PM Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.

Slides:



Advertisements
Similar presentations
DIS 2008, London Transverse Spin Physics at PHENIX Douglas Fields (University of New Mexico) For the PHENIX Collaboration 4/9/20081 Douglas Fields for.
Advertisements

Run8 – Coming sooner than we had thought Mike Leitch Run8 Coordinator November 7 th /7/20071MJL.
1 Run 9 PHENIX Goals and Performance John Haggerty Brookhaven National Laboratory June 4, 2009.
Michele Gallinaro, "QCD Results at CDF" - XXXVIII Rencontres de Moriond, March 22-29, QCD Results at CDF Inclusive Jet Cross Section Dijet Mass.
Silicon Tracking for Forward Electron Identification at CDF David Stuart, UC Santa Barbara Oct 30, 2002 David Stuart, UC Santa Barbara Oct 30, 2002.
RHIC/AGS User’s Meeting PHENIX Run-15 Goals and Status Douglas Fields University of New Mexico For the PHENIX Collaboration.
Performance of the PHENIX Muon Tracking System in Run-2 Ming X. Liu Los Alamos National Lab (for the PHENIX Collaboration) –Detector Commissioning –Detector.
Time Meeting 3/17/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
PHENIX Run12 Spin John Koster RBRC RSC Meeting 2012/05/11.
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
Time Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
PHENIX Status, 2/22/11 VTX commissioning on beam Local polarimeter in service 9.6% in blue, -16.6% Residual transverse component for longitudinal beam.
Status of W analysis in PHENIX Central Arm Kensuke Okada (RBRC) For the PHENIX collaboration RHIC Spin Collaboration meeting November 21, /21/20091K.Okada.
Time Meeting 2/3/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Performance of PHENIX High Momentum Muon Trigger 1.
Run 15 RHIC Machine/Experiments Meeting 30 Sep 2015 Run 15 Summary Slides 1.
Observation of W decay in 500GeV p+p collisions at RHIC Kensuke Okada for the PHENIX collaboration Lake Louise Winter Institute February 20, /20/20101.
November 18, 2008 John Haggerty 1 PHENIX In Run 9 John Haggerty Brookhaven National Laboratory.
Time Meeting 2/17/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Time Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Run 14 RHIC Machine/Experiments Meeting 1 July 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Run 14 RHIC Machine/Experiments Meeting 3 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Spin Physics with PHENIX (an overview, but mainly  G) Abhay Deshpande Stony Brook University RIKEN BNL Research Center July 28, 2011.
STAR Agreement on Spin Configuration Plan Bill Christie RHIC Coordination Meeting January 24, 2006 Plan: A.) If the FPD++ installation, debugging, and.
Takao Sakaguchi, BNL Run-11 PHENIX Run Coordinator PHENIX Run-11 Report Sakaguchi, RHIC retreat 1 RHIC retreat version.
FVTX Trigger Toru Nagashima, Yomei Fukushima (Rikkyo University) Shoichi Hasegwa (J-Parc) Itaru Nakagawa RIKEN and FVTX Group 1.
PHENIX Run-13 status Hubert van Hecke for the PHENIX collaboration 1Hubert van Hecke - 05 Feb 13.
Run15 pp Achievement and pAu status Itaru Nakagawa RIKEN/RBRC.
Time Meeting 3/17/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Introduction to High Momentum Trigger in PHENIX Muon Arms RIKEN/RBRC Itaru Nakagawa 中川格 1.
PHENIX Run8 Summary d+Au was fantastic! - x30 over Run3 baseline for future A+A new level of precision on intrinsic Cold Nuclear Matter physics now p+p.
Time Meeting 3/10/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Mar 2011 Agenda: Status – cryo/budget Experiment priorities.
1 RHIC Machine/Detector Planning Meeting 29 Jan 08 Agenda –Run 8 end game issues, if any Planning Meeting Web Site:
