lower Providence Township Storm Water Management Program.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
Regulatory Refresher The Municipal Regional Permit Kristin Kerr, P.E., QSD EOA, Inc. Municipal Maintenance Training Workshop May 23, 2013.
{Your District Name Here} District Small MS4/Municipal Storm Water Update {Date Here}
Env 247 Overview of Stormwater Management March 1, 2011.
Measurable Goals and Assessment Tools Setting, Achieving, and Evaluating Measurable Goals and Assessment Tools.
When It Rains, It Drains An overview of Stormwater Management.
Preventing Nonpoint Source Pollution
Storm Water Pollution Prevention Training
Regulatory Refresher The Municipal Regional Permit Kristin Kerr, EOA, Inc. Illicit Discharge Stormwater Inspector Training Workshop April 24, 2013.
Municipal Regional Permit Provision C.6 Dan Cloak, P.E. Principal Dan Cloak Environmental Consulting.
Municipal St rm Water Program. Storm Water Programs Industrial –bus maintenance yards Construction –addition of a gym Municipal.
Creating a Storm Water Pollution Prevention Plan For Construction Activities.
AGENDA  What is Storm Water & Why we need to protect it  Role of the EQO  Storm Water Pollution Prevention Plan  Potential Sources of Storm.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
Integrity ♦ Innovation ♦ Accountability ♦ Commitment to Excellence ♦ Teamwork City of Southlake Storm Water Management Plan Christi Upton
Stormwater Rain and melting snow Collected by storm drains and flows into streams, rivers, lakes.
Municipal Maintenance Activities Presented on April 24, 2006.
Source Control Planning for Municipal Wastewater System Permit Compliance Environmental Trade Fair & Conference Austin, TX. May 6, 2015 David James Santiago.
Presented by Gary Lippner & Glenn Moeller 3 - Year Storm Water Monitoring Action Plan.
Storm Water: Federal Enforcement and Compliance for Phase II MS4.
MDOT Storm Water Management Plan Module 2: Best Management Practices
Implementing Post-Construction Stormwater Controls Greg Davis, EPA Region 8.
Barb Loida, Carolyn Adamson, Dave Bauer MECA 2014.
Latest Developments - Effectiveness Assessment and Research Priorities Geoff Brosseau California Stormwater Quality Association (CASQA) December 4, 2007.
What is my job? To eliminate and reduce pollutant discharges going to storm drains.
Regulatory Refresher What Construction Site Inspectors Need to Know about the MRP Kristin Kerr, P.E., QSD EOA, Inc. Construction Inspection Workshop April.
Illicit Discharge Detection and Elimination 6/4/20161 Illicit Discharge Detection and Elimination.
Phase II National Storm Water Regulations What’s in it for you?
 Storm Water Pollution Prevention Plan (SWPPP)  All dischargers over 1-acre must develop a SWPPP  6 major portions of every SWPPP Site Evaluation and.
An Overview of our Community’s Stormwater Management Program
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
HAMPTON ROADS REGIONAL WATER RESOURCES MANAGEMENT PROGRAM Presentation John M. Carlock, AICP Deputy Executive Director, Physical Planning Hampton Roads.
Watersheds and Wetlands CHAPTER 1. Lesson 1.5 Factors That Affect Wetlands and Watersheds Human Activities Watershed Quality Health of U.S. Watersheds.
Program Overview Town of Wrightsville Beach Public Works Department Stormwater Services.
Prepared By: Amaliyar Kamleshkumar ( ) Rathod Nikunj ( ) Parmar mukesh ( ) Patel Raj ( ) Ode Kiran ( )
What is Stormwater? Direct result of rainfall Recharges groundwater by infiltration Produces “runoff” (excess rainfall after infiltration) May be concentrated.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Why the Need for Increased Stormwater Funding? Citizens expect a higher level of protection from flooding Increased development.
2016 MS4 SWMP COMPLIANCE DNER TFWs Education and Outreach Program
Hampden Township Stormwater Management Program
STORMWATER MANAGEMENT
Town of Melbourne Beach
Water Pollution.
Total Maximum Daily Load Program
Sacramento County Stormwater Quality Program
Stormwater Management Program
MS4 OVERVIEW 2015.
10.3 Ground water supply.
Hamilton Township, Mercer County, NJ Hydrologic Evaluation and Water Resources Recommendations For Planning and Implementation Rutgers Cooperative Extension.
Best Management Practices to Social Indicators
Best Management Practices to Social Indicators
Sacramento County Stormwater Quality Program
Presentation transcript:

Evaluation Measures for Municipal Storm Water Management Programs Daniel Rourke Fresno Metropolitan Flood Control District October 15, 2003 Counting Raindrops

What is my job? To eliminate and reduce pollutant discharges going to storm drains.

