Institute for Cosmic Ray Research Univ. of Tokyo Development of an RSE Interferometer Using the Third Harmonic Demodulation LIGO-G010322-00-Z Osamu Miyakawa,

Slides:



Advertisements
Similar presentations
Gravitational Wave Astronomy Dr. Giles Hammond Institute for Gravitational Research SUPA, University of Glasgow Universität Jena, August 2010.
Advertisements

19. October 2004 A. Freise Automatic Alignment using the Anderson Technique A. Freise European Gravitational Observatory Roma
Dual Recycling for GEO 600 Andreas Freise, Hartmut Grote Institut für Atom- und Molekülphysik Universität Hannover Max-Planck-Institut für Gravitationsphysik.
Cascina, January 25th, Coupling of the IMC length noise into the recombined ITF output Raffaele Flaminio EGO and CNRS/IN2P3 Summary - Recombined.
Polarization Techniques for Interferometer Control Peter Beyersdorf National Astronomical Observatory of Japan LSC March 2002 Advanced Configurations LIGO-G Z.
LIGO NSF review, 11/10/05 1 AdLIGO Optical configuration and control Nov 10, 2005 Alan Weinstein for AdLIGO Interferometer Sensing and Control (ISC) and.
Caltech 40m Current Issues University of Florida Kentaro Somiya.
NSF : Nov. 10, LIGO End to End simulation overview  Time domain simulation written in C++  Like MATLAB with Interferometer toolbox  Major physics.
Koji Arai – LIGO Laboratory / Caltech LIGO-G v1.
Towards dual recycling with the aid of time and frequency domain simulations M. Malec for the GEO 600 team Max-Planck-Institut für Gravitationsphysik Albert-Einstein-Institut.
Virgo Control Noise Reduction
Stefan Hild 1ILIAS WG1 meeting, Cascina, November 2006 Comparison of tuned and detuned Signal-Recycling Stefan Hild for the GEO-team.
GWADW 2010 in Kyoto, May 19, Development for Observation and Reduction of Radiation Pressure Noise T. Mori, S. Ballmer, K. Agatsuma, S. Sakata,
RF readout scheme to overcome the SQL Feb. 16 th, 2004 Aspen Meeting Kentaro Somiya LIGO-G Z.
Design of Stable Power-Recycling Cavities University of Florida 10/05/2005 Volker Quetschke, Guido Mueller.
LIGO-G R Aspen Current Status of the 40m Detuned RSE Prototype Seiji Kawamura 2004 Aspen Winter Conference on Gravitational Waves Gravitational.
Interferometer Control Matt Evans …talk mostly taken from…
Stefan Hild October 2007 LSC-Virgo meeting Hannover Interferometers with detuned arm cavaties.
GEO‘s experience with Signal Recycling Harald Lück Perugia,
Generation and Control of Squeezed Light Fields R. Schnabel  S.  Chelkowski  A.  Franzen  B.  Hage  H.  Vahlbruch  N. Lastzka  M.  Mehmet.
Amaldi conference, June Lock acquisition scheme for the Advanced LIGO optical configuration Amaldi conference June24, 2005 O. Miyakawa, Caltech.
LIGO-G Z 2) Accomplishment of Japan RSE '98-'01 -- Result of Osamu’s RSE Experiments -- LSC Livingston 2002 Kentaro Somiya University.
GEO600 Detector Status Harald Lück Max-Planck Institut für Gravitationsphysik Institut für Atom- und Molekülphysik, Uni Hannover.
Displacement calibration techniques for the LIGO detectors Evan Goetz (University of Michigan)‏ for the LIGO Scientific Collaboration April 2008 APS meeting.
LIGO- G R Telecon on June, Mach-Zender interferometer to eliminate sidebands of sidebands for Advanced LIGO Osamu Miyakawa, Caltech.
LIGO- G R Sensing and control, SPIE conference, June Sensing and control of the Advanced LIGO optical configuration SPIE conference at.
Advanced Virgo Optical Configuration ILIAS-GW, Tübingen Andreas Freise - Conceptual Design -
Conversion of the Glasgow 10m Prototype for Detuned Operation Bryan Barr Institute for Gravitational Research University of Glasgow LSC - AIC August 13.
LSC-March  LIGO End to End simulation  Lock acquisition design »How to increase the threshold velocity under realistic condition »Hanford 2k simulation.
