METHODOLOGY AM0031: BRT BOGOTÁ (COLOMBIA): TransMilenio PHASE II - IV MAIN PROBLEMS.

Slides:



Advertisements
Similar presentations
Key provisions and institutional arrangements of the CDM Christine Zumkeller UNFCCC/Cooperative Mechanisms
Advertisements

An Introduction to professional services. The professional services The professional services support businesses of all sizes across the economy, providing.
Title: Energy and Environmental Benefits of Bus Rapid Transit in APEC Economies Presenter’s Name: Walter Kulyk Economy: United States 35th APEC Transportation.
Validation and Verification of CDM Projects Climate Change Kiosk on CDM/DNA, COP9 December 6, 2003 Marco van der Linden SGS Climate Change Programme.
ICAO Symposium on Aviation and Climate Change, “Destination Green”, 14 – 16 May 2013 Destination Green Overview of the United Nations’ offset mechanisms.
Capacity Development for CDM - National Workshop on PDD, Cairo June Capacity Development for CDM Fourth National Workshop Cairo, June.
1 EQUATE RESTRICTED - For internal use only Performance Metrics Guidance Document For GPCA Member Companies Asrar Mohammad EQUATE Petrochemical.
GIS methodology for bicycle parking planning in BRT systems: Case study in Bogota - Colombia Daniel PáezUniversidad de los Andes.
UNFCCC How to address DOE Liability in context of PoA: Perspective of a Project Developer 8 th May 2011 Gareth Phillips Chairman, Project Developer Forum.
Evaluation of Geographic Information Systems Spatial Analysis Tools in the Resolve of Service Areas for Transportation Systems: Case Study of the Bus Rapid.
Author: MARA ĆUJIĆ An Analysis of the Task List impact upon RAMS Workload Calculations November, 2004.
OH 2-1 Agenda Sign in for all classes to earn credit for class Sign up for Presentations A test final test question will come from each of the group presentations.
Project Integration Management Sections of this presentation were adapted from A Guide to the Project Management Body of Knowledge 4 th Edition, Project.
QUALITY FUNCTION DEPLOYMENT CHAPTER 12
Info /7 DMU1 The story so far… Systems Analysis & Design Academic Year 2008/9 Lecture 10.
CONTACT SEMINAR November 2008 Project management tools.
RISK MANAGEMENT IN SOFTWARE ENGINEERING RISK MANAGEMENT IN SOFTWARE ENGINEERING Prepared by Prepared by Sneha Mudumba Sneha Mudumba.
Título Subtítulo o texto necesario COLOMBIAN DNA REQUIREMENTS FOR LOCAL STAKEHOLDERS CONSULTATION PROCESS OF CDM PROJECTS/POAS UNFCCC LAC Regional Workshop.
REVIEW AND QUALITY CONTROL
Presented by: Cecelia Largo-Nez, Community Involvement Specialist Local Governance Support Center Fort Defiance Agency March 25,2 009 “Essential Tools.
PDD Preparation Cairo, June 14 th -15 th, 2004 TIMS/EEAA CD4CDM- Third National Workshop (Phase II) UNEP RISO / APEXPDD Preparation Process and Format.
EAGLE INSIGHT “EXPERIENCE SPEAKS OF LESSONS LEARNED”
Common Carbon Metric for Measuring Energy Use & Reporting Greenhouse Gas Emissions from Building Operations A tool developed by GHG Protocol and UNEP-SBCI.
Monitoring and Evaluation in MCH Programs and Projects MCH in Developing Countries Feb 10, 2011.
CDM Project Developers Workshop.  Boundaries & Leakage  Calculating emissions reductions  Any other issues Session II.
Setting up an Internal Audit Program By
RECP AND ENTREPRENEUR DEVELOPMENT (FINANCING RECP IN EL SALVADOR) Yolanda Salazar de Tobar Executive Director NCPC EL SALVADOR.
1 By; L.M. Gambamala - Senior Statistician, National Bureau of Statistics, Tanzania PLANNING, EXECUTION AND ANALYSIS OF AGRICULTURAL CENSUSES – A TANZANIA.
School Finances for Finance Subcommittees School Councils.
Proposal for a Sino French cooperative project on CO2 evaluation of a THNS investment Jean-François JANIN French Ministry of Transport Claire BOUHOT RATP.
Capacity Development for CDM - RW4 Tunis, August Capacity Development for CDM General Description of the Project Cycle Tunis, August.
SUB-MODULE 5. MEANS OF VERIFICATION RESULTS BASED LOGICAL FRAMEWORK TRAINING Quality Assurance and Results Department (ORQR.2)
Movement on Noise Regulation – Alignment with R 51.03
Validation of Scenario Analysis and Control Group Baselines World Bank/PCF Workshop Delhi, Oct. 22, 2002 Trygve Roed-Larsen Det Norske Veritas (DNV)
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
Project Cycle Management for International Development Cooperation Indicators Teacher Pietro Celotti Università degli Studi di Macerata 16 December 2011.
The Next Stage for Results in Africa. Context 2005 Paris Declaration on Aid Effectiveness 2006 Mutual Learning Events Uganda & Burkina Faso 2007 Hanoi.
Performing Hospital Waste Audits Presented by Peggy Harlow, WM Healthcare Solutions, Inc. April 2, 2012.
GATEWAY INITIATIVE Hillsborough Community College Fall 2007 Preliminary Results A Formative Evaluation.
LULUCF CDM small-scale projects -Small-scale energy projects -Current draft text in SBSTA/2003/L.13 -Simplified procedures for energy projects -Potential.
Focused Review of Improvement Indicators A Self-Assessment Process SPP Stakeholder Meeting December 16, 2009.
1 Results-based Monitoring, Training Workshop, Windhoek, Results-based Monitoring Purpose and tasks Steps 1 to 5 of establishing a RbM.
Adult Education Assessment Policy Effective July 1 st, 2011.
HOW TO DESIGN & EVALUATE RESEARCH IN EDUCATION. PART 1 – Introduction to Research Chapter 1 - “The Nature of Educational Research”
Seite Hier steht ein thematisches Foto Demand side perspective on JI UNFCCC Side event on Joint Implementation Gertraud Wollansky Federal Ministry.
Monitoring and Evaluation in MCH Programs and Projects MCH in Developing Countries Feb 9, 2012.
Onsite Quarterly Meeting SIPP PIPs June 13, 2012 Presenter: Christy Hormann, LMSW, CPHQ Project Leader-PIP Team.
Some observations from chilean experience that could affect CDM methodologies by Alfonso Olea (TÜV- SÜD external auditor) APLE Consultores Chile.
CDM/JI in the Transport Sector Naoyuki Hasegawa Ministry of Land, Infrastructure and Transport, Japan
Registration and Profiling Haiti Inter-Cluster Meeting 10 February 2010.
We know HIS solutions work HIS success can be your success.
Lecture №4 METHODS OF RESEARCH. Method (Greek. methodos) - way of knowledge, the study of natural phenomena and social life. It is also a set of methods.
NAMA potential of Vietnam Vuong Xuan Hoa Institute of Meteorology, Hydrology and Environment Ministry of Natural Resources and Environment Climate Change.
CDM and Transport Dr. Jürg M. Grütter
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
APPLIED MARKETING STRATEGIES Lecture 14 MGT 681. Marketing Ecology Part 2.
Improved socio-economic services for a more social microfinance.
Make or Buy transport.
Clean Development Mechanism
Developing the Overall Audit Plan and Audit Program
Project Integration Management
Company Registration: Procedure that one needs to follow Company Registration: Procedure that one needs to follow
The Impact of Gender Difference Between Employees and their Management on Employee’s Job Satisfaction in Islamic Banking Sector in Kingdom of Bahrain Prepared.
EMIS. EDUCATION MANAGEMENT INFORMATION SYSTEM (EMIS)
Setting up an Internal Audit Program
دائرة الإحصاءات العامة
What is Project Cost Management?
USE OF PEMPAL KNOWLEDGE PRODUCTS
Project Integration Management
CDM Activity Cycle under the Marrakech Accords
Presentation transcript:

