(1)[12~13/Dec/2009] Optical inspection (2)[14/Dec] frequency & field flatness measurement (3)[10/Mar/2010] pre-EP (5μm) (4)[11/Mar] EP1 (100μm) (5)[11/Mar]

Slides:



Advertisements
Similar presentations
E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 1 Operational Results from STF-VTS and Cryomodule Tests at KEK Eiji Kako (KEK, Japan)
Advertisements

6/Nov/2012 TTC Meeting 1 Improvement of cavity performance by T-mapping/X-ray-mapping, optical inspection and local grinding Kirk.
KEK cavity status, March 2011 H. Hayano, ALCPG11, WG3, Eugene.
Stain appeared after EP acid renewal Field emission at low gradient happened on MHI-06, MHI-07, in VT. Kyoto-camera found brown stain trace in beam pipes,
Recent Surface Studies in KEK-STF
ILC PM Meeting S0 Webex Global Design Effort 1 S0/S1 Next Steps Lutz Lilje GDE.
ILC08 Chicago Global Design Effort 1 Discussion of Optical Inspection and Temperature mapping Results Several new inspection and mapping systems.
Accelerator R&D on LC - Activities of ATF & STF - 1. Introduction 2. ATF 3. STF 4. Summary Seiya Yamaguchi, KEK The US/Japan Collaboration in High Energy.
1.3 GHz SRF Cavity R&D Plan Jiyuan Zhai ILC Group, IHEP 3 rd IHEP-KEK 1.3 GHz SRF Meeting, 7 Dec 2010, Beijing.
Jim Kerby, Fermilab for Rongli Geng and the S0 Cavity Team 23 May 2010 Current Status of SCRF Cavity Development SCRF Cavity Technology and Industrialization.
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
E. KAKO (KEK) 2009' Dec. 22 S1-G Webex meeting Global Design Effort 1 Final Results of KEK Cavities for S1-Global Eiji Kako (KEK, Japan)
Status of cavity fabrication facility at KEK H. Hayano, KEK Cavity Industrialization Study at KEK Superconducting RF Cavity Technology and Industrialization.
Summary of Main Linac SCRF-part H. Hayano, ILC08 at UIC.
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
Superconducting rf test facility STF 1 Optical Inspection update at KEK Ken Watanabe ( KEK ) ILWS08 in Chicago 17-Nov-08.
Field emission issue and strategy to improve H. Hayano.
Cavity Gradient for the R&D and ILC Operation Akira Yamamoto ILC-GDE SCRF Presented at the AD&I meeting held at DESY, Dec. 2-3, 2009 A, Yamamoto,
R.L. Geng, KEK September 9, 2010 Global Design Effort 1 Near Term ILC Gradient R&D R&D Specification and Standardization Gradient Gradient Yield/Scatter.
1 E. KAKO (KEK) 2012' May 28 Clermont 1 A_RD_03 R/D for the High Power Couplers for ILC Walid KAABI (LAL-Orsay, France) Eiji KAKO (KEK, Japan)
TILC09 / SCRF Session Update on S0 Work in the Americas Region Mark Champion, Fermilab With slides provided by: Zack Conway, Cornell Rongli Geng, Jefferson.
Achievement of 41 MV/m Gradient by AES8 Rong-Li Geng Jefferson Lab ALCPG09, October 1, 2009.
Global Design Effort 1 S0 Status High-Gradient cavities Lutz Lilje DESY supplement by H. Hayano 04Sep2008 EC
Cavity status; recent KEK activities : Hayano (1)STF CM-1 cavities are; MHI MV/m for CM-1 ILC cryomodule (3-rd VT) MHI MV/m for.
R.L. Geng, 5/27-31,2013 ECFA LC2013, DESY 1 Update on Raising Q0 at Ultra-High Gradient via Large-Grain Niobium Material Rongli Geng Jefferson Lab ECFA.
ILC Cavity Gradient R&D Plan Proposal for Release 5 Rongli Geng for ILC Cavity Group 2jun2010 ILC SCRF WebEx Meeting 6/2/20101ILC SCRF WebEx Meeting.
CRAB for HL-LHC KEK activity 2010DEC Yoshiyuki MORITA.
Superconducting rf test facility LCWS 2010 in Beijing, 28 Mar 2010, Ken Watanabe Replica-method and local grinding repair K. Watanabe (KEK) LCWS 2010 in.
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
HiGrade-Kickoff DESY Global Design Effort 1 ILC-HiGrade WP6 High-Gradient cavities Lutz Lilje DESY.
10/1/09 R.L. Geng ALCPG09, Albuquerque, NM 1 Cavity R&D Status and Future Plans - with a partial summary of SRF2009 Rongli Geng Jefferson Lab.
Update on S0 Work in the Americas Region Mark Champion 17 June 2008.