High Multiplicity Trigger Operation Status RIKEN/RBRC Itaru Nakagawa On behalf of Toru Nagashima, Aaron Key, SeYoung Han, Shoichi Hasegawa 1.
2007 Run Update for STAR Jeff Landgraf For the STAR collaboration.
FNAL All Experimenters Meeting January 7, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Progress Dec 17, 2001 – Jan 7, 2002  Reasonably.
PERFORMANCE OF THE PHENIX SOUTH MUON ARM Kenneth F. Read Oak Ridge National Lab & University of Tennessee for the PHENIX Collaboration Quark Matter 2002.
STAR pp Run Summary Carl Gagliardi March 11, 2008.
1/27/2016 R.Seidl: status of simulation1 W muon analysis in PHENIX Status of the background understanding, signal, smearing and asymmetries R.Seidl (RBRC)
1 PHENIX Status Ed O’Brien for John Haggerty Brookhaven National Laboratory June 23, 2009.
STAR Analysis Meeting, BNL – oct 2002 Alexandre A. P. Suaide Wayne State University Slide 1 EMC update Status of EMC analysis –Calibration –Transverse.
Measurement of the Double Longitudinal Spin Asymmetry in Inclusive Jet Production in Polarized p+p Collisions at 200 GeV Outline Introduction RHIC.
Bill Christie For the STAR Collaboration January 5, Outline Detector configuration for Run 16 Data set Goals Desired luminosity profile for Run.
TOFp Status Report Introduction: system overview Functional requirements Analysis status –track extrapolation & matching –start time –stop time –identified.
PHENIX results on collectivity tests in high-multiplicity p+p and p+Au collisions at √s NN =200 GeV RIKEN/RBRC Itaru Nakagawa Quark Matter 2015, Kobe,
Run 14 RHIC Machine/Experiments Meeting 6 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Oct. 12, 2007 Imran Younus k T Asymmetry in Longitudinally Polarized p +p Collisions at PHENIX.
All Experimenters MeetingDmitri Denisov Week of July 22 to July 29 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.1pb -1 u Live:
LAV efficiency studies with photons T. Spadaro* *Frascati National Laboratory of INFN.
Reduction of Background in Observation of W Decay Using the Forward Vertex (FVTX) detector at PHENIX Abraham Meles New Mexico State University APS April.
Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.
Time Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 7 Jun 2011 Agenda: √s = 200 GeV AuAu progress 27 GeV Run (or other)
Reduction of background in observation of W – decay using FVTX tracker Abraham Meles New Mexico State University DNP2012 – Newport Beach, CA. Oct 25, 2012.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 31 May 2011 Agenda: √s = 200 GeV AuAu progress Update on 250 GeV integrated Lumi.
Study of polarized sea quark distributions in polarized pp collisions at sqrt(s)=500GeV with PHENIX Oct. 10, 2008 Tsutomu Mibe (KEK) for the PHENIX collaboration.
PHENIX Plan for Run13 Kieran Boyle RSC 01/11/20131.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Jun 2011 Agenda: √s = 200 GeV AuAu progress ZDC Calibration for AnDY – the plan Request from AnDY √s = 27 GeV.
STAR Summary for 2012 pp running May 11, 2012 Bill Christie, BNL Outline Summary of 200 GeV pp run Summary of 510 GeV pp run STAR’s running efficiency.
PHENIX J/  Measurements at  s = 200A GeV Wei Xie UC. RiverSide For PHENIX Collaboration.
Muon Trigger Performance Run12 PP510GeV Sanghwa Park (SNU/RIKEN)
BUP Discussion Input John Koster, Sasha Bazilevsky, Itaru Nakagawa Spin PWG 2013/04/03 1.
Time Meeting 2/10/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
RUN16 Status Y. Akiba (RIKEN/RBRC) 2016/05/27 Radiation lab meeting.
Run16 Y. Akiba.
Heavy Ion Physics in RUN14-16
Y. Akiba (RIKEN/RBRC) Radiation Lab meeting 2016/06/30
Presentation transcript:

PM Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico

PM Meeting Ethane Saga Continues We were on our last 6-pack of ethane (a couple of days supply). 21 bottles arrived yesterday. Another 25 will arrive this week. AirGas will deliver the tube trailer with 3000lbs in about 10 days. Altogether, this will give us enough for the run plus another two weeks. We are in frequent contact with the vendor to keep track of the status of these orders. 03/30/2015Douglas Fields 2

PM Meeting MPCEX update 03/30/2015Douglas Fields 3 Both MPC-EX N,S running in PHENIX DAQ since 3/17 Final timing adjustments completed 3/26 Continuing work on: – SVX4 Cell ID errors (~7% of N/S, overlapping) Offline analysis, matching with MPC underway – Working on geometry, matching, energy scale, pizeroes… Possible issue with currents growing to exceed MPOD limit, esp. in back layers. Working on a solution.

PM Meeting PHENIX Efficiency 03/30/2015Douglas Fields 4

PM Meeting Goal Luminosity Progress RHIC projections ( gave Run- 12 achieved delivered luminosity as 9.3 pb −1 /week and 22 pb −1 /week max expected in Run-15 (after 5 weeks running). Converting to our recorded luminosity: 4.5 pb −1 /week and 10.1 pb −1 /week (for the |z| < 40cm program) and 1.6 pb −1 /week and 3.85 pb −1 /week (for the |z| < 10cm program) 03/30/2015Douglas Fields 5 Goal

PM Meeting FOM Progress RHIC projections ( gave Run- 12 achieved delivered luminosity as 9.3 pb −1 /week and 22 pb −1 /week max expected in Run-15 (after 5 weeks running). Converting to our recorded luminosity: 4.5 pb −1 /week and 10.1 pb −1 /week (for the |z| < 40cm program) and 1.6 pb −1 /week and 3.85 pb −1 /week (for the |z| < 10cm program) 03/30/2015Douglas Fields 6 Goal

PM Meeting Summary Taking physics data for HF in Muon and Central arms. MPC-EX now taking physics data (with some remaining issues being chased down). New High Multiplicity trigger now in physics mode. Could still reach both physics goals by nominal end of p+p run. 03/30/2015Douglas Fields 7

PM Meeting Backup 03/30/2015Douglas Fields 8

PM Meeting Recovery from Power Incidence PHENIX came away fairly well from the power glitch. – Our rack room air conditioner died (new motor is being installed today). – We have 4 IR air conditioning units. Two are dead, parts are being ordered/gathered to repair them (need no beam, since they are on berm). – Our rack room UPS system is dead (still dead, but being worked on). All subsystems are running in DAQ. 03/30/2015Douglas Fields 9

PM Meeting Meanwhile… J/Psis in Forward Arms 03/30/2015Douglas Fields 10 2D triggers NorthSouth 1D triggers 2D eff.

PM Meeting FVTX Multiplicity Trigger 03/30/2015Douglas Fields 11 Slide from Wei Lei, Rice University

PM Meeting FVTX Multiplicity Trigger 03/30/2015Douglas Fields 12 Trigger : #track > Threshold ~ 3/4 active wedges Online Coarse Track

PM Meeting Trigger performance 03/30/2015Douglas Fields 13 >6 tracks >7 tracks >12 tracks

PM Meeting Local Polarimeter Issues 03/30/2015Douglas Fields 14

PM Meeting Progress Towards Physics Goals (p+p) Two physics programs: – Forward direct gamma physics with the MPC-EX 200 GeV with transverse polarization for 9 weeks [Physics driven goal is 50 pb −1 recorded within |z| = 60%] – Heavy Flavor physics using the F/VTX 200 GeV with transverse polarization for 9 weeks [Physics driven goal is 21 pb −1 recorded within |z| = 60%] In our BUP, ( &materialId=0&confId=764) we state that we assume PHENIX uptime 70%, fraction of events within +/- 10 cm (25%) and +/- 40 cm (70%). &materialId=0&confId=764 03/30/2015Douglas Fields 15