INOVA Fairfax Hospital South Patient Tower Falls Church, VA Senior Thesis 2012 Mike Morder Mechanical Option Advisor: Dr. William Bahnfleth.

Slides:



Advertisements
Similar presentations
Lindbergh Field International Airport New Terminal Bill Mahoney LSW Engineers.
Advertisements

DOUG BOSWELL MECHANICAL OPTION APRIL 16, 2008 Temple University Tyler School of Art.
Kevin Edstrom Mechanical Option 2011 Senior Thesis April 12 th, 2011 Georgetown University New Science Center Washington, DC.
Learning Outcomes Upon completion of this training one should be able to: Identify open loop and closed loop campus-type hydronic water system applications.
STEM Center Delaware County Community College – Media, PA Thesis Final Presentation Dan Saxton Mechanical Option.
West Virginia University Alumni Center Gregory Smithmyer | Mechanical Option | Penn State University | April 15, 2009 | Advisor: Dr. Srebric.
Jacksonville, FL The Pennsylvania State University Department of Architectural Engineering Zachary Polovchik Mechanical Option Advisor – Dustin Eplee Duval.
WESTINGHOUSE ELECTRIC NUCLEAR ENGINEERING HEADQUARTERS DANIEL AUGHENBAUGH - MECHANICAL OPTION Westinghouse Nuclear Engineering Headquarters Daniel Aughenbaugh.
Coppin State University Physical Education Complex Kaylee Damico – Mechanical Option April 12 th, 2011 Presentation Outline Project Team Project Overview.
Presentation Outline Introduction CHP Analysis Electrical Analysis Acoustical Analysis Thermal Storage Analysis System Optimization Analysis Conclusion.
Integration of Mechanical System Redesign Geothermal Heat Pump Redesign Wesley S. Lawson Architectural Engineering Mechanical Option Pennsylvania State.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Bowie State University Fine and Performing Arts Center Zachary Lippert Faculty Advisor: Dr. Stephen Treado.
Chilled Water Systems Total Cost of Ownership
The Edward St. John Student Center Zachary Haupt Faculty Advisor: Dr. William Bahnfleth 11 April 2011.
North Pocono High School
DEA Clandestine Laboratory Training Center Penn State University Architectural Engineering Mechanical Option David M. Potchak.
Technology and Engineering Development (TED) Building Thomas Jefferson National Accelerator Facility Newport News, VA David Blum | Mechanical Option Dustin.
Chilled water Meyrin consolidation Study 1 st Part Many thanks for their contribution to: Pasquale Alemanno, Fortunato Candito, Alexander Putzu.
William H. Gates Hall University of Washington School of Law Katie Jenkins The Pennsylvania State University Architectural Engineering Lighting/Electrical.
National Institutes of Health Building 37 Modernization Katie L. McGimpsey Mechanical Option The Pennsylvania State University Department of Architectural.
SENIOR THESIS PRESENTATION
Berks Classroom and Lab Building Reading, Pennsylvania Julia Broskey Mechanical Option AE 482 – Senior Thesis Faculty Advisor :Dr. William P. Bahnfleth.
Nate Mooney | Mechanical Option Advisor: William P. Bahnfleth, PH.D., PE The Pennsylvania State University Architectural Engineering Spring Ames.
Architectural Engineering Mechanical Option Ft. Detrick Defense Medical Logistics Center Building Systems Redesign April 16, 2008 Senior Thesis Presentation.
Senior Thesis 2013 Ji Won Park Mechanical Option Advisor: Dr. Stephen Treado.
Ray & Joan Kroc Corps Community Center Mathias Kehoe | Mechanical Option April 09, 2012.
QIAGEN Sciences Germantown, Maryland Joseph P. DiIenno Mechanical Option The Pennsylvania State University Architectural Engineering Senior Thesis – Spring.
NRUCFC Headquarters Building Sterling, VA Architectural Engineering Senior Thesis Margaret McNamara | Mechanical Option Advisor | Dr. Stephen Treado.
