Transmission Rights. The Markets EnergyForwardTransmissionRightsAncillaryServices Must Run Contracts Energy OperatingReserveCapacityReserve Procurement.

Slides:



Advertisements
Similar presentations
Secondary Market with Transmission Capacities ČEPS, a.s. 11/2006.
Advertisements

MISO Day 2: A Transmission Users (Marketers) Perspective Leon White August 8, 2007.
2000, Independent Electricity Market Operator All Rights Reserved 1.
Standard Market Design (SMD) in New England Federal Energy Regulation Commission Conference on Standard Market Design January 22, 2002 David LaPlante Vice.
Enhanced Day Ahead Commitment Project: Enhancements to the DACP IESOTP 244-3d.
SEPTEMBER 12, 2012 | MARKETS COMMITTEE Aleks Mitreski MARKET DEVELOPMENT (413) Hourly Offer and Intraday.
Congestion Management Settlement Credits December, 2002.
IJT Transaction Timelines and Scheduling – NISL and CMSC.
Intertie Restoration Update September 15, Intertie Restoration Recommendation Paper Expected to be released by the end of September Will be released.
Copyright 2003 PJM 1 PJM’s Annual FTR Auction.
Technical Conference Avoided Cost Modeling January 6, 2015.
Highlights of the 2004 State of the Market Report New York Electricity Markets David B. Patton, Ph.D. Potomac Economics Independent Market Advisor May.
Demand Response in New York State Northwest Power and Conservation Council DR workshop February 24, 2006.
Ramping and CMSC (Congestion Management Settlement Credit) payments.
Resource Adequacy in PJM
9/22/00 1 Jerry W. Smith. 9/22/00 2 Jerry W. Smith.
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
EIUG – Wheeling Methodologies
Utility Regulation March 10, 2011 Raj Addepalli Deputy Director, Electric, Office of Electric,Gas and Water New York State Department of Public Service.
Market Overview in Electric Power Systems Market Structure and Operation Introduction Market Overview Market Overview in Electric Power Systems Mohammad.
1 WHOLESALE ELECTRICITY MARKET DESIGN AND STRUCTURE Massimo Parati Market Department Italian Regulatory Authority for Electricity and Gas Milan, March.
Overview of LMP Markets Features of ISOs / RTOs David Withrow Senior Market Economist Fall 2007 Meeting of the NARUC Staff Subcommittee on Accounting and.
Demand Response in MISO Markets NASUCA Panel on DR November 12, 2012.
International Swaps & Derivatives Association Transforming the Derivatives Business The Emerging Ontario Electricity Market July 11, Meg Timberg.
IMO Market Evolution Program Drew Phillips Market Evolution Program
Nodal Pricing in an LMP Energy Market
Economic Demand Response Sheldon Fulton Executive Director, IPCAA November 4, 2008.
Capacity Trades. Rules and Regulations Exchange rules must comply with a Contract on Accession to Wholesale Power Market’s Trading System Exchange commodity:
ERCOT Tool to manage unexpected incremental load November 16, 2006.
Welcome New York Independent System Operator. (Pre-NYISO) Regulated Market Physical contracts Regulated industry Cost Based System Two Party Deals Bundled.
(C) NordPool1 The Nordic Power Market Zonal Pricing Jan Vidar Thoresen Managing Director Nord Pool Consulting AS.
Overview of the North American and Canadian Markets 2008 APEX Conference in Sydney, Australia October 13, 2008 Hung-po Chao Director, Market Strategy and.
For discussion purposes only Financial Transmission Rights: Design options Presentation to Electricity Commission 2 September 2009.
