Superfast BPM Processor Scheme and First Results Stephen Molloy, QMUL 2 nd Mini-Workshop for Nano-Project at ATF.

Slides:



Advertisements
Similar presentations
Design of Digital IIR Filter
Advertisements

ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
Kit Building Class Lesson 4Page 1 R and X in Series Inductors and capacitors resist the flow of AC. This property is called reactance. Resistance also.
P.N. Burrows ATF2 Project Meeting, KEK, 14/12/091 Feedback On Nanosecond Timescales Philip Burrows Glenn Christian Hamid Dabiri Khah Javier Resta Lopez.
Update of EXT Stripline BPM Electronics with LCLS-style Digital BPM Processors Glen White, with slides by Steve Smith 15 December 2009 ATF2.
Preliminary Results from HOM Measurements at the Tesla Test Facility (SLAC) Josef Frisch, Kirsten Hacker, Linda Hendrickson, Justin May, Douglas McCormick,
COMMUNICATION SYSTEM EECB353 Chapter 2 Part IV AMPLITUDE MODULATION Dept of Electrical Engineering Universiti Tenaga Nasional.
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
Progress towards nanometre-level beam stabilisation at ATF2 N. Blaskovic, D. R. Bett, P. N. Burrows, G. B. Christian, C. Perry John Adams Institute, University.
Experiment 17 A Differentiator Circuit
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
High Resolution Cavity BPM for ILC final focal system (IP-BPM) ILC2007/LCWS 2007 BDS, 2007/6/1 The University of Tokyo, KEK, Tohoku Gakuin University,
Feedback on Nanosecond Timescales (FONT) - Review of Feedback Prototype Tests at ATF(KEK) Glenn Christian John Adams Institute, Oxford for FONT collaboration.
1 FONT Results 2010 Philip Burrows Robert Apsimon, Doug Bett, Glenn Christian Michael Davis, Colin Perry, Javier Resta Lopez John Adams Institute Oxford.
Analogue BPM data analysis Calibration & resolution results.
M.Gasior, CERN-BE-BIBE-KT Innovation Day, 3 June Base Band Tune (BBQ) measurement systems - observing beam oscillations with sub-micrometre amplitudes.
NLC Intra-Pulse Fast Feedback Simon Jolly Oxford University NLC Beam Delivery Meeting July 2001.
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
Copyright © 2011 by Denny Lin1 Computer Music Synthesis Chapter 6 Based on “Excerpt from Designing Sound” by Andy Farnell Slides by Denny Lin.
IP-BPM status Siwon Jang KNU. Contents The electronics repair status –Repair work status –Electronics RF test (by using Oscilloscope) –Electronics shipment.
Marc Ross Saturday, June 5, 2004 nanometer BPM status and plans.
Magnet Motion Produces Luminosity Loss. NLC Feedback Operation Kicker Gain Bunch Charge Measure deflected bunches with BPM and kick other beam to eliminate.
Development of a Low-latency, High-precision, Intra-train Beam Feedback System Based on Cavity Beam Position Monitors N. Blaskovic Kraljevic, D. R. Bett,
Philip Burrows ATF 15/03/05 FONT Group Progress + Plans 2005 Philip Burrows, Christine Clarke, Glenn Christian, Hamid Dabiri Khah, Stephen Molloy, Glen.
Future FONT BPM Processors C.Perry 25 June Types of Processor Two types of processor: a) present mixer type b) baseband type Both will be made because:
IP BPM Shift Report FONT Meeting: 22 December 2014 Talitha Bromwich.
1 FONT R&D status Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford University.
FONT Hardware Processing electronics and current beam tests Stephen Molloy Queen Mary, University of London.
Philip Burrows ATF2 project meeting 14/1/111 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.
Production and Installation Policy of IP-BPM ATF2 Project Meeting, 2006/12/18 Y. Honda, Y. Inoue, T. Hino, T. Nakamura.
1 H. Hayano ATF Status June/2004 H. Hayano ATF: emittance status beam study status plan nm-project collaboration & plan ATF review 6/17/2004.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
Passive filters A frequency selective circuit, or filter, enables signals at certain frequencies to reach the output, and it attenuates (weaken or lessen.
1 ATF 2 Nanobpm (Q BPM) Electronics. Mark Slater: Cambridge Yury Kolomensky, Toyoko Orimoto: UCB Stewart Boogert, Steve Malton, Alexi Liapine: UCL Mike.
1 Fast kicker study Machine Time 2011/10/18~10/29(2 weeks) TB meeting 2011/01/14 T.Naito.
NLC - The Next Linear Collider Project Nano beams in the ATF extraction line Marc Ross Linear collider challenges: Energy Emittance source Stability ATF.
N. BlaskovicFONT Meeting1 ATF November 2013 shift plan N. Blaskovic.
Philip Burrows ATF2 project meeting 1/07/101 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.
Jitter Monitor – Overview and Status Report Glenn Christian, Alexander Kalinin 30 May 2005.
Cavity BPM: Multi-bunch analysis N Joshi, S Boogert, A Lyapin, F. Cullinan, et al. Royal Holloway University of London,
FONT GROUP MEETING ATF JUNE SUMMARY Neven & Talitha Talitha Bromwich - Friday, 26 June 2015.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
Low-Q IP BPM Y. I. Kim *, A. Heo, E-S. Kim (KNU) S. T. Boogert (JAI) D. M. McCormick, J. May, J. Nelson, T. Smith, G. R. White (SLAC) Y. Honda, N. Terunuma,
Development of a High Resolution Cavity BPM for the CLIC Main Beam
1 IP FB tests at ATF2 Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford.
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
NLC - The Next Linear Collider Project Intra-Pulse Feedback at the NLC Interaction Point Steve Smith SLAC Snowmass 2001.
LCLS Digital BPM Processor for ATF2 Extraction Line BPMs Steve Smith 26 August 2009.
Chapter 5 Active Filter By En. Rosemizi Bin Abd Rahim EMT212 – Analog Electronic II.
FONT4 Status Report Glenn Christian John Adams Institute, Oxford for FONT collaboration.
1 FONT IP FB Philip Burrows Robert Apsimon, Doug Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Colin Perry John Adams Institute Oxford University.
Path Length Difference Study R. Apsimon. Assumptions Assume input signals vary sinusoidally (good approximation after BPF). Input signal arrives at a.
Superfast BPM Processor Scheme Stephen Molloy, QMUL Nano-Project Mini-Workshop at ATF.
Dither Luminosity feedback versus Fast IP feedback
Alternative BPM Processing Scheme – May08 Demo
ALPS SPS BPM Read-out Electronics RF Front-end – revised
Progress towards nanometre beam stabilisation at ATF2
> 50 dB ≤ 500 MHz Non-intercepting beam position measurement
Intra-Pulse Beam-Beam Scans at the NLC IP
Progress towards nanometre level beam stabilisation
Bunch Tiltmeter Steve Smith SLAC Snowmass July 16, 2001 Update date
NanoBPM Status and Multibunch Mark Slater, Cambridge University
Beam Current Monitoring with ICT and BPM Electronics
Feed forward orbit corrections for the CLIC RTML
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
VELA BPMs Alex Brynes.
SuperB Linac Beam Position Monitor
SuperB Linac VME Beam Position Monitor
Breakout Session SC3 – Undulator
Presentation transcript:

Superfast BPM Processor Scheme and First Results Stephen Molloy, QMUL 2 nd Mini-Workshop for Nano-Project at ATF

FONT at ATF Micron-level stabilisation of the ATF extraction line beam. Measure position of start of train, and correct the end. –To be accomplished within 56ns train. –Latency must be kept low. BPM processor should work in <5ns.

Processor Design Obtain difference from hybrid and mix with 714MHz from ATF control system. Low-pass filter with 200MHz cutoff –5-pole Chebyshev chosen due to low latency, and strong out of band fall-off.

Issues Non-zero hybrid isolation causes zero-offset. –BPM centre can be moved with variable attenuation if necessary. Stripline -> hybrid cables must be matched in time to better than ~50ps. –This is possible, and has been achieved. 714MHz LO input to the mixer should be very phase stable with respect to the beam. A lot of power at the beam bunching frequency. –Low-pass filter must limit this to a very small value before signal reaches feedback amplifier.

Phase Stability of 714MHz

Simulated Output - 100μm

Comments Positive points –Simulated output is linear with beam position. –Hybrid common-mode residual shifts BPM centre in a predictable way. –Imperfect cable lengths (within achievable limits) merely shift BPM centre. –Mixer leakage easily reduced by low-pass filter. Potential problems –Relatively large amount of power at beam bunching frequency remains after low-pass filter. –Predicted latency of entire system is ~6ns. Remember latency should be <5ns for feedback experiment.

Alternative Filtering 3 or 4-pole Bessel band-pass filter before mixer. –Centred at 714MHz, bandwidth ~400MHz. –Reduces 357MHz entering mixer. –Reduces out of band power entering mixer, thus increasing dynamic range of BPM. Less 357MHz means low-pass filter requirements are relaxed. –Less poles results in faster filter. –3-pole Chebyshev with ~170MHz cut-off. –Total latency should be equal to or less than the previous scheme as the band-pass poles have a larger bandwidth than the low-pass poles

Simulated Response of 3-pole Bessel BPF

Simulated Output - 100μm

Simulated Output - 1μm

Comments 357MHz beam bunching is not observed. Power at 714MHz –Due to mixer leakage. –Level equivalent to DC output when beam has 1μm displacement. Predicted latency ~4.5ns –Longer by ~0.5ns when 4-pole band-pass filter is used.

Recent Beam Tests Single bunch tests –Verified cable lengths were correct. –Stepped through each component in turn and verified signal. –Found correct LO phase. –Verified output was correlated with beam position. –Measured latency.

Recent Beam Tests Multi-bunch tests –Calibrated each of three processors using corrector magnets. –Recorded many extraction pulses to measure resolution.

Reminder!

Single Bunch - Raw Signals

Single Bunch - After hybrid

Single Bunch - After Band-Pass Filter

Single Bunch – After Mixer

Single Bunch – Final Difference Output

Single Bunch - Corrector Sweep

Latency Measurement Triggered the scope with a sum signal. Recorded raw stripline signal, and final output of processor. Results –3-pole band pass scheme – ns –4-pole band pass scheme – ns –No band pass, 5-pole low pass – ns

Multibunch – 3-pole band-pass filter

Multibunch – 4-pole band-pass filter

Multibunch – No bandpass, 5-pole lowpass

Calibration Run – BPM13

Bunch charge during Dec 9 th shift