University Ridge at E ast Stroudsburg University Matthew Carr Spring 2007 Mechanical Option Faculty Advisor: Dr. Freihaut.
Hilton Hotel at BWI Airport Nathan Patrick The Pennsylvania State University Architectural Engineering – Mechanical Option.
UNIFIED SCIENCE CENTER THE UNIVERSITY OF SCRANTON SCRANTON, PA DALE E. HOUCK MECHANICAL OPTION.
Paul Roberts Senior Thesis 2010 Construction Management.
VIMS Seawater Research Laboratory Dan DiCriscio AE Senior Thesis Mechanical Option 2007.
Bronx School for Law Government & Justice Yulien Wong Mechanical Option 2006 Senior Thesis Bronx, New York.
Tri-Valley Jr./Sr. High School Hegins, PA Senior Thesis, Spring 2004 Studying The Feasibility of a Dedicated Outdoor Air System.
Architectural Engineering Senior Thesis Mechanical System Redesign Saint Joseph Medical Center Chris Nicolais.
New Middle School Geneva, Il Greg Kemerer AE Senior Thesis 2006 – CM Option.
Hilton Baltimore Convention Center Hotel Andrew Rhodes Spring 2007 Faculty Advisor: Dr. Bahnfleth.
APPELL LIFE SCIENCES York College of Pennsylvania Joshua Martz | Dr. Srebric | April 11, 2011 Image Courtesy of RLPS, Ltd.
University of Maryland’s Gossett Field House College Park, MD Jason Borowski Architectural Engineering Mechanical Option Pennsylvania State University.
Greenbriar East Elementary School Fairfax, Virginia Michelle L. Siano Mechanical Option Spring 2005 Senior Thesis.
Straumann USA 60 Minuteman Road Andover, MA Kevin Kaufman Mechanical Option The Pennsylvania State University Architectural Engineering.
Building Systems Integration - Energy and Cost Analysis The Milton Hershey School New Supply Center Justin Bem AE Senior Thesis – Spring 2007 Mechanical.
Malory J. Faust ∙ Mechanical Option ∙ Senior Thesis 2007.
Twin Rivers Elementary/Intermediate of McKeesport Area School District Tessa Bauman Mechanical Option Technical Consultant: Laura Miller 1600 Cornell St.,
BUILDING: LOCATION: SIZE: OCCUPANT: ARCHITECT: ENGINEERS: St. Francis Friary Hanceville, Alabama 59,900 square feet, 2 floors above grade Archdiocese.
Hamot Women’s Hospital Erie, PA Michael Galleher Mechanical Option l AE-Senior Thesis l April 12, 2011 l Advisor Dr. Jelena Srebric.
Outreach Innovation Building Kyle Pepperman The Pennsylvania State University Architectural Engineering Senior Thesis Spring 2005.
The School District of Philadelphia Administration Headquarters Shell and Core Renovations 440 North Broad Street Philadelphia, PA Jayme Antolik Architectural.
The Montgomery County Conference Center and Hotel 5701 Marinelli Road, Rockville, MD.
The New Student Housing Building at The Mount St. Mary’s University Emmitsburg, Maryland Erik Shearer Mechanical Option Advisor: Dr. Srebric Spring 2007.
NOLAN JAMES AMOS Dr. William Bahnfleth, Faculty Consultant architectural engineering senior thesis mechanical option PHOENIXVILLE EARLY LEARNING CENTER.
Harley-Davidson Museum Milwaukee, WI. Jonathan Rumbaugh, BAE/MAE Mechanical Option Advisor: Dr. William Bahnfleth.
Manoa Elementary School Amanda Cronauer Faculty Advisor: Dr. William Bahnfleth 14 April 2010.
Michael Reilly, Jr. – Mechanical Option Advisor – James Freihaut, PhD & Dustin Eplee The Pennsylvania State University Nassau Community College Life Sciences.
Harley-Davidson Museum
The Data Center Challenge
ENVIROCENTER PHASE II JESSUP, MD
David Anderson Mechanical Option
Grunenwald Science and Technology Building
Acterna Headquarters John M Sekel, EIT Germantown, Maryland
Biobehavioral Health Building, University Park, PA
LONGWOOD AT OAKMONT HEALTHCARE CENTER
The Ed Roberts Campus Berkeley, CA Introduction Existing Systems
Feasibility of Ice Storage
Senior Thesis Presentation
Lehigh Valley Heritage Center
Virtua Replacement Hospital -Voorhees NJ
Tri-Valley Jr./Sr. High School Hegins, PA
Presentation transcript:

INOVA Fairfax Hospital South Patient Tower Falls Church, VA Senior Thesis 2012 Mike Morder Mechanical Option Advisor: Dr. William Bahnfleth

INOVA South Patient Tower Introduction Depth 1: Central Chilled Water Plant Depth 2: Dedicated Heat Recovery Chiller Depth 3: Condensate Recovery Breadth 1: Two-Way Slab Reinforcing Breadth 2: Electrical Conclusion Acknowledgements Questions

INOVA South Patient Tower Introduction South Patient Tower Mechanical System Design Objective Depth 1: Central Chilled Water Plant Depth 2: Dedicated Heat Recovery Chiller Depth 3: Condensate Recovery Breadth 1: Two-Way Slab Reinforcing Breadth 2: Electrical Conclusion Acknowledgements Questions Building Introduction Addition to Existing Patient Bed Tower Located in Falls Church, VA 236,000 SF Overall Cost: $76 Million Completion Expected in June 2012 Site Map

INOVA South Patient Tower Introduction South Patient Tower Mechanical System Design Objective Depth 1: Central Chilled Water Plant Depth 2: Dedicated Heat Recovery Chiller Depth 3: Condensate Recovery Breadth 1: Two-Way Slab Reinforcing Breadth 2: Electrical Conclusion Acknowledgements Questions Project Team Architectural Aspects Owner: INOVA Health System Architect: Wilmot/Sanz, Inc. General Contractor: Turner Construction Structural Engineer: Cagley & Associates MEP Engineer: RMF Engineering, Inc. Civil Engineer: Dewberry & Davis Designed to Respect Existing Tower Natural Daylight Essential for Patient Rooms Focal Point – Atrium with Fountain at Entrance Pursuing LEED Silver

INOVA South Patient Tower Introduction South Patient Tower Mechanical System Design Objective Depth 1: Central Chilled Water Plant Depth 2: Dedicated Heat Recovery Chiller Depth 3: Condensate Recovery Breadth 1: Two-Way Slab Reinforcing Breadth 2: Electrical Conclusion Acknowledgements Questions Structural System Electrical System Typical 29’ x 29’ Bays Reinforced Normal Weight Concrete Two-Way Slab with Drop Panels Two 2000 kVA Transformers 600 A Bus Ducts Provide Service Throughout Building 2000 kW Emergency Generator

INOVA South Patient Tower Introduction South Patient Tower Mechanical System Design Objective Depth 1: Central Chilled Water Plant Depth 2: Dedicated Heat Recovery Chiller Depth 3: Condensate Recovery Breadth 1: Two-Way Slab Reinforcing Breadth 2: Electrical Conclusion Acknowledgements Questions Existing Mechanical System Connected to Existing Campus Central Plant Steam System- Domestic Hot Water Heating Heat Exchangers Provide HHW Chilled Water System- Supplies Cooling to AHUs No Booster Pumps in Building Four (4) 20,000 CFM AHU Majority of Bed Tower 10,000 CFM and 13,000 CFM AHU Supply Cafeteria and Kitchen Hoods Baseboard Radiators (Hot Water) Constant Air Volume Terminal Units Reheat Provided on Exterior Rooms

INOVA South Patient Tower Introduction South Patient Tower Mechanical System Design Objective Depth 1: Central Chilled Water Plant Depth 2: Dedicated Heat Recovery Chiller Depth 3: Condensate Recovery Breadth 1: Two-Way Slab Reinforcing Breadth 2: Electrical Conclusion Acknowledgements Questions Design Objective Chilled Water Plant Optimization Study Chiller Design/ Layout Centrifugal vs. Absorption Primary Secondary vs. Variable Primary Flow Dedicated Heat Recovery Chiller Air-Handler Condensate Recovery System Best Selections = Most Economical Most Energy Reduction Lowest Emissions

INOVA South Patient Tower Introduction Depth 1: Central Chilled Water Plant Design Alternatives First Costs / Energy Life-Cycle Cost Depth 2: Dedicated Heat Recovery Chiller Depth 3: Condensate Recovery Breadth 1: Two-Way Slab Reinforcing Breadth 2: Electrical Conclusion Acknowledgements Questions Introduction Location: 5 th Floor Mechanical Space Alternative 1: Purchased CHW and Steam Alternative 2: Centrifugal (Primary/Secondary) Alternative 3: Centrifugal (VPF) Alternative 4: Absorption (Primary/Secondary) Alternative 5: Absorption (VPF)

INOVA South Patient Tower Introduction Depth 1: Central Chilled Water Plant Design Alternatives First Costs / Energy Life-Cycle Cost Depth 2: Dedicated Heat Recovery Chiller Depth 3: Condensate Recovery Breadth 1: Two-Way Slab Reinforcing Breadth 2: Electrical Conclusion Acknowledgements Questions Alternative 3: Centrifugal (VPF) Centrifugal Chiller COP: GPM

INOVA South Patient Tower Introduction Depth 1: Central Chilled Water Plant Design Alternatives First Costs / Energy Life-Cycle Cost Depth 2: Dedicated Heat Recovery Chiller Depth 3: Condensate Recovery Breadth 1: Two-Way Slab Reinforcing Breadth 2: Electrical Conclusion Acknowledgements Questions Alternative 5: Absorption (VPF) Absorption Chiller COP: GPM

INOVA South Patient Tower Introduction Depth 1: Central Chilled Water Plant Design Alternatives First Costs / Energy Life-Cycle Cost Depth 2: Dedicated Heat Recovery Chiller Depth 3: Condensate Recovery Breadth 1: Two-Way Slab Reinforcing Breadth 2: Electrical Conclusion Acknowledgements Questions First Costs EquipmentUnit Cost Pump (7.5 HP)$ 4,070 / pump Pump (15 HP)$ 4,810 / pump Pump (30 HP)$ 8,440 / pump Cooling Towers – Induced (Axial)$ 38,220 / tower Centrifugal Chillers$ 350 / ton Absorption Chillers$ 550 / ton Schedule 40 Piping ( 8”)$ / LF Insulation$ / LF Unit Costs of Equipment RANK

INOVA South Patient Tower Introduction Depth 1: Central Chilled Water Plant Design Alternatives First Costs / Energy Life-Cycle Cost Depth 2: Dedicated Heat Recovery Chiller Depth 3: Condensate Recovery Breadth 1: Two-Way Slab Reinforcing Breadth 2: Electrical Conclusion Acknowledgements Questions Energy UtilityCost/Unit Electricity$ 23.45/ MMBTU Steam$ / MMBTU Chilled Water$ / MMBTU Water$ 2.16 / 1000 gal

INOVA South Patient Tower Introduction Depth 1: Central Chilled Water Plant Design Alternatives First Costs / Energy Life-Cycle Cost Depth 2: Dedicated Heat Recovery Chiller Depth 3: Condensate Recovery Breadth 1: Two-Way Slab Reinforcing Breadth 2: Electrical Conclusion Acknowledgements Questions Emissions

INOVA South Patient Tower Introduction Depth 1: Central Chilled Water Plant Design Alternatives First Costs / Energy Life-Cycle Cost Depth 2: Dedicated Heat Recovery Chiller Depth 3: Condensate Recovery Breadth 1: Two-Way Slab Reinforcing Breadth 2: Electrical Conclusion Acknowledgements Questions Life-Cycle Cost Analysis Alt. 1Alt. 2Alt. 3Alt. 4Alt. 5 Simple Payback BASELINE5.6 yrs.5.3 yrs.32.1 yrs.26.9 yrs. Discounted Payback BASELINE7.0 yrs.6.0 yrs.30+ yrs. Payback Summary Alternative 3: Centrifugal Chillers (VPF) Lowest Payback (Simple and Discounted) $2.4 Million Savings Compared to Current Design Lowest Energy and Emissions

