CLIC Energy Stages D. Schulte1 D. Schulte for the CLIC team.

Slides:



Advertisements
Similar presentations
CLIC Energy Stages D. Schulte1 D. Schulte for the CLIC team.
Advertisements

CARE07, 29 Oct Alexej Grudiev, New CLIC parameters. The new CLIC parameters Alexej Grudiev.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Preliminary Studies of the Electric Power Distribution for CLIC
Photon Collider at CLIC Valery Telnov Budker INP, Novosibirsk LCWS 2001, Granada, Spain, September 25-30,2011.
CLIC Staged Design October 2012 D. Schulte for the CLIC collaboration.
The LHC: an Accelerated Overview Jonathan Walsh May 2, 2006.
Drive Beam and CTF 3 International Workshop on Linear Colliders 2010 October 22, 2010 Erik Adli, Department of Physics, University of Oslo and CERN Bernard.
Proposed machine parameters Andrei Seryi July 23, 2010.
Future Accelerators at the High Energy Frontier
Scaling of High-Energy e+e- Ring Colliders K. Yokoya Accelerator Seminar, KEK 2012/3/15 Accelerator Seminar Yokoya 1.
Beam Physics Work D.S List of Workpackages Area packages Main beam electron source (Steffen Doebert) Main beam positron source (Steffen.
Summary of WG1 K. Kubo, D. Schulte, P. Tenenbaum.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
CLIC cost estimate Hans-H. Braun, CLIC-GDE meeting, February 8, 2008  Cost model goals  Methodology  Cost distribution  Future improvements.
1 Tunnel implementations (laser straight) Central Injector complex.
Current CLIC Energy Stages D. Schulte1. Main Beam Generation Complex Drive Beam Generation Complex Layout at 3 TeV D. Schulte2.
NLC Status and Milestones D. L. Burke ISG9 KEK December 10-13, 2002.
Luminosity expectations for the first years of CLIC operation CTC MJ.
Status of the Rebaselining D. Schulte for the Rebaselining Team D. Schulte, CLIC Rebaselining, October 2013.
Recent news from CLIC C&S WG and CLIC-ILC WG on General Issues Ph. Lebrun CLIC Project Meeting 1 June 2011.
CLIC main activities and goals for 2018 Design and Implementation studies: CDR status: not optimized except at 3 TeV and not adjusted for Higgs discovery,
1 Physics Input for the CLIC Re-baselining D. Schulte for the CLIC collaboration.
Damping Ring Parameters and Interface to Sources S. Guiducci BTR, LNF 7 July 2011.
CLIC Energy Stages Meeting D. Schulte1 D. Schulte for the CLIC team.
CLIC Machine-Detector Interface Working Group (MDI) Emmanuel Tsesmelis CERN TS/LEA CLIC-ACE of 3 September 2008.
ILC D RAFT P ROJECT S CHEDULE K LYCLUSTER 500GeV K Foraz & M Gastal ILC Mechanical & Electrical Review and CFS Baseline Technical Review Many thanks to.
Beam Dynamics WG K. Kubo, N. Solyak, D. Schulte. Presentations –N. Solyak Coupler kick simulations update –N. Solyak CLIC BPM –A. Latina: Update on the.
How CLIC-Zero can become less expensive A.Grudiev, D. Schulte 16/06/09.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
PHG - AD&I DESY - May 29, 2009 ILC - Global Design Effort 1 Cost Estimating for the AD&I Studies X Differential Estimates What we need from you! Peter.
