1 LBT Q1 2009 Eng/SW Review ECS: Enclosure Control System.

Slides:



Advertisements
Similar presentations
OC ORSTF Position WECC Board Meeting December 8, 2006.
Advertisements

J.B. Speed School of Engineering University of Louisville KEEPS Energy Management Toolkit Step 2: Assess Performance & Opportunities Toolkit 2J: Building.
06 April 2009 LBT Q Eng/SW Review LBT Q Eng/SW/Mtn Review OSS – Optical Support Structure Paul Grenz.
LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
1 LBT Q Eng/SW Review SHTR: Shutters. 2 Highlights (Q1/2009) Shutters have been working well, generally Shutters have been working well, generally.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli, Chris Biddick.
31 October 2006 M. De La Peña Software Cross-Training Session LBT TCS - ECS 1 Enclosure Control System (ECS) Michele De La Peña.
Ocean Dunes Special Assessment 2013 o Problems with Roofs Building Envelope and Generators o Roofs – No Name Storm o Generators – Rust, mechanical problems.
Project Management and MS Project. The project management triangle: Time Resources Scope.
/t/ / I d/ /d/ Try Again Go on /t/ / I d/ /d/
“We Bring Engineering to Life” U.S. Tobacco GAP – Barn Testing Procedure.
Briefing on the Embarcadero Thank you Realtors for joining us.
LBT Q Eng/SW Review ROT - Rotators. 4-Apr-2008LBT Q Eng/SW Review Highlights First BG rotator installed First BG rotator installed BG cable.
Magellan Telescopes Observatory Report Accomplishments Problems Work in Progress Network f5 mirror coating.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Engineering Review Primary Mirror Cells Biddick/Gusick/Kern.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
1 LBT Q Eng/SW Review ECS: Enclosure Control System.
LBT Q Eng/SW Review TEL – TELEMETRY Tony Edgin.
LBTO software startup/shutdown and troubleshooting July 18, 2006 Chris Biddick 1 cjb.
LBT Q Engineering and Software Review ENGG Engineering General.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli.
1 LBT Q Engineering Review ICS – Instrument Cooling System.
LBT Q Software Review GCS – Guiding and Active Optics.
Preparing For Drought Alexander Hinz Daniel Rice Dorothy Young ________________ Water Supply Division Texas Commission on Environmental Quality 2015 TCEQ.
1 LBT Q Eng/SW Review PVM: Preventive Maintenance.
20 October 2008LBT Q Eng/SW Review0 PCS – Pointing Control Subsystem Michele De La Peña.
LBT Q Eng/SW Review TERC Tertiary Mirror Units Commissioning.
1 LBT Q Eng/SW Review PLMG: Plumbing. 2 Highlights (Q2/2008) Have recently replaced worn contactors in the Primary Loop chillers Have recently replaced.
How do winter storms form? When cold air mixes with warm air A snow storm is usually very windy.
LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
LBT Q Eng/SW Review MCSC – Mount Control System.
LBT Q Engineering Review Instrument Cooling.
1 LBT Q Eng/SW Review ICS – Instrument Cooling System.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
ME 102A Spring 2010 April 21, 2010 Jennifer Lew Stephen Tu.
LBT Q Eng/SW Review SFWG – Software Group Norm Cushing.
1 LBT Q Engineering Review PLMG: Plumbing, includes IC system, chiller systems, instrument lab cooling, and LUCIFER cryo-compressor cooling.
LBT Q Eng/SW Review MCSC – Mount Control System.
LBT Q Eng/SW Review CM – Configuration Management Stephen Hooper.
1 LBT Q Eng/SW Review PWR: Site electrical power.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Engineering Review ESW Engineering Software.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
1 LBT Q Engineering Review ECS: Enclosure Control System, includes the dewpoint sensor, CA system upgrades, grounding, enclosure track performance.
LBT Q Engineering and Software Review ENGG Engineering General.
LBT Q Engineering/Software Review ROTRotators.
1 LBT Q Eng/SW Review PWR: Site electrical power.
LBT Q Eng/SW Review DIMM – Differential Image Motion Monitor.
Software Development Cycle and Roles in a Project Team
ERA Project Team Meeting Project Management Plan April 23, 2002.
1 LBT Q Eng/SW Review PLMG: Plumbing, Chiller Systems.
LBT Q Engineering Review Swing Arms (SWA). 10-Jul-2007LBT Q Engineering Review Highlights (Q2/2007) The right secondary arm is wired and the.
LBT Q Engineering Review Primary Mirror Cells.
LBT Q Eng/SW Review SFWG – Software Group General Norm Cushing.
1 LBT Q Eng/SW Review PSPI: PEPSI installation preparation.
Pest Management.
Quicken technical support number SDFGFFGGDF. QUICKEN TECHNICAL SUPPORT NUMBER QUICKEN TECHNICAL SUPPORT NUMBER
What are the Auto Repairs Needed the Professional's Help to Fix
ВОМР Подмярка 19.2 Възможности за финансиране
Споразумение за партньорство

Budget Software Tool Update

Community Practice Asset Management.
Presentation transcript:

1 LBT Q Eng/SW Review ECS: Enclosure Control System

2 Highlights (Q1/2009) We continue to monitor enclosure track, due for another bevelling We continue to monitor enclosure track, due for another bevelling Enclosure rotation ran at 1.5 deg/sec without problems, however, when tried to repeat when cold, it didn’t work Enclosure rotation ran at 1.5 deg/sec without problems, however, when tried to repeat when cold, it didn’t work Dew point of compressed air lines to mirror cells is below -80 deg C and is now monitored in the ECS GUI, alarms are active Dew point of compressed air lines to mirror cells is below -80 deg C and is now monitored in the ECS GUI, alarms are active ECSGUI bugs fixes and improvements are being addressed as time is available ECSGUI bugs fixes and improvements are being addressed as time is available

3 Open Issues Technical – almost no change Technical – almost no change Snow melt dampers in enclosure roof Snow melt dampers in enclosure roof Leaks along the roof, some repairs have been completed Leaks along the roof, some repairs have been completed High bay roof repair, scheduled for Q2 if funds available High bay roof repair, scheduled for Q2 if funds available Brush seals for rotating enclosure and vent doors Brush seals for rotating enclosure and vent doors Schedule Schedule All these issues take time and resources to fix, other more urgent things seem to pre-empt these tasks All these issues take time and resources to fix, other more urgent things seem to pre-empt these tasks Financial Financial Order parts for roof repair, contract to complete the work, ~$75k Order parts for roof repair, contract to complete the work, ~$75k Resources Resources Roof repair, seal design, … Roof repair, seal design, …

4 Planning (Q2/2009) Implement software updates in ECS GUI for changes made to the ECS Implement software updates in ECS GUI for changes made to the ECS Finish lightning shoe refit on 3U Finish lightning shoe refit on 3U High bay roof repair High bay roof repair