INOVA South Patient Tower Introduction Depth 1: Central Chilled Water Plant Design Alternatives First Costs / Energy Life-Cycle Cost Depth 2: Dedicated Heat Recovery Chiller Depth 3: Condensate Recovery Breadth 1: Two-Way Slab Reinforcing Breadth 2: Electrical Conclusion Acknowledgements Questions Life-Cycle Cost Analysis

INOVA South Patient Tower Introduction Depth 1: Central Chilled Water Plant Design Alternatives First Costs / Energy Life-Cycle Cost Depth 2: Dedicated Heat Recovery Chiller Depth 3: Condensate Recovery Breadth 1: Two-Way Slab Reinforcing Breadth 2: Electrical Conclusion Acknowledgements Questions Life-Cycle Cost Analysis

INOVA South Patient Tower Introduction Depth 1: Central Chilled Water Plant Depth 2: Dedicated Heat Recovery Chiller Design/ Comparison Depth 3: Condensate Recovery Breadth 1: Two-Way Slab Reinforcing Breadth 2: Electrical Conclusion Acknowledgements Questions Dedicated Heat Recovery Chiller Module Chilled WaterHeat Rejection Cooling EER Heatin g COP EWT (F)LWT (F)EWT (F)LWT (F) 25 ton ton Cost / Unit Heat Recovery Chiller $ 600 / ton Heat Recovery Chiller Operating Conditions Unit Cost

INOVA South Patient Tower Introduction Depth 1: Central Chilled Water Plant Depth 2: Dedicated Heat Recovery Chiller Design/ Comparison Depth 3: Condensate Recovery Breadth 1: Two-Way Slab Reinforcing Breadth 2: Electrical Conclusion Acknowledgements Questions Dedicated Heat Recovery Chiller

INOVA South Patient Tower Introduction Depth 1: Central Chilled Water Plant Depth 2: Dedicated Heat Recovery Chiller Design/ Comparison Depth 3: Condensate Recovery Breadth 1: Two-Way Slab Reinforcing Breadth 2: Electrical Conclusion Acknowledgements Questions Dedicated Heat Recovery Chiller

INOVA South Patient Tower Introduction Depth 1: Central Chilled Water Plant Depth 2: Dedicated Heat Recovery Chiller Depth 3: Condensate Recovery Design Breadth 1: Two-Way Slab Reinforcing Breadth 2: Electrical Conclusion Acknowledgements Questions Condensate Recovery System Where: CFM = Airflow over Coil ρ air = density of air Δw = difference in humidity ratios across cooling coil JanuaryFebruaryMarchAprilMayJune Condensate (1000 gal.) JulyAugustSeptemberOctoberNovemberDecember Condensate (1000 gal.) Example Monthly Calculation (July)

INOVA South Patient Tower Introduction Depth 1: Central Chilled Water Plant Depth 2: Dedicated Heat Recovery Chiller Depth 3: Condensate Recovery Design Breadth 1: Two-Way Slab Reinforcing Breadth 2: Electrical Conclusion Acknowledgements Questions Condensate Recovery System Amount (1000 gal.)Annual Cost Water (Make-Up)4,891$ 10,565 Reduced Make-Up4,226$ 9,129 Savings14 %

INOVA South Patient Tower Introduction Depth 1: Central Chilled Water Plant Depth 2: Dedicated Heat Recovery Chiller Depth 3: Condensate Recovery Design Breadth 1: Two-Way Slab Reinforcing Breadth 2: Electrical Conclusion Acknowledgements Questions Depth Conclusions SPB: BASE