METHODOLOGY AM0031: BRT BOGOTÁ (COLOMBIA): TransMilenio PHASE II - IV MAIN PROBLEMS

METHODOLOGY AM0031: BRT BOGOTÁ (COLOMBIA): TransMilenio PHASE II - IV MAIN PROBLEMS METHODOLOGY: Substitution of data-intensive use that doesn't have an important impact in the outcomes of the project, for example: – Leakeages: Gathering data related to leakeages are tedious, demand time and money and do not greatly affect the outcome´s project. Normally the impact is less than 2%. –Maybe it is best to take a fixed value which is calculated once the baseline is established or to be eliminate this factor in the methodology. –Quantity and Frequency the surveys: Six surveys are performed each year with the objective of establishing the modal shift, trip distance and type of fuel for passenger cars of the passengers in the project. However the results showed that there are no changes over time (5 years of monitoring). –Therefore our recommendation is to review the possibility of reducing the surveys in the crediting period of the project or find other sources in the case of fuel for passenger cars.

METHODOLOGY AM0031: BRT BOGOTÁ (COLOMBIA): TransMilenio PHASE II - IV MAIN PROBLEMS METHODOLOGY: –Load Factor study: The methodology requieres that every three years a load factor study must be done, in order to establish any changes in the mobility conditions. These studies are usually expensive, requires special logistics and the results show that there are not significant changes in the occupation factors. This study should be done only when any kind of factor that may impact mobility conditions is identified.

OTHER PROBLEMS IN THE DEVELOPMENT OF THE CDM PROJECT METHODOLOGY DESIGNING STAGE: –Finding the correct advisor: We lost 2 years in the first stage, because, We selected expert developer company in CDM projects, but they were not experts in transport projects. Was necessary to contract a new developer. VALIDATION AND REGISTRATION STAGE: –This stage takes too much time in the approval. It is important to establish strategies to reduce times and frequency to summit the documents and forward the answers to observations. MONITORING STAGE: –In a project the large scale with different actors to provide information, the are a strong work to standardize the procedures and formats to collecting the information project. This required time and money.

OTHER PROBLEMS IN THE DEVELOPMENT OF THE CDM PROJECT VERIFICATION STAGE: –This stage requires to improve any things related to the DOE's service: Major availability, Shorter response times. Reasonable cost. (Rigth now is higher) knowledge and experience in the transport sector. Profiles in the auditor team.

THANK YOU VERY MUCH! contact: