H-Jet polarimeter status report Yousef Makdisi RSC 07/28/06.

Slides:



Advertisements
Similar presentations
H-Jet polarimeter status report Yousef Makdisi RSC 09/29/06 BNL: A. Bravar, G. Bunce, R. Gill, Z. Li. A. Khodinov, A. Kponou, Y. Makdisi, W. Meng, A. Nass,
Advertisements

E.C. Aschenauer Phil Pile Meeting 2012/03/202 polarisation at injection Blue and Yellow Caveat: only first round of cleaning up noise in polarimeters.
Yousef I. Makdisi EIC Meeting Dec 7-8, 2007 Polarized Proton/ Hadron Polarimetry With heavily reliance on the PSTP and RSC presentations K. Boyle, C. Camacho,
Linda R. Coney – 24th April 2009 Online Reconstruction & a little about Online Monitoring Linda R. Coney 18 August, 2009.
Andrei Nomerotski 1 CPC2 and Electron Microscopy A.Nomerotski 7//9/2007  Worldwide efforts to develop sensors for keV electrons for Transmission.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 5 Apr 2011 Agenda: Open.
PC polarimeter at RHIC. Status and performance. S. Bravar, G. Bunce +, R. Gill, H. Huang, Y. Makdisi, A. Nass, A. Zelensky: Brookhaven National Laboratory,
Yousef Makdisi PSTP2011 September 12-18, 2011 Proton Polarimetry at the Relativistic Heavy Ion Collider and Future Upgrades Yousef I. Makdisi Brookhaven.
The polarized hydrogen jet target measurements at RHIC Andrei Poblaguev Brookhaven National Laboratory The RHIC/AGS Polarimetry Group: I. Alekseev, E.
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
Polarimetry of Proton Beams at RHIC A.Bazilevsky Summer Students Lectures June 17, 2010.
DIS 2006 Tsukuba, April 21, 2006 Alessandro Bravar Proton Polarimetry at RHIC Alekseev, A. Bravar, G. Bunce, S. Dhawan, R. Gill, W. Haeberli, H. Huang,
1 SSD status report – 16 July 2004 Jerome Baudot, Strasbourg STAR Collaboration Meeting BNL, 16 July 2004 Silicon Strip Detector status report  Report.
E.C. Aschenauer RSC-Meeting, January 21st T h e b e s t k e p t s e c r e t n u m b e r a t R H I C / B N L / U S A f o r s u r e n o t t o b e.
Absolute polarimetry at RHIC Hiromi Okada (BNL) I. Alekseev, A. Bravar, G. Bunce, S. Dhawan, O. Eyser, R. Gill, W. Haeberli, O. Jinnouchi, A. Khodinov,
Preparation for RHIC PP Run in 2011 Wednesday 20, 2010 RHIC Machine Planning Meeting Haixin Huang RUN website: RUN.
Systematic Errors Studies in the RHIC/AGS Proton-Carbon CNI Polarimeters Andrei Poblaguev Brookhaven National Laboratory The RHIC/AGS Polarimetry Group:
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
C. Fischer – LHC Instrumentation Review – 19-20/11/2001 Gas Monitors for Transverse Distribution Studies in the LHC LHC Instrumentation Review Workshop.
Polarized beam in RHIC in Run Polarimetry at RHIC A.Zelenski, BNL PSTP 2011, September 13, St.Petersburg.
K.O. Eyser --- Absolute Polarization Measurement at RHIC in the Coulomb Nuclear Interference Region -1- Absolute Polarization Measurement at RHIC in the.
Relative Polarization Measurements of Proton Beams Using Thin Carbon Targets at RHIC Grant Webb Brookhaven National Laboratory Sept 14, 2015PSTP20151 for.
» Absolute Polarimetry of Proton Beams at RHIC« Oleg Eyser for the RHIC Polarimetry Group International Workshop on Polarized Sources, Targets and Polarimetry.
MICE TARGET OPERATION C. Booth, P. Hodgson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 – The MICE Experiment2 - The.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 12 Apr 2011 Agenda: Open.
OPPIS performances in Run-6. First 4 weeks. RSC meeting, February 10, 2006.
» RHIC Polarimetry « Oleg Eyser for the RHIC Polarimetry Group 2014 RHIC Retreat, August 14.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Mar 2011 Agenda: Status – cryo/budget Experiment priorities.
Proton Polarimetry at RHIC K. Oleg Eyser for the CNI polarimeter group Newport News, VA, October 25, 2013.