INOVA South Patient Tower Introduction Depth 1: Central Chilled Water Plant Depth 2: Dedicated Heat Recovery Chiller Depth 3: Condensate Recovery Breadth 1: Two-Way Slab Reinforcing Analysis Breadth 2: Electrical Conclusion Acknowledgements Questions Structural Breadth Assuming #6 Bars Middle StripColumn Strip Neg. Moment Pos. Moment Neg. Moment Pos. Moment Moment (M U ) Width Column Strip174” Effective Depth9.375” 14.25”9.375” M N = M U / φ R = (Mn x 12000) / bd ρ (Table A-3)* A s = ρbd5.383 in in in 2 A smin = bt3.289 in 2 N = (larger 7 or 8) / N min = width / (2t)9999 EquipmentAmountWeight/UnitTotal Weight (lbs) Centrifugal Chillers322,173 lb /each66,519 Heat Recovery Chiller42,000 lb / 25 ton8,000 Pumps9200 lbs / each1,800 Piping300 ft36.32 lb / ft10,896 Water lb / ft Steel Pipe (8”) lb / ft Total 87,215 Distributed LoadArea =3,364 ft lb / ft 2

INOVA South Patient Tower Introduction Depth 1: Central Chilled Water Plant Depth 2: Dedicated Heat Recovery Chiller Depth 3: Condensate Recovery Breadth 1: Two-Way Slab Reinforcing Analysis Breadth 2: Electrical Conclusion Acknowledgements Questions Structural Breadth Column Strip: Negative Moment:0 bars (Design OK) Positive Moment:(10) #6 bars / bay Middle Strip: Negative Moment:(6) #5 bars / bay Positive Moment:(8) #5 bars / bay Sizelb/ftAmountLength (ft)Total Weight (lb.) # # TOTAL Structural Additional Cost: $ 0.76 / lb X lb = $ 1,305.76

INOVA South Patient Tower Introduction Depth 1: Central Chilled Water Plant Depth 2: Dedicated Heat Recovery Chiller Depth 3: Condensate Recovery Breadth 1: Two-Way Slab Reinforcing Breadth 2: Electrical Equipment Sizing Conclusion Acknowledgements Questions Electrical Breadth Electrical Additional Cost: $ 73,489 EquipmentCost 1600 A Switchboard$ 3, A Panelboard$ 1,090 Motor Starters$ 5,751 Wire$ 17,650 Conduit$ 7,501 Circuit Breakers$ 38,047

INOVA South Patient Tower Introduction Depth 1: Central Chilled Water Plant Depth 2: Dedicated Heat Recovery Chiller Depth 3: Condensate Recovery Breadth 1: Two-Way Slab Reinforcing Breadth 2: Electrical Conclusion Acknowledgements Questions Conclusion Centrifugal Chillers with VPF Dedicated Heat Recovery Chiller Condensate Recovery Savings: $ million over 30 year life Simple Payback: 5.1 years Additional Structural / Electrical Costs Included Savings: $ million over 30 year life Simple Payback: 5.6 years MAE Course Relation AE 557- Centralized Cooling Chilled Water Plant Design / Study AE 558- Centralized Heating Life-Cycle Cost Analysis Utility Costs

INOVA South Patient Tower Introduction Depth 1: Central Chilled Water Plant Depth 2: Dedicated Heat Recovery Chiller Depth 3: Condensate Recovery Breadth 1: Two-Way Slab Reinforcing Breadth 2: Electrical Conclusion Acknowledgements Questions Dr. William BahnflethFaculty Advisor, Penn State University Joseph KranzProject Executive, Turner Construction Tessa TeodoroProject Engineer, Turner Construction Andrew RhodesDesign Engineer, Southland Industries Kevin SmithEnergy Engineer, Southland Industries Raj VoraDirector, Life Sciences, Southland Industries Joe MulliganSales Engineer, Boland TRANE Tony McGheeAccount Executive, Johnson Controls Inc. Acknowledgements THANKS ALL OF YOU! All my fellow AE peers, friends and family for their support throughout the thesis process.

INOVA South Patient Tower Introduction Depth 1: Central Chilled Water Plant Depth 2: Dedicated Heat Recovery Chiller Depth 3: Condensate Recovery Breadth 1: Two-Way Slab Reinforcing Breadth 2: Electrical Conclusion Acknowledgements Questions THANK YOU QUESTIONS?

INOVA South Patient Tower