Low Emittance Generation and Preservation K. Yokoya, D. Schulte.
Introdcution to Workpackage/Activity Reflection D. Schulte.
N. Walker, K. Yokoya LCWS ’11 Granada September TeV Upgrade Scenario: Straw man parameters.
Questions from the CLIC accelerator team (D. Schulte, LCD “monthly” 25 Feb. 2013) -> a first attempt to answers 1 25 March 2013.
CLIC - CDR Status (Volume 2) Hermann Schmickler, ILCW2010.
For Layout of ILC , revised K.Kubo Based on following choices. Positron source: Prepare both conventional and undulator based. Place the.
X-Band Technology, requirement for structure tests and its application for SASE FEL D. Schulte for the CLIC collaboration Special thanks to A. Grudiev,
FCC-FHI 28/1/14 Requirements from Collider Draft parameters just available in EDMS:
2 February 8th - 10th, 2016 TWIICE 2 Workshop Instability studies in the CLIC Damping Rings including radiation damping A.Passarelli, H.Bartosik, O.Boine-Fankenheim,
Energy consumption and savings potential of CLIC Philippe Lebrun CERN, Geneva, Switzerland 55th ICFA Advanced Beam Dynamics Workshop on High Luminosity.
CLIC Re-baselining CSC, October Possible CLIC stages studied 2.
Optics with Large Momentum Acceptance for Higgs Factory Yunhai Cai SLAC National Accelerator Laboratory Future Circular Collider Kick-off Meeting, February.
HISTORY OF SNS DESIGN AND TECHNOLOGY CHOICES PROJECT X WORKSHOP NOVEMBER 12-13, 2007 R. KUSTOM.
Fast Ion Instability Study G. Rumolo and D. Schulte CLIC Workshop 2007, General introduction to the physics of the fast ion instability Fastion.
High-efficiency L-band klystron development for the CLIC Drive Beam High-efficiency L-band klystron development for the CLIC Drive Beam CLIC workshop,
Feasibility and R&D Needed For A TeV Class HEP e+e- Collider Based on AWA Technology Chunguang Jing for Accelerator R&D Group, HEP Division, ANL Aug
Positron Source for Linear Collider Wanming Liu 04/11/2013.
Note presentation: Performance limitations of circular colliders: head-on collisions M. Koratzinos TLEP ACC meeting no. 8, 25/8/2014.
WG1: Overall Design personal highlights report by Nick Walker First project meeting 2/12/2004 conveners: Kiyoshi Kubo (KEK) Tor Raubenheimer (SLAC)
Parameters and the Costs of CLIC H.H. Braun, CLIC Parameter Away Day,
ILC - Upgrades Nick Walker – 100th meeting
Staging in the TDR.
CLIC Rebaselining at 380 GeV and Staging Considerations
CLIC Klystron-based Design
SuperB Injection, RF stations, Vibration and Operations
CLIC: from 380 GeV up to 3 TeV Will also study klystron based machine for initial stage.
Other beam-induced background at the IP
Future Collider Projects at CERN
CLIC Civil Engineering Update
Measurements, ideas, curiosities
Top-Up Injection for PEP-II and Applications to a Higgs Factory
XFEL Project (accelerator) Overview and recent developments
Requests of Future HEP e+/e-Facilities
A Superconducting Proton/Electron Linac
ATF project meeting, Feb KEK, Junji Urakawa Contents :
Barry Barish Paris ICHEP 24-July-10
CDR2 – Injection System Injection system overview (Seeman) (2 pages)
Presentation transcript:

CLIC Energy Stages D. Schulte1 D. Schulte for the CLIC team

Current CLIC Energy Stages D. Schulte2 Currently have two CLIC parameter sets optimised and well studied 3TeV not optimised 500GeV main linac accelerating structure is not identical driven by more conservative emittance target at 500GeV Considered upgrade from 500GeV to 3TeV using same structure lengths, RF pulse lengths, drive beam components, … small glitch is slightly larger structure input power at 500GeV should be corrected in next iteration could re-use 500GeV structure at 3TeV

Current CLIC Energy Stages D. Schulte3

Main Beam Generation Complex Drive Beam Generation Complex Layout at 3 TeV D. Schulte4

Main Beam Generation Complex Drive beam Main beam Drive Beam Generation Complex Layout for 500 GeV Only one DB complex Shorter main linac Shorter drive beam pulse 2.5 km 797 klystrons 15 MW, 2x29µs=58µs D. Schulte5

Energy Stages Strategy D. Schulte6 CLIC has focused on demonstration of 3TeV, only indicative 500GeV Require input from physics will have to wait Need to have a real strategy solid physics case, cost and schedule for each stage optimise machine for different requirements at different energies experience will help to improve following stages Prepare an example staging low energy machine for Higgs, top, … medium energy for SUSY, triple Higgs, … high energy for more SUSY, …

Potential CLIC Staged Parameters D. Schulte7 First stage ML structures are re-used

Potential CLIC Staged Parameters D. Schulte8 First stage ML structures are not re-used

Concept First Stage D. Schulte9 Concept! Not to scale

Concept Second Stage D. Schulte10

Concept Third Stage D. Schulte11

Exp. Injectors CLIC 500GeV General Construction and installation schedule 500GeV Comm. 3.TeV Comm. Operation at 500 GeV Injectors modification & first sector reinstallation Tunnel excavation Tunnel construction Survey El. Gen. services Piping Cabling Machine transport Machine inst. Site installation Shaft construction Ph. Lebrun, K. Foraz, et al.

Beam Parameters at Other Energies Preliminary, Indicative Choice D. Schulte13 Based on design at energy E max we can easily derive indicative parameters for E<E max leave injection complex the same shorten the linac adjust BDS Obviously the beam parameters do not change before the BDS slight changes would yield slightly better performance correction with O(E -1/8 ) could be possible Use the CLIC 3TeV and 500GeV structure to design lower energy versions of CLIC will optimise later

Potential CLIC Luminosity Above 500GeV D. Schulte14 Blue line indicates luminosity that we can achieve with current BDS design

Potential CLIC Parameters Based on 3TeV D. Schulte15 B. Dalena, D.S.

Potential CLIC Parameters Based on 500GeV D. Schulte16

Reminder: 3TeV Parameter Optimisation Optimisation 1 – Luminosity per linac input power Optimisation 2 – 3TeV total project cost A.Grudiev, W. Wuensch, H. Braun, D.S. D. Schulte

Issues for Energy Stages D. Schulte18 Consolidate the current cost/power model for 3TeV e.g. use of permanent magnets reduces power (J. Clarke et al.) Need to review figure of merit luminosity needs so far optimised for maximum energy will need (generic) running plan cost, cost and power/energy consumption, average or maximum power? cost of initial stage, integrated cost of all stages? Need to develop a cost/power/energy consumption model for varying energy

Conclusion D. Schulte19 Have design for 3TeV, fully optimised 500GeV, partly optimised Can stage the two designs almost complete re-use of components possible Can derive preliminary designs at lower energies based on the above Can improve our design improved cost/power estimates improved input on requirements from physics adding intermediate stage to maximise physics at each stage to best balance performance vs. cost and power

Reserve D. Schulte20

D. Schulte21 Low Energy Operation

Sub-Stages: CLIC Higgs and Top Stage D. Schulte22 Could consist of two installation stages Build tunnel long enough for top But install only enough structures for Higgs and run Then add structures for top Or only run at the top threshold more tops but fewer Higgs impact of missing mass analysis or others for the Higgs?

Luminosity and Parameter Drivers Beam Quality (+bunch length) D. Schulte23 Can re-write normal luminosity formula Luminosity spectrum Beam current In the classical limit for beamstrahlung

Luminosity and Parameter Drivers Full optimisation done, but experience shows parameters are determined as shown D. Schulte24 Main linac structure and design Damping Ring BDS (RTML) Main linac BDS RTML Damping Ring Beam-beam

Parameter and Structure Choice Potential structures designs RF limitations Beam physics constraints Parameter set Cost model Design choice Physics requirements Structure chosen to work for beam physics Will tell the story as if we had a structure given D. Schulte25

Potential CLIC Staged Parameters D. Schulte26

Corresponding Background D. Schulte27 Background will go down significantly In particular coherent pairs n γ number of photons per beam particle N had number of hadronic events with W γγ>5GeV N coh Number of coherent pairs, next slide coherent pair particles N inc Number of incoherent pair particles