PSD Permitting Process Nancy Mayer EPA OAQPS. 2 Topics Find technical resources for permit review Describe how permits are constructed Describe what to.

Slides:



Advertisements
Similar presentations
Chapter 4 Joint Problem Solving Brown Paper Company.
Advertisements

Richard (Rick) Goertz, P. E
Introduction to EIS/EA Managing the Environmental & Project Development Process Presented by the Ohio Dept. of Transportation.
Doug Solomon, U.S. EPA OAQPS 2014 National Air Quality Conference Durham, NC February 12, 2014.
1 Air Quality Impact Analysis and Other PSD Requirements Donald Law U.S. EPA Region 8.
Public Review vs “affected state” Review: advantages of TAS for section 505 Reviewing NSR and Title V Permits Natalene Cummings Forest County Potawatomi.
Best available control technology (BACT) requirements
Overview of the Tribal New Source Review (NSR) Rule U.S. Environmental Protection Agency Office of Air Quality Planning and Standards (OAQPS) Research.
Working with State and Federal Regulatory and Land Management Agencies Trent Wickman USDA Forest Service Eastern Region, Lakes States.
Tribal Benefits from State Implementation Plan (SIP) Process Involvement Rosanne Sanchez New Mexico Environment Department Air Quality Bureau.
Where to find Information About Facilities. Overview of Title V Permits.
1 WRAP Policy Fire Tracking Systems Draft December 9, 2002 FEJF Meeting December 10-11, 2002 Jackson, WY.
September 12, SW Colorado PSD Increment Study Southwest Colorado Nitrogen Dioxide ( NO 2 ) Prevention of Significant Deterioration (PSD) Increment.
Oil and Gas Workgroup Summary October 21-23, 2009 Denver.
What is the purpose of the Class I Redesignation Guidance? Provides guidance for tribes who are considering redesignating their areas as Class I areas.
CHAPTER 3 SCOPING AND AGENCY COORDINATION. Scoping - the procedure for determining the appropriate level of study of a proposed project/activity - process.
CANDACE CARRAWAY OFFICE OF AIR QUALITY PLANNING AND STANDARDS US EPA JUNE 2013 General Permits and Permits by Rule 1.
Recent Developments in Transportation Conformity Beverly Chenausky Multimodal Planning Division – Air Quality Breakout Session: Transportation Conformity/Air.
Distinguishing: Clean Air Act, EPA Rules, Regulations and Guidance David Cole U.S. EPA, OAQPS Research Triangle Park, NC.
Title V Operating Permit Program 1 Section 1: Intro to Title V Laura McKelvey U.S. EPA.
EPA’s DRAFT SIP and MODELING GUIDANCE Ian Cohen EPA Region 1 December 8, 2011.
New Source Review (NSR) Prevention of Significant Deterioration (PSD): Refinement of Increment Modeling Procedures Proposal Jessica Montañez.
Clean Air Act and New Source Review Permits EPA Office of Air Quality Planning and Standards Research Triangle Park NC March
Development of 24-Hour 2006 PM 2.5 Designations Guidance NTAA National Tribal Air Quality Forum Barbara Driscoll EPA, OAQPS April 17, 2007.
1 Public Involvement, Access, and Petitions DJ Law EPA Region 8.
Regulatory Requirements For Modeling. Air Quality Model Estimates Developing Air Pollution Control Plans Assessment of Environmental Impacts Projecting.
Title V Operating Permits: A Compliance and Enforcement Tool Candace Carraway US Environmental Protection Agency Office of Air Quality Planning and Standards.
Jessica Montanez Environmental Protection Agency NEW SOURCE REVIEW (NSR) PROGRAM.
1 Non-Attainment NSR Program Donald Law EPA Region 8.
WESTAR 2003 Fall Technical Conference on PSD Increment Tracking & Cumulative Effects Modeling Seattle, Washington Conducting Class I Area Increment Analyses.
PSD/Nonattainment Review You can do this! Marc Sturdivant Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2015.
Life After Class I Natalene Cummings Air Program Director Forest County Potawatomi NTF 2011.
New Source Review Rules Update Jessica Montanez U.S. Environmental Protection Agency Office of Air Quality Planning and Standards Air Quality Policy Division.
How to get Tribal Permitting Authority: Options and Procedures Nancy Mayer U.S. EPA OAQPS.
1 Modeling Under PSD Air quality models (screening and refined) are used in various ways under the PSD program. Step 1: Significant Impact Analysis –Use.
Permitting and National Ambient Air Quality Standards Changes Rick Goertz, P.E. Air Permits Division Texas Commission on Environmental Quality Advanced.
Current State Issues in Title V Permitting Matthew A. Paque Environmental Attorney Supervisor Oklahoma Department of Environmental Quality Office of General.
Carrie Paige – EPA Region 6, Dallas David Cole – EPA OAQPS, RTP, NC Introduction to Air Permits Introduction to Air Permits.
Greenhouse Gas Permitting Sean O’Brien Air Permits Division Texas Commission on Environmental Quality Advanced Air Permitting Seminar 2015.
Class I Overview EPA Class I determination. Basics regarding how Class I works. Importance of Tribal Class I status. EPA’s Handling of Michigan’s objections.
Class I Air Quality Related Values Kevin J. Finto Hunton & Williams APPA Energy and Air Quality Task Force Washington, D.C. March 10, 2005.
Exceptional Events and Fire Policy Presented by Don Hodge, U.S. EPA Region 9 Interagency Air and Smoke Council meeting May 2, 2012 Disclaimer: Positions.
How Tribes Can Influence State Title V Permits Virgil Frazier Southern Ute Indian Tribe Virgil Frazier Southern Ute Indian Tribe.
Resource Management Planning Air Quality Brock LeBaron Department of Environmental Quality Division of Air Quality
Clean Air Act The law that defines EPA's responsibilities for protecting and improving the nation's air quality and the stratospheric ozone layer. Draft.
TAS and TIP Swinomish Tribe and the Incremental Approach.
Nonattainment New Source Review (NA NSR) Program Raj Rao US Environmental Protection Agency Office of Air Quality Planning and Standards ,
OAQPS Update WESTAR April 3,  On March 12, 2008, EPA significantly strengthened the National Ambient Air Quality Standards (NAAQS) for ground-level.
308 Outline (a) Purpose (b) When are 1st plans due (c) Options for regional planning (d) Core requirements (e) BART requirements (f) Comprehensive periodic.
New Ozone NAAQS Impacts: What Happens Next with a Lower O3 Standard? Nonattainment Designation and Industry’s Opportunity to Participate New Ozone NAAQS.
Air Modeling Updates 2015 Region 4 Grants/Planning Meeting May 19-21, 2015 Atlanta, Georgia 1.
EPA Region 10 Cumulative Effects Analysis Methodology Development Rob Wilson and Herman Wong WESTAR Fall Technical Conference September 16, 2003.
Developing a Tribal Implementation Plan
National Ambient Air Quality Standards (NAAQS)
New Source Review (NSR) Program Basics
Preparing for Permit Review
WESTAR Increment Recommendations
Draft Modeling Protocol for PM2.5
Interim Air Quality Policy on Wildland and Prescribed Fires
Nonattainment NSR Permitting Process
Overview of New Source Review (NSR)
Major New Source Review (NSR) Part 2
PSD Issues in PM2.5 Transition Proposal
Designations for Indian Country
Class I Redesignations
How to get Tribal Permitting Authority
Exceptional and Natural Events Rulemaking
National Ambient Air Quality Standards (NAAQS) Part 5: NAAQS and NSR
Sulfur Dioxide 1-Hour NAAQS Implementation
Uinta Basin General Conformity
Presentation transcript:

PSD Permitting Process Nancy Mayer EPA OAQPS

2 Topics Find technical resources for permit review Describe how permits are constructed Describe what to look for when reviewing a permit

3 Useful Areas of Expertise Air pollution modeling Air pollution control – Equipment – Practices Law

4 Typical Permit Format General source identification Source location Emissions information Control technology analysis - BACT – Top-down approach Air Quality Impact Analysis

5 General Source Information Name Source classification – – On list to count fugitive emissions? Generally what construction/modification is being proposed – Reason for construction

6 Source ID–what to look for Is source classification correct? Does reason for modification make sense?

7 Source Location Location – Attainment/nonattainment area – Nearby class I areas Source site diagram

8 Source location–what to look for Is location accurate? Does permit ID all Class I areas and tribal lands within 100 KM? Does it ID all nearby nonattainment areas? Does site diagram clearly explain what is being proposed? Unexplained buildings in diagram?

9 Emissions Data Existing emissions baseline Change in emissions – Netting calculation, if any Stack height

10 Emissions Data–what to look for What method is used to measure emissions? – Stack tests – when, how often? – Correct emission factors? – Do assumptions make sense? – Is baseline year the correct year? – Is averaging done correctly? Is calculation for the emissions change clearly shown and explained? Is stack height measured correctly?

11 Air Quality Impact Analysis Terrain Model name Features selected Results – Increment – NAAQS – Class I areas

12 Modeling–what to look for All important terrain features identified? Correct model being used? – Pollutants – sources Assumptions reasonable? Correct meteorological data set being used? All results presented, or only summaries?

13 More modeling things to look for Increment analyses done correctly? – Baseline area? – All relevant pollutants – Any increment violations? Do emission increases cause new NAAQS violations? Do emissions impact existing nonattainment areas? – Impacts mitigated?

14 Control technology Proposed Best Available Control Technology (BACT) – Top-down approach Describe other alternatives For each relevant pollutant

15 Control Technology–what to look for Reasons for not choosing best technology? Technology from BACT/LAER Clearinghouse? Technology for all relevant pollutants?

16 Public Participation/Notice Date, time documentation Notice in readily available local newspaper Contacted Relevant Federal Land Managers Contacted nearby tribes

17 Public comment–what to look for All FLM concerns addressed? Public notice clear and well publicized? Any public comments? Public comments adequately addressed?

18 Were formalities met? Did source submit permit application before commencing construction? Has the state been working with source? Permit easy to follow?

19 For more information Nancy Mayer

20 How to submit comments States must send copy of permit to tribal governing body Public-comment period Can request public hearing and provide verbal comments Special Class I protection – Lower increment allowed – Visibility