INFSO-RI-508833 Enabling Grids for E-sciencE EGEE SA1 – Operations Summary Cristina Vistoli INFN CNAF Italy.

Slides:



Advertisements
Similar presentations
08/11/908 WP2 e-NMR Grid deployment and operations Technical Review in Brussels, 8 th of December 2008 Marco Verlato.
Advertisements

EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks From ROCs to NGIs The pole1 and pole 2 people.
INFSO-RI Enabling Grids for E-sciencE Status of LCG-2 porting Stephen Childs, Brian Coghlan and Eamonn Kenny Grid-Ireland/EGEE October.
EGI: SA1 Operations John Gordon EGEE09 Barcelona September 2009.
EMI INFSO-RI SA2 - Quality Assurance Alberto Aimar (CERN) SA2 Leader EMI First EC Review 22 June 2011, Brussels.
INFSO-RI Enabling Grids for E-sciencE SA1: Cookbook (DSA1.7) Ian Bird CERN 18 January 2006.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Steven Newhouse EGEE’s plans for transition.
INFSO-RI Enabling Grids for E-sciencE The gLite Software Development Process Alberto Di Meglio EGEE – JRA1 CERN.
Responsibilities of ROC and CIC in EGEE infrastructure A.Kryukov, SINP MSU, CIC Manager Yu.Lazin, IHEP, ROC Manager
Enabling Grids for E-sciencE System Analysis Working Group and Experiment Dashboard Julia Andreeva CERN Grid Operations Workshop – June, Stockholm.
EGEE is a project funded by the European Union under contract IST User support in EGEE Alistair Mills Torsten Antoni EGEE-3 Conference 20 April.
INFSO-RI Enabling Grids for E-sciencE User Support in EGEE Torsten Antoni, FZK
INFSO-RI Enabling Grids for E-sciencE SA1 and gLite: Test, Certification and Pre-production Nick Thackray SA1, CERN.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Next steps with EGEE EGEE training community.
INFSO-RI Enabling Grids for E-sciencE Integration and Testing, SA3 Markus Schulz CERN IT JRA1 All-Hands Meeting 22 nd - 24 nd March.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE-EGI Grid Operations Transition Maite.
INFSO-RI Enabling Grids for E-sciencE Enabling Grids for E-sciencE Pre-GDB Storage Classes summary of discussions Flavia Donno Pre-GDB.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks SA1: Grid Operations Maite Barroso (CERN)
INFSO-RI Enabling Grids for E-sciencE EGEE SA1 in EGEE-II – Overview Ian Bird IT Department CERN, Switzerland EGEE.
1 Andrea Sciabà CERN Critical Services and Monitoring - CMS Andrea Sciabà WLCG Service Reliability Workshop 26 – 30 November, 2007.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks The EGEE User Support Infrastructure Torsten.
EGEE-III INFSO-RI Enabling Grids for E-sciencE Antonio Retico CERN, Geneva 19 Jan 2009 PPS in EGEEIII: Some Points.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks The GILDA t-Infrastructure Roberto Barbera.
8 th CIC on Duty meeting Krakow /2006 Enabling Grids for E-sciencE Feedback from SEE first COD shift Emanoil Atanassov Todor Gurov.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE Site Architecture Resource Center Deployment Considerations MIMOS EGEE Tutorial.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGI Operations Tiziana Ferrari EGEE User.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks The future of the gLite release process Oliver.
INFSO-RI Enabling Grids for E-sciencE ARDA Experiment Dashboard Ricardo Rocha (ARDA – CERN) on behalf of the Dashboard Team.
SAM Sensors & Tests Judit Novak CERN IT/GD SAM Review I. 21. May 2007, CERN.
EMI INFSO-RI SA1 Session Report Francesco Giacomini (INFN) EMI Kick-off Meeting CERN, May 2010.
INFSO-RI Enabling Grids for E-sciencE An overview of EGEE operations & support procedures Jules Wolfrat SARA.
Certification and test activity ROC/CIC Deployment Team EGEE-SA1 Conference, CNAF – Bologna 05 Oct