28-May-2008Non-linear Beam Dynamics WS1 On Injection Beam Loss at the SPring-8 Storage Ring Masaru TAKAO & J. Schimizu, K. Soutome, and H. Tanaka JASRI.
Polarized proton projections Wolfram Fischer 11 May 2012 RHIC Spin Collaboration Meeting BNL.
RHIC Run11 Summary May 6, 2011 RSC Meeting Haixin Huang Luminosity Availability Polarization RHIC setup issues.
Yousef I. Makdisi DIS03 St. Petersburg April 24,2003 Polarized Jet target status The overall view The Dissociator stage The Atomic Beam stage The RF transitions.
Run6 CNI Analysis: Concluding Remarks and Summary of Systematic Uncertainties A.Bazilevsky For RHIC CNI group RHIC Spin Collaboration Meeting November.
A. Nass, M. Chapman, D. Graham, W. Haeberli,
CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 1/15 Jeroen van Tilburg (Universität Zürich) LHCb: Preparation for LHC.
E.C. Aschenauer STAR Spin PWG 2012/03/222  Known complications:  100 GeV: o noise due to pickup especially at injection less significant at flat top.
RHIC CNI Polarimeter status RHIC CNI Group February 26, 2008.
Collection of Photoelectrons from a CsI Photocathode in Triple GEM Detectors C. Woody B.Azmuon 1, A Caccavano 1, Z.Citron 2, M.Durham 2, T.Hemmick 2, J.Kamin.
Update on the CNI polarimeter results for Run02 1.Bunch-by-bunch polarization study 2.Profiles of 0-pol bunches Osamu Jinnouchi.
Thomas Roser Snowmass 2001 June 30 - July 21, 2001 Proton Polarimetry Proton polarimeter reactions RHIC polarimeters.
Electron Spectrometer: Status July 14 Simon Jolly, Lawrence Deacon 1 st July 2014.
Absolute Polarization Measurement at RHIC in the Coulomb Nuclear Interference Region September 30, 2006 RHIC Spin Collaboration Meeting RIKEN, Wako, Japan.
1 Data taking & ONLINE analysis at MCR Hiromi Okada June, 2008.
What is the time estimated to change the energy and re-establish stable operation by steps of ~1% (threshold scan), a few%, or more than 10%? Comments.
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
RHIC pC polarimeter what has been achieved and what needs to be done Osamu Jinnouchi RBRC 2/10/05 RSC meeting.
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
Haixin Huang AGS Cold Snake: Status and Plans.
E.C. Aschenauer RSC - Meeting 2012/03/232  Known complications:  100 GeV: o noise due to pickup especially at injection less significant at flat top.
RHIC pC Polarimeters in Run9: Performance and Issues A.Bazilevsky for the RHIC CNI Group Polarimetry Worshop BNL, July 31, 2009.
CNI polarizations in Run09: Summary A.Bazilevsky For the RHIC CNI Group March 26, 2010 RSC meeting.
10/3/2003Andreas Jansson - Tevatron IPM review1 Tevatron IPM Proposed design.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Jun 2011 Agenda: √s = 200 GeV AuAu progress ZDC Calibration for AnDY – the plan Request from AnDY √s = 27 GeV.
H-jet Run at Injection A. Dion, H. Huang, A. Poblaguev, A. Zelenski, and YM.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 22 Mar 2011 Agenda: Open.
Mitglied der Helmholtz-Gemeinschaft Summary of the target session of the IEB Workshop June 19, 2015 | Alexander Nass.
1 Front End – present status David Neuffer December 4, 2014.
RHIC pC Polarimeter status A.Bazilevsky For RHIC CNI Group February 26, 2008.
RHIC Status Haixin Huang Time Meeting 01/25/2011.
Polarized Proton Acceleration in the AGS with Two Helical Partial Snakes October 2, 2006 SPIN 2006 H. Huang, L.A. Ahrens, M. Bai, A. Bravar, K. Brown,
First collisions in LHC
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
SNS Operational History
Summary Friday h38: Ramp down and pre-cycle.
LHC Morning Meeting - G. Arduini
Friday h55 Stable beams. Fill #1841. Lumi ~1.2e33.
MEIC New Baseline: Luminosity Performance and Upgrade Path
Wednesday 6.10 Morning: Quench test at 450 GeV
Presentation transcript:

H-Jet polarimeter status report Yousef Makdisi RSC 07/28/06

Jet operations in `06 Igor and Dima provided the new code to readout the full waveform and monitoring program. Ron provided the daily PC technical support and monitoring. Anatoli and Yousef, the daily jet oversight and maintenance (a long haul but only 3 midnight calls) T. Wise came to the rescue of the SFT unit. MCR Operations took full responsibility and saw to it that data were collected in each fill.

Waveforms (new H-Jet data format this year) Fit Half maximum Baseline = 8

Overall Picture and Cuts

Snap shot of online Monitoring

Strips after the loss of detector 3

Energy Distributions

Click on Info

Data 100 GeV FillsDatesBeamEvents /18-25B2.5M /26-4/4Y2.8M /4-11B1.6M 4/11 Lost Si detector # /12-5/2Y3.8M /3-15B4.2M /19-6/1Y2.5M 6/2 Si detector acted up: reduced the bias from 200 – 175 V /3-5B2.0M

Data Collected at 31.2 GeV FillsDatesBeamEvents /9-17B3.6M /18-20Y2.6M

Data Analysis The `05 data is being analyzed by Oleg. Hiromi will complete the 24 GeV analysis for data taken in `04. This represents the first look at injection albeit with low statistics. The 31.2 GeV data provides a good statistical sample taken in conjunction with the polarimeters. It is closest to calibration at injection. (No one??) The 100 GeV `06 is waiting for a good volunteer. The change in the DAQ to readout the full WFD waveform (Dima) does not allow the use of the old analysis programs. Igor wrote the online analysis and monitoring program which could be used as a first step.

Raw asymmetries

Beam polarization

Comparison with pC-polarimeters

Operational issues Nozzle blockage frequency: every days. It takes 3 hours to warm up, ½ hour beam down, and two hours to cool down and back online. Slower intensity ramp up than before. 3-4 days to reach full intensity, plateau for a few days and then a slow decrease to blockage. Midway replaced the nozzle which improved matters somewhat. The SFT phase became unstable for a period. Fixed by T. Wise by increasing the gain. Lost some precious time due to memory full condition. Lost one silicon detector, and another acted up.

Operations continued Failed to take data with two beams at the same time: a)Requirement that the two beams be separated by 4-6 mm. b)The vertical collimation occluded the silicon acceptance. Determined no polarization loss with 112 bunch operation and p/bunch implying the holding field uniformity is adequate. Installed a CCD camera to look at light emitted as the beam hits the jet. This serves as another vertical beam emittance device. Our interest is to measure the molecular hydrogen contamination. No pump failure this run.

What is next? Determine the cause of the silicon failure. Replace the failed detectors with existing spares. Start discussion with Hamamatsu to purchase new detectors. Purchase spare WFD components. Will attempt to open up the vertical collimation to allow simultaneous two-beam measurement. Wisconsin is building two RF cavities to allow a polarized deuteron jet beam. Attempt to improve the jet vacuum to keep it on the beam line during Au-Au running.