GRI Investment work stream The Hague, 13 July 2007 Preliminary results and next steps.

Slides:



Advertisements
Similar presentations
Madrid, 29 th January th RCC Meeting South Gas Regional Initiative.
Advertisements

Open seasons in European Markets: Overview and initial lessons learned Dominique Jamme ERGEGs Gas Focus Group (GFG) XIV Madrid Forum, May 2008.
1 In France, new capacity is developed and allocated via open season procedures The GGPOS establish how an open season should be conducted To compete with.
BEB Transport und Speicher Service GmbH, Hannover Capacity Development NW Region Capacity Development in the North-West.
14 april GRI NW Role of TSOs within the GRI.
XVII Madrid Forum January 2010 ERGEG Gas Regional Initiatives P rogress and future work Peter Plug NMa, Director.
RCC Meeting 13 December 2007 Interconnections: primary market IP Taisnières / Blaregnies / Quévy IP Taisnières / Blaregnies / Quévy IP Obergailbach / Medelsheim.
Capacity Workshop Introduction Gas Regional Initiative – North West Region London 14 November 2008 Chair: Dominique JAMME Director of Gas Infrastructure.
GRI North West – RCC Meeting on 28 August Day Ahead – status and legal issues Background Day Ahead pilot project was launched within the ERGEG.
Heinz Hilbrecht Director "Security of Supply and Energy Markets" European Commission - DG TREN , GRI NW, Amsterdam Regional Cooperation Role of.
Gas Regional Initiative - Region North / North-West Stakeholders Group Meeting The Hague, October 9th, 2006.
Directie Toezicht Energie 11 Roadmap GRI NW Robert Spencer, NMa/DTe.
Gaz-System S.A. Transmission System Operator Gdynia,
European Transparency Project Progress Olaf Islei European Strategy and Environment 04 September 2008.
ERGEG Regional Gas Market North-West Workshop on Interconnections & Primary Capacity Market Interconnection Point Oude Statenzijl H-gas Kick-off Meeting.
Energiekamer RCC Meeting 28 August 2008 The Hague Maya van der Steenhoven & Kristien van de Laar PROGRAMME OFFICE - GRI NW.
Sources of Natural Gas Supply - European Union
Update on GTE Reverse Flow Study Vaclav Vocilka GIE Vice Executive Secretary Stakeholder Group Meeting GRI SSE, Gdynia 26 June 2009.
28 September 2004Energy Community South Eastern Europe1 Gas in South Eastern Europe GTE presentation Philippe Mannoni GTE Executive Secretary Zagreb, 28.
1 The Regulatory Approach to Fostering Investment David Halldearn Ofgem 28 September 2006.
1 Brussels, 27 th February th GRI Coordination Group South Gas Regional Initiative.
EG pfa-sb Athen_November2005.ppt GIE Annual Conference The View of the Users of Gas Infrastructures Presented by Dieter Pfaff E.ON Ruhrgas AG Chairman.
Paris, 16 th March th SG Meeting South Gas Regional Initiative.
GRI NW TRANSPARENCY PROJECT Olaf Islei OFGEM RCC 13 May 2009.
Gas Regional Initiative – North West Region IG meeting The Hague – 25th March, 2009 Open Seasons Coordination Marie-Claire AOUN – CRE
Gas Regional Initiative North-West Transmission System Operators Page 1 Investment work stream GRI North-West Operators‘ Group Investment Work Stream SG.
Sound Investment Climate? Jacques Laurelut GTE President CEO of GRTgaz Bratislava, 28 September 2006.
How TSOs can further contribute to efficient competition GIE ANNUAL CONFERENCE ATHENS 2005.
GRI NW Transparency Stockholm Stakeholder Group Conference 26 November 2009 Martin Crouch Partner: European Strategy.
1 Gas Regional Investment Plan North West Europe GRI Meeting, November 25 th 2011.
Gasunie gaat verder in gastransport Sharing lessons from unbundling Dutch unbundling, a long and winding road 4 November 2005, Athens.
GRI Transparency Workshop London 19 September 2007 Centrica Storage Limited & Gas Storage Europe.
8 February Study Co-Ordination on Day Ahead Capacity in Bunde/Oude Statenzijl and Ellund EC-Operators of Implementation Group ERGEG Regional Gas.
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
6th Stakeholder Group Meeting Stockholm - 26 November, 2009 Gas Regional Initiative – North West Region Experience with coordinated o pen seasons Dominique.
GTE views on the role of TSOs As foreseen in the Third Package Joint Workshop ERGEG GRI SSE and EFET 21 January 2008.
© ONTRAS Development and innovative strategies for transmission system operators Ralph Bahke Managing Director, ONTRAS.
Gas Regional Initiative Region North-West Transparency Project Nicola Meheran, Ofgem.
Madrid, 1 st April 2008 Proposal for the commercialisation of existing and committed capacity at the cross border point of Larrau between France and Spain.
Welcome to the Workshop on Interconnection Points: Welcome to the Workshop on Interconnection Points: Taisnières / Blarégnies / Quévy Oude Statenzijl /
Gas Regional Initiative – North West Region Pierre-Marie Cussaguet (CRE) Dr. Stefanie Neveling (BNetzA) Bonn Workshops 8 and 9 Feb Workshop: Interconnections.
Bonn Workshops 8 and 9 Feb Balancing workstream.
Gas Regional Initiative – North West Region London 13 and 14 November 2008 Project manager: Erik Rakhou Investment project – I1 (in co-operation with I2)
Gas Regional Initiative North-West Transmission System Operators Page 1Transmission Transparency, Transmission Transparency Project Project.
Gas Regional Initiative North-West Transmission Transparency Second Mini Transparency Workshop Transmission Transparency Project GRI North-West Operators‘
The Central Role of the Network Operators 28 March 2007 ERGEG-GTE Meeting.
TSO Transparency project Gas Regional Initiative North West Nicola Meheran, Ofgem Regional Co-ordination Committee 15 September 2011.
Role of Storage Facilities GTE 2nd Annual Conference, 23./ – Copenhagen © VNG 2004 Barbknecht Speaker: Klaus-Dieter Barbknecht Director Gas Transport.
Transmission Transparency Workshop European Strategy and Environment 10 July 2008.
GRI NW TRANSPARENCY PROJECT Transparency Workshop 31 March 2009.
Directie Toezicht Energie 1 Gas Regional Initiative North West Maya van der Steenhoven Programme Office 28 April, 2009 Bonn.
European Ten Year Network Development Statement Volker Schippers GTE+ Senior Adviser GTE+ Workshop on GTE+ Work Programme 24 June 2008.
Gas Regional Initiative North-West Transmission System Operators Page 1Transmission Transparency, Transmission Transparency Project GRI North-West.
GRTgaz North  South Link Capacities Sales Organization Considering Future France – Spain Developments 5 th SG meeting of S-GRI in Madrid.
1 CRE proposal on how to allocate capacity according to the Joint Enagas, TIGF and GRTgaz investment plans: points that have been agreed / still need to.
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
Click to edit Master title style 1 Neta Meidav Manager, Ofgem GRI NW 9 th Stakeholder Group Meeting 25 November 2011, Rotterdam GRI NW Transparency Project.
1 Open Seasons between France and Belgium GRTgaz Fluxys Gas Regional Initiative North-West Stakeholders Meeting 7 May 2010.
Gas Regional Initiative W orkstream regulatory co-ordination, subfocus investment Workshops Bonn, 8 February 2007 Draft 2.
Implementation progress – second stage Transmission Transparency Workshop London, 14 November 2008.
18 December Study Co-Ordination on Day Ahead Capacity in Bunde/Oude Statenzijl and Ellund EC-Operators of Implementation Group ERGEG Regional Gas.
The Regional Initiatives deliver concrete results in the regions but will the regions join up? Ms Asta Sihvonen-Punkka ERGEG’s Electricity Focus Group.
Gas Regional Initiative – North West Region Stakeholders Group meeting - London 14 November, 2008 Capacity Workshop Coordinated Open Seasons Marie-Claire.
Transparency Project GRI NW Region
GRI Transparency Workshop London 19 September 2007
Marie-Claire AOUN CRE
ERGEG GRI South South East – , Maribor
GRI NW TRANSPARENCY PROJECT
EUROPEAN TRANSPARENCY UPDATE
Day Ahead Capacity Trading
Presentation transcript:

GRI Investment work stream The Hague, 13 July 2007 Preliminary results and next steps

Overview TSO responses TSOCountryquestionnaire returned Gas Transport Services B.V.NLX E.On Gastransport AG & Co KGDX Energienet.dkDKX BEB Transport und Speicher Service GmbHDX Swedegas ABSX RWE Transportnetz Gas GmbHDX Bord Gais EireannIRLX WINGAS TRANSPORT GmbH & Co. KGDX GRTgazFX ONTRAS – VNG Gastransport GmbHDX BBLNL informal contact (phone, ) National GridUK informal contact (phone, ) FluxysB EWED InterconnectorB/UK Dong PipelinesD GASSCON Gaz SystemPL Investment survey

Preliminary results: Recent Projects Most common arrangements: –Built on demand; few open seasons –Regular TPA Most common problem: –Regulatory uncertainty –Insufficient economic return (expected) Suggested solutions –Change of mindset by NRA (to achieve stable and fair regulatory framework) –Increased regulatory co-ordination –Specific NDI framework

Preliminary results: New Projects Demand acquisition: –nearly exclusively open season Difficulties foreseen: –Regulatory uncertainty –Insufficient economic return –Potentially inter-TSO co-ordination issues Various open seasons ongoing or under consideration

(Planned) Open Seasons and investment projects RWE Transp. Folmhusen - OSZ Wingas Transport N-Stream related inv. Fluxys/ GRTgaz joint OS Ontras BGI Ontras PL-D extension Energinet.dk Baltic pipe Energinet.dk Skanled Energinet.dk Ellund extension Swedegas AB Skagerrak crossing RWE Transp. CZ-B pipeline* *not mentioned in questionnaire GTS OS 2012 BBL extension Potential Norwegian investments* GRTgaz LNG terminals

Next steps: Recent Projects Goal: –How to improve current situation and learn from recent projects? Possible actions: –Ideas on how to improve regulatory uncertainty? Easy wins? –Develop best practice open season? Overlap with European work on GGP OS?

Next steps: New Projects (proposal) 1.Website with an overview of the initiatives and links to sites of TSOs conducting an open season/contact details Is it required/ found useful by the market? Assess costs Decide on platform (GTE, ERGEG, other?) Financing 2.Inter-TSO co-ordination for open seasons that are running Organise the inter-TSO co-ordination of running/planned open seasons (technical, timing, capacities etc)