RSE Experiment in Japan Feb. 20 th, 2004 Aspen Meeting LIGO-G Z K.Somiya, O.Miyakawa, P.Beyersdorf, and S.Kawamura.
LIGO- G R Aspen winter conference, January Toward the Advanced LIGO optical configuration investigated in 40meter prototype Aspen winter.
Isola d’Elba, Italy 2006GWADW-VESF meeting Diagonalizing sensing matrix of RSE interferometer Shuichi Sato TAMA project National Astronomical Observatory.
Abstract The Hannover Thermal Noise Experiment V. Leonhardt, L. Ribichini, H. Lück and K. Danzmann Max-Planck- Institut für Gravitationsphysik We measure.
AIGO 2K Australia - Italy Workshop th October th October 2005 Pablo Barriga for AIGO group.
Nov 3, 2008 Detection System for AdV 1/8 Detection (DET) Subsystem for AdV  Main tasks and requirements for the subsystem  DC readout  Design for: the.
Dual Recycling in GEO 600 H. Grote, A. Freise, M. Malec for the GEO600 team Institut für Atom- und Molekülphysik University of Hannover Max-Planck-Institut.
The VIRGO Suspensions Control System Alberto Gennai The VIRGO Collaboration.
LIGO- G R 40m weekly meeting, Jan 05, Explore demodulation phase for DDM on 40m RSE prototype Osamu Miyakawa, Caltech LIGO-G R.
MOTIVATION OF THIS PROJECT Testing the control scheme with a prototype interferometer to demonstrate the control of the tuned RSE for LCGT is necessary.
Concept and Current Status of Japan 4m RSE March Kentaro Somiya LIGO-G Z.
SQL Related Experiments at the ANU Conor Mow-Lowry, G de Vine, K MacKenzie, B Sheard, Dr D Shaddock, Dr B Buchler, Dr M Gray, Dr PK Lam, Prof. David McClelland.
Optical Spring Experiments With The Glasgow 10m Prototype Interferometer Matt Edgar.
LIGO-G Z March 2007, LSC meeting, Osamu Miyakawa 1 Osamu Miyakawa Hiroaki Yamamoto March 21, 2006 LSC meeting Modeling of AdLIGO arm lock acquisition.
1 DC readout for Virgo+? E. Tournefier WG1 meeting, Hannover January 23 rd,2007 DC vs AC readout: technical noises Output mode cleaner for DC readout.
Monica VarvellaIEEE - GW Workshop Roma, October 21, M.Varvella Virgo LAL Orsay / LIGO CalTech Time-domain model for AdvLIGO Interferometer Gravitational.
LIGO- G R 40m/AdLIGO, LSC, August Issues in sensing and control of the 40m and Advanced LIGO optical configuration LSC meeting, August.
LIGO-G Z 3) Current Status & Plan for Japan RSE -- Stabilization and Installation of PRC & Detuning -- LSC Livingston 2002 Kentaro Somiya.
Stefan Hild 1GWADW, Elba, May 2006 Experience with Signal- Recycling in GEO 600 Stefan Hild, AEI Hannover for the GEO-team.
Active Vibration Isolation using a Suspension Point Interferometer Youichi Aso Dept. Physics, University of Tokyo ASPEN Winter Conference on Gravitational.
1 Fumiko 2006 Elba Meeting Current status of the 4m RSE.
Yoichi Aso Columbia University, New York, NY, USA University of Tokyo, Tokyo, Japan July 14th th Edoardo Amaldi Conference on Gravitational Waves.
Testing Advanced LIGO length sensing and control scheme at the Caltech 40m interferometer. at the Caltech 40m interferometer. Yoichi Aso*, Rana Adhikari,
Interferometer configurations for Gravitational Wave Detectors
Detuned Twin-Signal-Recycling
Demonstration of lock acquisition and optical response on
Overview of quantum noise suppression techniques
Status report of Polarization RSE
Design of Stable Power-Recycling Cavities
Heterodyne Readout for Advanced LIGO
Current Status of the 40m Detuned RSE Prototype
Heterodyne Readout for Advanced LIGO
40m Laboratory Upgrade Progress Report
Effect of sideband of sideband on 40m and Advanced LIGO
Summary of iKAGRA Test Run Mar 25-31, 2016
Advanced LIGO optical configuration investigated in 40meter prototype
Estimation of each loop shot noise limit for AdLIGO
RF readout scheme to overcome the SQL
Alignment Investigations towards Advanced Virgo
Homodyne detection: understanding the laser noise amplitude transfer function Jérôme Degallaix Ilias meeting – June 2007.
Presentation transcript:

Institute for Cosmic Ray Research Univ. of Tokyo Development of an RSE Interferometer Using the Third Harmonic Demodulation LIGO-G Z Osamu Miyakawa, Kentaro Somiya A, Gerhard Heinzel B, Seiji Kawamura C ICRR Univ. of Tokyo, Dept. of Advanced Materials Science, Univ. of Tokyo A, Max-Planck-Institut fuer Gravitationsphysik B, NAO C Aug. LSC

Institute for Cosmic Ray Research Univ. of Tokyo Suspended-mass RSE locked for the first time in the world  using single modulation  by Third Harmonic Demodulation

Institute for Cosmic Ray Research Univ. of Tokyo Purpose of our experiment Signal sensing for SEC using Third Harmonic Demodulaiton Experiment Summary and next plan Contents

Institute for Cosmic Ray Research Univ. of Tokyo Purpose of our RSE experiment ・ Different from real interferometer ・ Only low finesse available ・ Complicated (Transmission of MC, Control scheme) Other table top experiments Feature ・ Fixed mirror in the air ・ Multi modulations Objectives/Scope ・ To establish the control scheme using single modulation ・ Suspended mirror ・ High finesse cavity in vacuum chamber

Institute for Cosmic Ray Research Univ. of Tokyo Most difficult point of RSE locking the extraction of a Signal Extraction Cavity(SEC) signal(  ls). Mixture of  L+ and  L- signal to  ls signal is quite large. Need to improve the signal ratio of  ls –multi modulation –establish a new sensing scheme using single modulation

Institute for Cosmic Ray Research Univ. of Tokyo Application of 3 rd order harmonic demodulation 1 st order demod. Sb1 Sb-1 Sb2 Sb-2 Sb3 Sb-3 Ca  L+,  L- lsls sum 3 rd order demod. Ca Sb2 Sb-2 Sb3 Sb-3 Sb-1 Sb1  L+,  L- lsls zero sum

Institute for Cosmic Ray Research Univ. of Tokyo Dark condition of 3 rd order sideband Asymmetry in Michelson 3rd order sidebands vanish at the anti symmetric port Asymmetry ( ~ 3m) 51.75MHz x3 Frequency Tripler 17 . 25MHz

Institute for Cosmic Ray Research Univ. of Tokyo Signal ratio The depth of improvement is depend on the asymmetry length. We can adjust the modulation frequency instead of asymmetry length to satisfy the condition. Signal ratio of  L- and  ls with 1 st and 3 rd order demodulation If the demodulation phase is exactly zero,  L- is zero in both 1 st and 3 rd demodulation case, but in non zero demodulation phase case, 3 rd demodulation has good signal ratio.

Institute for Cosmic Ray Research Univ. of Tokyo RSE experimental setup ・ FM,EM,BS,SEM are suspended as single loop pendulum. ・ 4m two arm cavities, finesse:1000(vacuum) or 300(air) ・ 8.75m SEC, R SEM =0.6 ・ Big (3m) asymmetry ・ Mode matching is compensated by two lenses.

Institute for Cosmic Ray Research Univ. of Tokyo Large vacuum chamber Small vacuum chamber 3m Pipe Optical bench Detector bench Experimental setup of RSE ←To small chamber FM BS lense FM lense

Institute for Cosmic Ray Research Univ. of Tokyo Small Suspension System (SSS) Damping magnets Mirror 4 magnet-coil actuators 1 inch mirror is suspended by single- loop wire. Mirror position and orientations are controlled by 4 coil-magnet actuators. Motion of the mirror at resonant frequency is efficiently damped by the eddy-current damping.

Institute for Cosmic Ray Research Univ. of Tokyo ・ SEC error signal is extracted by Third Harmonic Demodulation at Anti Symmetric port. ・ Two FP arm cavities are locked by picked-off light independently. ・ Frequency is stabilized by error signal of primary arm cavity. ・ Lock time is over 10 minutes. RSE control topology using THD ・ not vacuum ・ without Power Recycling ・ not detuned 51.75MHz

Institute for Cosmic Ray Research Univ. of Tokyo Lock acquisition of RSE Lock

Institute for Cosmic Ray Research Univ. of Tokyo Locking selection of SR/RSE unlock Power at dark port Error sig. of SEC from 3 rd demod. at dark port RSE lock SR lock SR lock point RSE lock point

Institute for Cosmic Ray Research Univ. of Tokyo Measurement of cavity Transfer Function ・ Shaking L- to see the cavity response

Institute for Cosmic Ray Research Univ. of Tokyo Transfer function resonance of pendulum SR : upper than FPMI RSE : lower than FPMI

Institute for Cosmic Ray Research Univ. of Tokyo Difference between transfer function of SR and RSE at DC is 7dB.

Institute for Cosmic Ray Research Univ. of Tokyo Conclusion –We locked suspended-mass Resonant Sideband Extraction with one modulation and by Third Harmonic Demodulation. –We confirmed the RSE and SR locking by comparing the response of the interferometer for both configurations. Next plan –vacuum –measurement of T.F. with wide band including pole –L+ L- control –detuned RSE –Power Recycling