INFSO-RI Enabling Grids for E-sciencE The gLite Software Development Process Alberto Di Meglio EGEE – JRA1 CERN.
INFSO-RI Enabling Grids for E-sciencE /10/20054th EGEE Conference - Pisa1 gLite Configuration and Deployment Models JRA1 Integration.
PIC port d’informació científica EGEE – EGI Transition for WLCG in Spain M. Delfino, G. Merino, PIC Spanish Tier-1 WLCG CB 13-Nov-2009.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks SA3 partner collaboration tasks & process.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Deliverable DSA1.4 Jules Wolfrat ARM-9 –
EGEE-III INFSO-RI Enabling Grids for E-sciencE SA3 All Hands Meeting 'Cluster of Competence' Experience SA3 INFN Cyprus May 7th-8th.
EGEE is a project funded by the European Union under contract IST Roles & Responsibilities Ian Bird SA1 Manager Cork Meeting, April 2004.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks The EGEE User Support Infrastructure Alistair.
INFSO-RI SA2 ETICS2 first Review Valerio Venturi INFN Bruxelles, 3 April 2009 Infrastructure Support.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Operations Automation Team Kickoff Meeting.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Ian Bird All Activity Meeting, Sofia
INFSO-RI Enabling Grids for E-sciencE gLite Certification and Deployment Process Markus Schulz, SA1, CERN EGEE 1 st EU Review 9-11/02/2005.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Patch Preparation SA3 All Hands Meeting.
Enabling Grids for E-sciencE INFSO-RI Enabling Grids for E-sciencE Gavin McCance GDB – 6 June 2007 FTS 2.0 deployment and testing.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks MSA3.4.1 “The process document” Oliver Keeble.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks ROCs Top 5 Middleware Issues Daniele Cesini,
INFSO-RI Enabling Grids for E-sciencE gLite Test and Certification Effort Nick Thackray CERN.
Operations model Maite Barroso, CERN On behalf of EGEE operations WLCG Service Workshop 11/02/2006.
INFN GRID Production Infrastructure Status and operation organization Cristina Vistoli Cnaf GDB Bologna, 11/10/2005.
INFSO-RI Enabling Grids for E-sciencE Operations Parallel Session Summary Markus Schulz CERN IT/GD Joint OSG and EGEE Operations.
Components Selection Validation Integration Deployment What it could mean inside EGI
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE Operations: Evolution of the Role of.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks What all NGIs need to do: Helpdesk / User.
INFSO-RI Enabling Grids for E-sciencE File Transfer Software and Service SC3 Gavin McCance – JRA1 Data Management Cluster Service.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE Operational Procedures (Contacts, procedures,
II EGEE conference Den Haag November, ROC-CIC status in Italy
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Grid is a Bazaar of Resource Providers and.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks The Dashboard for Operations Cyril L’Orphelin.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks CYFRONET site report Marcin Radecki CYFRONET.
Scuola Grid - Martina Franca, Thursday 08 November Il Sistema di Supporto INFNGrid & GGUS ( Global Grid User.
The EPIKH Project (Exchange Programme to advance e-Infrastructure Know-How) gLite Grid Introduction Salma Saber Electronic.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks IT ROC: Vision for EGEE III Tiziana Ferrari.
Regional Operations Centres Core infrastructure Centres
Ian Bird GDB Meeting CERN 9 September 2003
Brief overview on GridICE and Ticketing System
Short update on the latest gLite status
Leigh Grundhoefer Indiana University
Presentation transcript:

INFSO-RI Enabling Grids for E-sciencE EGEE SA1 – Operations Summary Cristina Vistoli INFN CNAF Italy EGEE SA1 Regional Operation Centers coordinator 4 th EGEE Conference Pisa, 28 th October 2005

Enabling Grids for E-sciencE INFSO-RI th EGEE Conference, Pisa; October 24 th, Outline Metrics and job statistics Operations for users, VO managers, admins, users User support Deployment and release issue Experience from production sites OSCT, Intrusion detection, emergency planning Porting, access to other platform Storm EGEE-II: Sa1 Sa3 TCG Pre-production service Deployment tools

Enabling Grids for E-sciencE INFSO-RI th EGEE Conference, Pisa; October 24 th, Metrics Categories Size + deployment metrics Operations Usage User support Services Defined list of metrics in all the categories Defined how to collect data Defined where to gather information Some examples:

Enabling Grids for E-sciencE INFSO-RI th EGEE Conference, Pisa; October 24 th, Size + deployment Number of sites in production Number of job slots Total available kSpecInt: computing power available Storage (disk) + MSS Number of EGAP-approved VOs and apps Number of overall VOs: active Number of users active: current / future Total % of used resources M/w Security upgrade uptake

Enabling Grids for E-sciencE INFSO-RI th EGEE Conference, Pisa; October 24 th, Operations Site response to COD operational tickets –(open/pending/closed within timeframe) –Average time of response Site tests failed – or % time spent in the particular test- related state % availability of SE, CE – outside of downtime window ROC: Number of days down / site summed up?

Enabling Grids for E-sciencE INFSO-RI th EGEE Conference, Pisa; October 24 th, Usage Jobs per VO (submitted, completed, failed) (through RBs) Data transfer per VO CPU (wall clock time) and storage per VO % of sites blacklisted/whitelisted per timeframe Number of CE/SE available to a VO

Enabling Grids for E-sciencE INFSO-RI th EGEE Conference, Pisa; October 24 th, User support Time to response to user tickets (+within different groups) Number of supporters Number of tickets escalated at various points + time related to it % of tickets assigned to wrong group + time related to it Above measures for ROCs: responsibility of ROCs

Enabling Grids for E-sciencE INFSO-RI th EGEE Conference, Pisa; October 24 th, Services RB: % passing a job submission test BDII: Query time measurement MyProxy: % passing a test (register a proxy, access the proxy, delete the proxy) SRM-SE: % passing file movement and deletion tests Catalogue: % passing register, query, delete VOMS: % passing VOMS test RGMA: TBD

Enabling Grids for E-sciencE INFSO-RI th EGEE Conference, Pisa; October 24 th, Metric discussion We are going to publish these values Is it acceptable for all sites? Provide guidelines to publish correct specint and correlated benchmark Goal: –provide understandable metrics with comparable values –Most of the metric are numbers with an associated scale –Other metrics are judgement of quality –Measure the quality of the infrastructure Applications need to measure the quality of their application –Basic numbers can be retrieved via with application SFT Start publish some of these metrics soon as prototype, –end of the year –Service metrics LCG requirement by December –Other metric sets to follow same timeline

Enabling Grids for E-sciencE INFSO-RI th EGEE Conference, Pisa; October 24 th, Operation Information in the CIC portal Operation Information for end users, VO managers and Site administrators using the CIC portal –"VO users" section – –"VO managers" section – –"Site administrators" (RC) section – Request for Roc team to access CIC on Duty tools and dash boards

Enabling Grids for E-sciencE INFSO-RI th EGEE Conference, Pisa; October 24 th, Central GGUS Application VO Support Units Middleware Support Units Deployment Support Units Operations Support ROC Support Units Network Support - Solves - Classifies - Monitors TPM User Support Workflow

Enabling Grids for E-sciencE INFSO-RI th EGEE Conference, Pisa; October 24 th, Local Helpdesk Central Application (GGUS) Automatic Ticket Creation VO Support Units Middleware Support Units Deployment Support Units Operations Support ROC Support Units Network Support - Solves - Classifies - Monitors TPM Local Helpdesk Local Problem? RC Support Workflow

Enabling Grids for E-sciencE INFSO-RI th EGEE Conference, Pisa; October 24 th, Some statistics: users per VO

Enabling Grids for E-sciencE INFSO-RI th EGEE Conference, Pisa; October 24 th, Performance statistics Tickets tickets first 15 days in October September October