Fresno Metropolitan Flood Control District When it rains or when an area is hosed down, chemicals and eroded sediment enter the storm drain inlet …… How Does Pollution Occur?

…..the chemicals enter the storm drain inlet, travel through a pipe…

…and enter one of the local ponding basins designed to recharge the groundwater aquifer…

…or the pollutants travel to detention basins which discharge into local waterways such as the San Joaquin River.

Pollutants entering basins and local waterways can impact the quality of groundwater – your drinking water

Polluted water can also impact livestock and aquatic life…

Pollution can impact recreation…

Water Resources Goal To reduce the amount of sediment that ends up in our local basins, where it can clog the systems and prevent infiltration to groundwater.

…and excess sediments in storm drains can lead to flooding issues and increased fees for maintenance

Duel use pounding basin and neighborhood park

Dual use retention/recharge basin

On average, 27,000 acre feet is transferred from FID into flood control basins and infiltrated back into the ground water each year 8.8 billion gallons 74,000 Fresno residents for one year

Storm Water flows to Storm Water flows to: 5 % 25% 70% 17,000 acre feet per year = 5.5 billion gallons = 46,000 Fresno Residents

Water Main Installation and Flushing

Stages to Environmental Improvement Design and implement program Increase awareness of pollution issues Change behavior Reduce inputs of targeted pollutants Improve water quality of discharges Improve environmental condition

Process Framework Identify the issue Identify and assess sources Determine available control strategies Evaluate and prioritize control strategies Establish a goal Implement the program Evaluate effectiveness Modify program

Program Implementation Effectiveness Measurements Project planning –Audience characterization –Baseline information –Existing program review Implementation –Tracking progress –Achieving milestones –Meeting expectations Completion –Goals achieved –Most successful strategies –Future needs/ next steps

Impact Effectiveness Measurement Tools Measuring increased awareness –Phone surveys –Mailed surveys –Intercept surveys –Water Quality Monitoring Measuring behavior change –Sales Tracking –Participation Tracking –Surveys –Site visits Measuring pollutant load reductions (monitoring)

Implementation Measurements Versus Impact Measurements ImplementationImpact Basin Sampling 1)No. of storms monitored 2)Correct protocols followed 3)Percent of storm captured 4)Accidental drownings 1)Pollutant Removal 2)Influent Concentration 3)Discharge Concentration 4)Water Quality Construction Inspections 1)No. of facilities inspected 2)Training Materials Distributed 3)Preparation time 1)BMPs implemented 2)BMP implementation rate 3)Water Quality

Evaluation Measures Matrix Columns -Task Name -Desired result -Targeted Pollutant -Targeted Audience -Program Implementation Measure -Impact Measurement -Resource Required

Task NameDesired Result Targeted Pollutants Targeted Audience Evaluation Measures for Program Implementation Evaluation Measures for Program Impacts Resources Required 1) Corporation yard assessments (implement supervisory oversight)  Increased awareness of potential site pollutants and sources  Increase in BMP implementation  Decrease in corporation yard pollutants  Knowledge of runoff water quality PAHs, oil and grease, solvents, metals, sediment, herbicides, nutrients, debris, misc raw/bulk materials (e.g., asphalt grindings, sand, gravel), detergents/ surfactants Corporation yard managers and staff  No. facilities evaluated  No. corrective measures identified at each facility  No. follow-up site visits to evaluate corrective measure implementation  No. inspection checklists and BMP guidance distributed to facility managers (% of total)  No. SWPPPs reviewed by District during supervisory inspections  Amount of other assistance provided to facility manager (evaluating NEC criteria, or need for WDRs)  No. changes made to supervisory inspection process for future inspections Measure increase/decrease in: 1. No. BMPs implemented 2. No. corrective actions identified/ implemented 3. Consider inspection score to evaluate 1. and No. water quality objective exceedances (as indicated by sampling data) 5. No. SWPPPs developed and implemented 6. No inspections conducted by corporation yard staff 7. No. storm events sampled 1. Medium 2. Medium 3. Medium 4. High 5. Low 6. Med 7. Low

Implementation of Evaluation Measures Developed access database for Construction and industrial inspection and complaint investigations Included evaluation measures in project design and project deliverables Anticipated regulatory temperature – evaluated know areas of future concern.

Visual Observations Training Succeeded

Visual Observation Continued Get out in the field !

Complaint evaluation Sediment complaint increased- Increased training of field workers Decreased paint & oil complaints– many years of multi agency outreach

Effectiveness Measures are Good Because They: 1)Improve efficiency of limited resources 2)Improves negotiating power during permit renewal 4)Keeps you out of trouble 3)Gets rid of dead wood

HOW TO CONTACT ME AT THE FRESNO METROPOLITAN FLOOD CONTROL DISTRICT Daniel Rourke