Day Ahead Market Working Group March 31, Agenda Review minutes - March 24 Coral Proposal - Working Group Discussion Loads/LDCs and DAM.
1 Market Evolution Program Regulatory Affairs Standing Committee Meeting September 11, 2003.
Proposed CMSC Amendments - Imports & Exports Intertie Trading Sub-committee November 24, 2003 PUBLIC.
Ontario Electricity Supply Forum PEO Mississauga Chapter - September 6, 2007 Rhonda Wright-Hilbig, P.Eng Market Analysis - IESO.
Bulk Power Transmission System
CRR Auction Scope John Moseley. To outline aspects of the CRR market process to assure that these proposed CRR market protocols (as interpreted by ERCOT.
The Ontario Electricity Market 1 Year in Richard Penn Mgr - Market Assessment The IMO Richard Penn Mgr - Market Assessment The IMO.
Day Ahead Market Working Group April 14, Agenda Discussion of SMD-style DAM review questions posed by the DAM WG and Coral regarding the SMD-
System Operation Changes – Interaction with ELEXON APEx Conference: Leipzig October 2004.
Market Evolution Program Day Ahead Market Project How the DSO Calculates Nodal Prices DAMWG October 20, 2003.
1 Electricity System and Energy Market Basics David J. Lawrence Manager, Auxiliary Market Products Prepared for: RGGI I&L Workshop June 15, 2006.
Day Ahead Market Working Group April 7, Agenda March 31 minutes DAM Feasibility Study - Questions? Coral Proposal - Discussion Generators and.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
Hour Ahead Dispatchable Loads Applicable Updates to Procedures Presentation to the Market Operations Standing Committee April 23, 2003
Lead from the front Texas Nodal 1 Texas Nodal Congestion Revenue Rights (CRR) EDS 3 Release 7 - Overview EDS 3 Phase 2 MP Planning.
PJM© Demand Response in PJM 2009 NASUCA Mid-Year Meeting June 30, 2009 Boston, MA Panel: Price Responsive Demand – A Long-Term Bargain.
1 Pacific Northwest Hydro-Thermal System and RTO West Market Design FERC Market Design Workshop January 23, 2002.
©2005 PJM 1 APEx The Mature PJM Market Kenneth W. Laughlin PJM October 31, 2005 Orlando, FL.
Transmission Congestion Rights – Credit Perspective April 17, 2014.
FURTHER INFORMATION ON MISO FTR AUCTIONS For SPP RSC Discussion October 6, 2010.
DAM Design Issues - Participants & Obligations May 12, 2003 Market Evolution Program.
SOUTHERN CALIFORNIA EDISON SM Southern California Edison Company’s Proposal to Participate in Convergence Bidding August 23, 2010.
Illinois Wholesale Market Update December 10, 2003.
1 Tracking Electricity Imports David J. Lawrence Manager, Auxiliary Market Products Prepared for: RGGI I&L Workshop June 15, 2006.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
2% Shift Factor dispatchable rule discussion and alternatives for the 2% rule Kris Dixit 1.
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
Jul 23, 2003Market Operations Standing Committee of the IMO1 Market Pricing Issues Update John MacKenzie.
Joint Energy Auction Implementation Proposal of PG&E, SCE and SDG&E California Public Utilities Commission Workshop – November 1, 2006.
OASIS II Stage 1 Requirements Joint OASISII Implementation Task Force Paul R. Sorenson November 17, 2004.
Consolidated EIM Initiatives from 2017 Roadmap Issue Paper
John Dumas Director, Wholesale Market Operations
OASIS II Stage 1 Requirements Joint OASISII Implementation Task Force Paul R. Sorenson November 17, 2004.
ESC Use Case Review Joint OASIS Implementation Task Force Paul R
Market Pricing Initiatives Update September 9th, 2003
Update on Market Trials
Presentation transcript:

Transmission Rights

The Markets EnergyForwardTransmissionRightsAncillaryServices Must Run Contracts Energy OperatingReserveCapacityReserve Procurement Financial Real-time Physical IMO - Administered Markets

Participant The company or organization that is authorized to participate in the Financial Transmission Rights Market E.g., Company Light-Bright

Users Users: The various people within a member company that are authorized to participate in auctions on behalf of their company. JoeJoe GregGreg MikeMike KimKim From Company Light-Bright

Ontario Manitoba Michigan Quebec New York Minnesota Interconnection Features

Congestion Occurs when physical capability of the transmission system cannot meet market requirements

Ontario New York NYIntertieZone Ontario Proxy Bus External Market (New York Example) IMO-Administered Markets Import of Energy Into Ontario Transfer of MWs from one market to the other is achieved when both markets are navigated successfully MWs Imported to Ontario MWs Exported from New York

Intertie Zone MCP: Offers/No Congestion MCP = 16 Ontario Import Scheduling Limit $10 $22 $14 $12 Intertie Zone $10 $16 $14 $12 $22 $24

Intertie Zone MCP: Offers/Congestion Ontario MCP = 16 Ontario Import Scheduling Limit $10 $22 $14 $12 Intertie Zone $10 $16 $14 $12 $22 $24 Intertie Zone MCP no congestion 16 - no congestion

Intertie Zone MCP: Bids/No Congestion Ontario Scheduling Limit 400 Mw $10 $1000 $500 $12 Intertie Zone $10 $16 $14 $12 $500 $1000 Dispatchable Load Served Dispatchable Load Not Served Boundary Entity Load Not Served MCP = 16

Intertie Zone MCP: Bids/Congestion Ontario MCP = 16 Ontario Scheduling Limit Intertie Zone $10 $1000 $500 $12 $10 $16 $14 $12 $500 $1000 Intertie Zone MCP Dispatchable Load Served Dispatchable Load Not Served

Bids and Offers in Intertie Zones $10 $1000 $500 $12 $10 $16 $14 $12 $500 $100 $16 BidsOffers

Settlement Price for Withdrawals and Injections Zone PriceUniform Market Clearing Price in Ontario ICP Pre Dispatch Real TimeMCPICP + Intertie Energy Price -

Price ($/ MW ) () Quantity ( MW ) Real Time MCP Calculation Exports Primary Demand Fixed LoadDispatchable Load MMCP -MMCP MCP Dispatchable Generation Available to algorithm to optimize Imports Self- Scheduling Fixed Generation Exports Non Dispatchable Load

Time Structure Period of time for which transmission rights are being sold. Three components: Duration for which rights are valid Days of the week Hours of the day Period of time for which transmission rights are being sold. Three components: Duration for which rights are valid Days of the week Hours of the day

Time Structure - Business Rules Times are based on a 24 hour clock and are defined in “hour ending” units Times correspond to EST (throughout the year) Bids for portions of time within a time structure will not be not accepted. Times are based on a 24 hour clock and are defined in “hour ending” units Times correspond to EST (throughout the year) Bids for portions of time within a time structure will not be not accepted.

12 Hour 1 Hour Time Structure

Transmission Paths A transmission path specifies the injection and withdrawal zones for transmission and is designated by abbreviation pairs. ON - NY Ontario is the injection zone New York is the withdrawal zone

How Are FTRs Acquired? TransmissionRights Long-term TR Auctions Short-term

Long-term and Short-term TRs Month Mw Intertie upper limit forecast by IMO

Long-term and Short-term TRs Month Mw Intertie upper limit forecast by IMO Long Term TR Short Term TR

Long-term and Short-term TRs Month Mw Intertie upper limit forecast by IMO Short Term TR

Long-term and Short-term TRs Month LT 1 MW Intertie upper limit forecast by IMO

Long-term and Short-term TRs Month LT 2 LT 3 LT 4 LT 1 MW ST

Long-term and Short-term TRs Month MW ST

Long-term and Short-term TRs Month MW ST

Rounds A round is an attempt to sell a product within an auction. Products can be sold in multiple attempts rather than all at once. Round 1 Round 2 Round 3 Auction: ST-May all hours all days

Round - Example Auction: ST- May all hours all days Total Power = 1000 MW 20% of total power sold Round Fraction = MW Remain 50% of remaining power sold Round Fraction = MW Remain 100% of remaining power sold Round Fraction = 1.00 No MW Remain Round 1 Round 2 Round 3 (Final)

Long Term Sub Auctions Month MW ST LT SA1

Long Term Sub Auctions Month MW ST LT SA1 ST

LT Sub Auctions and Rounds Month MW LT SA1 R1 LT SA1 R2 LT SA1 R3 ST

Bid A bid in the TR Auction System consists of three key pieces of information: Transmission Path Quantity Price/MW

How Are FTRs Acquired? TransmissionRights Financial Transmission Rights Financial Transmission Rights T.R. Long-term TR Auctions Short-term