Enabling Grids for E-sciencE INFSO-RI th EGEE Conference, Pisa; October 24 th, User support Conclusions GGUShas improved The functionality and usability of the GGUS system has improved in the last months, thanks to the help of the ROCs (more tickets submitted, more customers and general appreciation of the service). GGUS/ESC GGUS/ESC coordinates the effort and operations: key body. interfaces with the ROCs The existent interfaces with the ROCs are quite practical and make the system function as one. Most ROCs have established functional interfaces with GGUS, the others are working on it. do not knowreal figure The ticket traffic is increasing. We still do not know what a real figure would be for the number of ticket to be expected. The system can be dimensioned appropriately with more TPMs and support units. metrics established A lot of metrics established to measure the performance of the system (performance of a supporter/support unit, tickets solved/week/VOs, # of tickets filed in Wiki pages, etc.). The measures refer only to the central system. Each ROC processes and solves also local requests. Measures for each ROC are also available. plan to offer resilience to system and network failures GGUS is working on a plan to offer resilience to system and network failures. We need more specialized supporters We need more specialized supporters in order to help the supporters at CERN who now are the main source of knowledge and help.

Enabling Grids for E-sciencE INFSO-RI th EGEE Conference, Pisa; October 24 th, Deployment and Release Issues Straw Man I Upgrade and introduce services as soon as ready (SC and gLite) –Whenever upgrades are ready and tested –T1s experience can be used as additional deployment test –Handle these as upgrades to the last major release –Make client libs available in user space –Version tracking via the information system With sufficient material accumulated –Cut a new release –Starting point for sites to join –Reference point for external project Security upgrades –Upgrades + message to the site security contacts Work continuously on tests and documentation

Enabling Grids for E-sciencE INFSO-RI th EGEE Conference, Pisa; October 24 th, Deployment and Release Issues Straw Man II New services should be “integrable” with current CIC on duty –Tick list produced at the operations workshop

Enabling Grids for E-sciencE INFSO-RI th EGEE Conference, Pisa; October 24 th, Deployment and Release Issues Straw Man III Integrated releases on the pre-production service –Now:  production: lcg + gLite components  pre-production: gLite only –Better:  production: lcg + gLite components  pre-production: lcg + current gLite + new gLite components New name for integrated production stack needed The winner is: –gLite X.Y

Enabling Grids for E-sciencE INFSO-RI th EGEE Conference, Pisa; October 24 th, Deployment and Release Issues: conclusion Rapid upgrade versus stability and site predictability: how to cope with these two requirements? –continuous release upgrade cannot be operated –to operate a deployed middleware we need a reference version Version number per service published in the information system Release: becomes a mix of services versions –well defined rpm list for services and clear procedure for upgrade the single service Is the backward compatibility guaranteed? –test is possible to some extend completely regression test takes too time. –not ideal but service challenge is very demanding in new versions gLite name is confusing for a complete release –gLite release stops and start releasing separate components then the name is ok.... –inside gLite services there are already diff. versions number –just continue the current numbering, add in the relevant LCG software Integrating pre-production service with LCG and Production services Make PPS more similar to real next production version –pure gLite version not more distributed to PPS –PPS is the last step of the certification for the application –additional partners in certification process for EGEE-2

Enabling Grids for E-sciencE INFSO-RI th EGEE Conference, Pisa; October 24 th, Issues from Site/Grid Managers Restrictions on OS –Need at least few Linux distributions –List of required packages –Improved documentation of migrations Few supported batch systems More Transparent Release management Insert middleware into the fabric management tools VO boxes Middleware Releases. –“continuous update” model will introduce problems –how will “versions” be tagged –support impact be if sites are running different software versions –YAIM or gLite installation tool?

Enabling Grids for E-sciencE INFSO-RI th EGEE Conference, Pisa; October 24 th, Issues by Site/Grid Managers Defining and measuring availability User/operational support homogeneous quality among federations Technical forum on storage issues More flexible SFT –Different subset of tests for regional SFT –Sites in sc3 have specific services need special SFT

Enabling Grids for E-sciencE INFSO-RI th EGEE Conference, Pisa; October 24 th, OSCT, Intrusion detection Security Service Challenge –SSC_1 targeting ROC sites completed in June 2005 –Transition to GGUS problem tracking tool t.b.d. –Procedure for SSC reponse should be included into the COD operation –Next SSC scheduled for Nov Security Monitoring –First test integrated into SFT framework  Monitoring last-download time for CRLs Incident Response –Proposed: Incident Response HandbookIncident Response Handbook Grid-wide Intrusion Detection System