KEK-STF Vertical Test and Diagnostics Brief History & Future Plan Vertical Test Facility Cavity Diagnostic System Example of MHI#7 Cavity Summary of T-mapping.
Current study status of high gradient at KEK Fumio Furuta KEK SCRF meeting Fermilab. Apr
2 nd Workshop of the IHEP 1.3 GHz SRF R&D Project and 2nd IHEP-KEK 1.3 GHz SRF Meeting Opening Remark J. Gao December 2-3, 2009, IHEP, Beijing, China.
IHEP GHz 9-cell Cavity R&D Status and Plan The Third IHEP-KEK 1.3GHz SC Technology Collaboration Meeting Dec. 7-8, 2010, IHEP, Beijing GAO Jie,
ALCPG2011, 3/19- 23, SRF Group Institute of Heavy Ion Physics, Peking University ALCPG /3/19-23, Eugene, Oregon, USA RF superconducting Cavity.
Recent Results of Vertical Test for S1-Global Project at KEK-STF Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, H. Sakai, M. Satoh, T. Shishido, K. Umemori,
Explosive Events during V.T. in KEK ECFA (2013/5/30) 1.
MHI#16 号機の2回目の EP2  Process log  Status of working  Monitor data during EP & Rinsing process  Comparison of EP2 Period : 2011/5/10 ~ 5/16 Process :
Summary of Results and Development of Online Monitor for T-mapping/X-ray-mapping in KEK-STF Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, M. Satoh, T. Shishido,
MHI#19 号機の1回目の EP2  Process log  Condition of EP2 & Rinsing process  Status of working  Monitor data during EP & Rinsing process Period : 2012/2/17~
Update on S0 Work in the Americas Region Camille Ginsburg (FNAL) 2 June 2009 Slides/Info from: Zack Conway (Cornell) Rongli Geng (JLab) Genfa Wu, Dmitri.
Americas Report C.M. Ginsburg (FNAL) for the FNAL/ANL, JLab, and Cornell (no report this time) cavity teams S0 Meeting 7.June 2011.
Summary of STF-EP facility at KEK.
Recent Result for the STF-2 Cryomodule Operation
Rongli Geng ILC Cavity Group Meeting October 25, 2011
Cornell Updates Commissioning of T-map for ILC single cell starts.
ILC10 Beijing Global Design Effort
Electropolishing of Dressed ILC 9-cell Cavity
ILC-SCRF Test Facilities considerations
STF Plan of gradient improvement
Inspection of STF Baseline cavity #5 and #6
FNAL recent coupler troubles
for the FNAL/ANL, JLab, and Cornell cavity teams
Effort Torwards Improving Large Scale Production for SC Cavities
Cost reduction activities in cavity fabrication at MHI
Jiyuan Zhai ( IHEP ) TTC Meeting, JLAB, 6 Nov 2012
Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, M. Sato, T. Shishido, K
Recent VT Results in the STF-2 cavities
Recent SCRF Activities in IHEP
2. SCRF General Preparation for the AD&I Preparation for AAP Review
Quality control study with single-cell cavities
Vertical Test System and T-mapping/X-ray-mapping at KEK-STF
WG3: Main Linac SCRF(cavity,cryomodule)
FOR SUPERCONDUCTIVE CAVITIES
Vertical Test Results of 9-Cell Cavities for LCLS-II
Cavity Degradation Experience at S1-Global
Cavity & Cavity Integration; recent KEK activities
Presentation transcript:

(1)[12~13/Dec/2009] Optical inspection (2)[14/Dec] frequency & field flatness measurement (3)[10/Mar/2010] pre-EP (5μm) (4)[11/Mar] EP1 (100μm) (5)[11/Mar] Degreasing (FM-20, 1hour) (6)[11/Mar] HPR (2hours) (7)[15~19/Mar] Annealing (8)[7~14/Apr] pre-tuning ( MHz, 97.1%) (9)[14~30/Apr] Optical inspection (10) [12/May] EP2 (20μm, 35mA/cm 2 ) (11) [12/May] Degreasing (FM-20, 2hours) (12) [12~13/May] HPR (10hours) (13) [13/May] Assembly working in C.R. & Baking (14) [20/May] 1 st V.T. (23.8MV/m, 1.11x10 10, cell #1 heating) (15) [25~27/May] Optical inspection (16) [31/May~2/Jun] pre-tuning ( MHz, 95.5%  MHz, 97.4%) (17) [9/Jun] EP2 (20μm, 32mA/cm 2 ) (18) [9/Jun] Degreasing (LIQUINOX, 2hours) (19) [9~10/Jun] HPR (10hours) (20) [10/Jun] Assembly working in C.R. & Baking (21) [17/Jun] 2 nd V.T. (25.7MV/m, 0.81x10 10, cell #1 heating) (22) [22~28/Jun] Optical inspection & Making replica (23) [30/Jun] frequency & field flatness measurement ( MHz, 95.0%) (24) [12~29/Jul] Manually & Locally grinding by sponge (25) [30/Jul] EP1 (100μm) / Scrubbing around beampipe & HOM couplers (exercise) (26) [2~5/Aug] Annealing (27) [5~7/Aug] pre-tuning ( MHz, 69.1%  MHz, 98.9%) (28) [9~13/Aug] Optical inspection & Making replica (29) [13~21/Jul] New EP acid exchange (30) [25/Aug] EP2 (20μm, 33mA/cm 2 ) / Scrubbing around beampipe & HOM couplers by clean cloth (31) [25/Aug] Degreasing (FM-20, 2hours) (32) [25~26/Aug] HPR (9hours) (33) [26/Aug] Assembly working in C.R. & Baking (34) [3/Sep] 3 rd V.T. (19.5MV/m, 1.12x10 10, cell #1 heating) (35) [7~10/Sep] Optical inspection & Making replica (36) [13/Sep] frequency & field flatness measurement ( MHz, 94.7%) (37) [14~15/Sep] pre-tuning ( MHz, 94.7%  MHz, 98.2%) (38) [?] Shipping to J-Lab Recent Results of 1.3GHz 9-cell Superconducting Cavities in KEK-STF Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, M. Satoh, T. Shishido, K. Umemori, K. Watanabe(KEK) abstract MHI#10 and #11 cavities were measured in KEK-STF as the s0 plan for ILC. After these vertical tests, they will be sent to J-Lab and tested at least once there. Recently, two new cavities without HOM coupler were fabricated and measured in STF, which were made by two new vendors (HITACHI and TOSHIBA). As the international collaboration, one cavity from IHEP in Beijing was sent to KEK, optical inspected, high pressure rinsed and vertical tested. In this report, the results of the vertical test for these cavities will be presented in detail. Introduction In the fabrication of MHI#10 and #11 (4 th batch) in , the procedure of the electron beam welding (EBW) was changed. Specifically, the centring location at the dumbbell connection was introduced for the first time. This technology is already used in some foreign companies. Due to this change, the condition of EBW had also changed. However, the parameters of EBW were same as before, not changed. There is not any other changing condition for these cavities at the stage of the fabrication, compared to the old ones. Two new Japanese vendors joined in the fabrication of the 1.3GHz superconducting cavity from This trial was successful and their first prototype cavities were completed. After the normal process, including the optical inspection, EP, annealing and pre-tuning, they were vertical-tested at STF. KEK-IHEP collaboration started from 2008 for the superconducting cavity technology. The first prototype, which shape is the Low- Loss type, was completed at IHEP in 2010 and sent to STF for the vertical testing after the final surface treatment THP018 Result of MHI#10 quench by defect quench by defect quench by defect Summary of vertical tests at KEK-STF 1 st batch : MHI#1-#4  STF Phase-1 2 nd batch : MHI#5, #6 S1-Global 3 rd batch : MHI#7-#9 (except for MHI#8) 4 th batch : MHI#10-#11  S0 plan 1 st batch2 nd batch3 rd batch From 1 st batch to 3 rd batch, the average gradient is gradually increased. However, any cavity reach the ILC specification yet at STF. In 4 th batch, the average gradient dropped below 20MV/m, because the centering location was introduced for the first time at the connection of the dumbbells, and the condition of EBW was changed. For low current density EP, there are four successful examples including two 2-cell cavities for the cERL injector. Average V.T. STF Phase-1S1-GlobalS0 plan 23MV/m 31MV/m19MV/m Max. Achievable Gradient for each cell by passband measurement 1 st nd 3 rd T-mapping result Process History of MHI#10 after arrival at STF Cell #1, equator, 354° 3D Analysis disappearance New defect (other location) caldera-like defects 1 st 2 nd 9/Jun/ rd average current density [mA/cm 2 ] cavity temperature [ ℃ ] Making replica brown stains observed after 3 rd V.T. R. Geng C. Ginsburg S. Aderhold Local grinding equator iris After the exchange to new EP acid, they appears suddenly. 115μm original defect new defect degradation of field flatness date# of V.T.field flatnessfrequencyfield flatnessfrequencyΔ before V.T.after V.T. %MHz% % 2010/5/311 st V.T /6/302 nd V.T /9/133 rd V.T % Manual grinding T cavity [ ℃ ] average current density [mA/cm 2 ] 32.8±2.0mA/cm ±0.9mA/cm ±0.8mA/cm ±0.5 ℃ 25.1±0.4 ℃ 22.4±0.4 ℃ comparison between new and old EP acid Result of MHI#11 They disappears after annealing... field emission Result of HIT#1, TOS#1 & IHEP#1 scrubbing by clean cloth processed! New Vendors of Cavity Fabrication in Japan International Collaboration between KEK and IHEP