Enabling Grids for E-sciencE INFSO-RI th EGEE Conference, Pisa; October 24 th, JSPG September 2005 Emergency procedures are required to cover the following cases: –Incident response plans cannot be followed: critical parts of the infrastructure are unavailable (e.g. mailing lists) –Incident response plans are inappropriate: E.g. need to rapidly inform large parts of the community, beyond the security contacts, and incident communication channels are compromised Examples –Major power cut at Site A lasted several days –Cable cut network access to Site B –Major worm disrupted network access at Site C –Security incident blocks user access to accounts at Site D –Wide area exploit of the (homogeneous) security fabric When are emergency procedures required?

Enabling Grids for E-sciencE INFSO-RI th EGEE Conference, Pisa; October 24 th, Emergency plan Define a plan for disaster –communication is important –out of band communication mechanisms are needed –coordinate with the Grid participating site how to handle disaster and define sites recovery plan US sites are forced to have an emergency plan Grid changes the classical emergency disaster plan: –the grid introduce dependability at global level

Enabling Grids for E-sciencE INFSO-RI th EGEE Conference, Pisa; October 24 th, Need for porting x86 clusters where SL3 cannot be installed Support for other architectures –Grid-enable compute centres with existing resources –User applications optimised for a particular architecture –MacOS/X, AIX, IRIX, Solaris, IA64, … Definite need to port (at least) the WN software Question: is there a requirement to port service nodes?

Enabling Grids for E-sciencE INFSO-RI th EGEE Conference, Pisa; October 24 th, Overview of porting projects CERN Openlab & SPACI –Itanium port available and tested for LCG (all nodes) CERN/UVienna/Apple –MacOS X port available (focus on UI: WMS, …) Grid-Ireland –WN ports available for CentOS 4.1, Suse 9.3, RedHat 7.3/9 –Work in progress on MacOS X, Solaris, EMT64, FC4, AIX, IRIX GSI (Germany) –Debian port (UI and WN?) IRB (Croatia) –Debian: tar fixes (UI), chroot (CE+WN), converting RPMs to DEBs (ongoing); FreeBSD: tar (UI) HPC2N Umea (Sweden) –Porting gLite to Ubuntu (Debian) EGRID (Italy) –LiveCD with all service nodes, UI-only relocatable installation

Enabling Grids for E-sciencE INFSO-RI th EGEE Conference, Pisa; October 24 th, Issues on porting The future is to provide common infrastructure for all platform with no need to check out the code Installation of different platforms must not be an issue The code has to be 64 bit compatible Interoperability is also very important Significant interest to run Grid service in different Linux distribution non only SLC

Enabling Grids for E-sciencE INFSO-RI th EGEE Conference, Pisa; October 24 th, StoRM objectives A disk based SRM server StoRM’s implementation of SRM meant to meet three important requirements : – Space Reservation using file system with native support for space reservation –direct POSIX I/O call. Performant parallel file system distributed over all WNs of farm –Security on data VOMS proxies. Comments: –Is interoperability tested with other SRM implementation? –Is Raid5 supported?

Enabling Grids for E-sciencE INFSO-RI th EGEE Conference, Pisa; October 24 th, EGEE-2 Sa1 Sa3 Tcg

Enabling Grids for E-sciencE INFSO-RI th EGEE Conference, Pisa; October 24 th, SA1 in EGEE-II Consolidate and build on what has been done in EGEE Integration, certification, release preparation moved into SA3 Maintain hierarchical structure, but simplify ROC/CIC  ROCs Strengthen (operational and user) support for many more applications and users Security – take operational tasks from JRA3; set up real response teams

Enabling Grids for E-sciencE INFSO-RI th EGEE Conference, Pisa; October 24 th, Organisation

Enabling Grids for E-sciencE INFSO-RI th EGEE Conference, Pisa; October 24 th, SA3 Tasks T1: Integration and packaging T2: Testing and certification T3: Support, analysis, debugging, problem resolution T4: Interoperability T5: Capture Requirements Partners: CERN + –PSNC,TCD,IMPERIAL, INFN,UKBH –UCY, GRNET, CSIC, PIC, CESGA, FZJ –Partners active in testbeds, tests, and specific interoperation tasks

Enabling Grids for E-sciencE INFSO-RI th EGEE Conference, Pisa; October 24 th, SA3 inside EGEE II

Enabling Grids for E-sciencE INFSO-RI th EGEE Conference, Pisa; October 24 th, TCG Overview The EGEE-II proposal defines a Technical Coordination Group (TCG): The TCG brings together the technical activities within the project in order to ensure the oversight and coordination of the technical direction of the project, and to ensure that the technical work progresses according to plan. Basically coordinating the work of SA1, SA2, SA3, NA4, and JRA1 –Membership from all these activities but still remain a “small” team –Additional experts will join based on the topic of discussion –Working groups will be spawn off to solve specific problems Focus on practical short term solutions –Long term projects will be sourced out to middleware providers The group must have executive power –Not just a discussion forum! –Decisions taken by the group must be honoured by the affected activities

Enabling Grids for E-sciencE INFSO-RI th EGEE Conference, Pisa; October 24 th, Report from discussion The TCG should have control on the architecture/design team and have a solid requirement management process The most important members of the TCG should be users, sites and developers representatives with a distillation process to avoid TCG become too big User documentation is very important and has to be part of the certification process is to verify documentation The TCG picture is too complicated simplest approach taking into account all the actors Define strict acceptance criteria to avoid testing things that doesn't work. JRA1 is not in the stakeholders, because the list contains requirement providers Avoid confusion if debugging and fixing is in sa3 or in jra1, SA3 just minor fixes SA3 and SA1 are middleware providers only for small components, glue between services Make sure the contributions coming from SA3 follow the same criteria as the rest The deployment policies? is not a short term discussion and will be done in the TCG, certain decisions will also be taken by deployment managers depending on site needs

Enabling Grids for E-sciencE INFSO-RI th EGEE Conference, Pisa; October 24 th, Proposal for PPS Evolution PPS can hardly be defined the Pre-Production compared with the ‘production services –PPS includes only gLite services –PPS does not share Monitoring and Operation Procedures with the Production –PPS is far away to be a preview of what really will be in the next LCG release How PPS should change –Improve Operation Procedures –Same Support model as in production –To be included in Monitoring Infrastructure –Include all production services really in use: Catalogs/LFC, BDII etc How Production should change –Adding deployable gLite Services to existing production services

Enabling Grids for E-sciencE INFSO-RI th EGEE Conference, Pisa; October 24 th, gLite 1.4 Certification Status WMS –push/pull: OK –Integration with the BDII: still waiting for the fix for the empty cache (it is not supposed to be released with 1.4.1, which may mean that likely the WMS will not be ready to be included in the next LCG release as proposed) –Bulk submission: not tested, test left to PPS users –Upgrade: OK –Status: Moved to PPS IO, Fireman (Mysql), R-GMA : –Upgrade: OK –Status: Deployable FTS : –Configuration instructions still not sufficient –It took several days to get it working –We could not get it working with dpm –Still does not work with catalogs –It works with url-copy –Upgrade: not tested –Status: Not deployable out-of-the-box. Expert support needed for installation, limited functionality, keep version 1.3

Enabling Grids for E-sciencE INFSO-RI th EGEE Conference, Pisa; October 24 th, Deployment tools Currentl situation: YAIM –All changes concentrated in 1 file, easy to customize and extend it, appreciated by many site managers –Balance between simplicity and flexibility Glite configuration approach is different –For each glite module, there is a corresponding packages list + XML data + 1 configuration script –1 XML document can describe the configuration of 1 site There is an overlap between the two tools –Discussion how to find a good compromise for site manager, integrators, developers –Everybody agree that the configuration for the sitemanager must be kept simple whenever possible –A. Di Meglio, O. Keeble, A. Forti will work for a temporary smooth transition

Enabling Grids for E-sciencE INFSO-RI th EGEE Conference, Pisa; October 24 th, Thank you!