GTR9-6-21 Industry proposal (update) to identify the relevant measuring results in FlexPLI to vehicle tests to be compared to the Flex-PLI requirements.

Slides:



Advertisements
Similar presentations
© Grant Thornton UK LLP. All rights reserved. Review of Partnership Working: Follow Up Review Vale of Glamorgan Council Final Report- November 2009.
Advertisements

Flex PLI GTR Status 1-2 December 2011 Bernard Been Informal Group GTR9 PH2 GTR9-1-08r1.
Waitlist Cleanup Update Fiscal Committee May 5, 2014.
1 Status Report on Flexible Pedestrian Legform Impactor Technical Evaluation Group (Flex-TEG) Activities Status Report on Flexible Pedestrian Legform Impactor.
Information for the Flexible Pedestrian Legform Impactor (Flex-PLI)
NHTSA Evaluation of the Flex- GTR Legform on US Vehicles
Insert the title of your presentation here Presented by Name Here Job Title - Date Change to foam flesh used by EEVC lower & upper legforms Brian Hardy.
GTR9-C-04 History of Development of the Flexible Pedestrian Legform Impactor (Flex-PLI) November 3rd, 2011 Japan.
Checklist for Vehicle Testing GTR Round Robin FlexPLI Logbook for each leg to be sent with the leg to record the following: Certification tests.
Update on Pedestrian Leg Testing
Ministry of Land, Infrastructure and Transport Clarification of Relaxation Area(s) for Flexible lower legform to bumper test Submitted by the expert from.
1 Consideration on ACL/PCL Failure Evaluation Transmitted by the expert from JAPAN December 2009 Geneva Informal document No. GRSP (46th GRSP, 8-11.
Lower/Upper Bumper Reference Line Data on existing vehicles INTERNATIONAL ORGANIZATION OF MOTOR VEHICLE MANUFACTURERS.
WLTP DTP PM-PN Subgroup Activities, Progress & Future Plans 7 th DTP Meeting Bern 12 th – 14 th September 2011 Chris Parkin.
To Conduct FlexPLI Round Robin Car Test Smoothly and Effectively We had 10 organizations offering to join the FlexPLI Round Robin Car Tests. To conduct.
Fourth progress report of the informal group on Phase 2 of gtr No. 9 (IG GTR9 - PH2) Transmitted by the experts of Japan and Germany Informal document.
Definition of a Vehicle Type for IWVTA + Extension of Approvals SGR Transmitted by OICA.
United Nations Statistics Division Registry of national Classifications.
Movement on Noise Regulation – Alignment with R 51.03
Slide 1 Flex PLI Inverse Test Setup - Moving Ram Friction Dirk-Uwe Gehring BGS Böhme & Gehring GmbH 5 th Meeting of the IG GTR9-PH2 Bergisch Gladbach,
Controller Timers or timing processes Minimum green Maximum green Vehicle extension/passage time/gap time The minimum green timer becomes active.
Implementing SB 1525: An Update Cheyenne Walsh Squire Sanders (US) LLP Government Finance Officers Association of Arizona Winter Conference Prescott, Arizona.
Leg Feasibility Testing 9 th GRSP Ad Hoc Meeting Geneva, Switzerland December 5-6, 2005.
Difference of TRL legform impactor/injury criteria and Flex pedestrian legform impactor/injury criteria 16 May 2011 Japan Informal document GRSP
Juanita Folmsbee, Country Project Director, SIAPS program Feedback related to Pharmaceutical Sector.
FlexPLI Rebound Phase 7 th IG GTR9-PH2 Meeting 3/July/2013 Japan Automobile Standards Internationalization Center (JASIC) GTR
Atsuhiro Konosu Chairperson of Flex-TEG, Japan Status Report on Flexible Pedestrian Legform Impactor Technical Evaluation Group (Flex-TEG) Status Report.
1 Atsuhiro Konosu Chairperson of Flex-TEG, Japan Status Report on Flexible Pedestrian Legform Impactor Technical Evaluation Group (Flex-TEG) Activities.
1 Status Report on Flexible Pedestrian Legform Impactor Technical Evaluation Group (Flex-TEG) Activities Status Report on Flexible Pedestrian Legform Impactor.
Introduction to Revision of GTR 7
GTR Durability Study SN03 at Bertrandt Laboratory Bertrandt Ingolstadt Ingolstadt, 19. March 2013, J.C. Kolb.
Ministry of Land, Infrastructure, Transport and Tourism (MLIT), Japan Japanese proposal on evapo –gtr 8 Sep JAPAN proposal on EVAP-GTR to add Japanese.
Flex-GTR Master Leg Level Impactor Test Data - Pendulum Test - June 28, 2013 Japan Automobile Standards Internationalization Center (JASIC) 1 GTR
GTR & Page 1 Technical Specification and PADI Procedures for Assembly, Disassembly and Inspection Presented by the pedestrian safety.
1 Status Report on Flexible Pedestrian Legform Impactor Technical Evaluation Group (Flex-TEG) Activities Status Report on Flexible Pedestrian Legform Impactor.
Project Information. Contact Information Project Being Developed.
PROJECT CHANGES Rachel Burn, Joint Secretariat April 20th, 2016 – Faroe Islands.
1. Considering the Questions Why does phase terminate for each scenario? What is process followed by Minimum Green timer? What is process followed by.
OICA input on TF1 discussions for GTR-EVS
<workgroup name>
Attestation Concept additional explanation and implementation proposal
WLTP Informal Working Group
GTR Proposed amendments of the three-point bending certification test figure Current : When performing certification tests according to the figure,
ISO 9001:2015 Auditor / Registration Decision Lessons Learned
Passenger Mobility Statistics 28 April 2016
Development of Amendment # 2 to UN GTR No. 16 on Tyres
Progress Report TF Sequence Listing in XML
WLTP DTP PM-PN Subgroup Activities, Progress & Future Plans
Option C Reviewer Update
WLTP-21-04e Revision 1 Amendment proposals for annex 2 of GTR #15 from the cycle gearshift issues task force Heinz Steven
Submitted by the expert from Republic of Korea
Proposals from the Informal Working Group on AEBS
Welcome to CT1315 Project1 Latifa AlAbdlkarim King Saud University October,2009.
PROJECT CHANGES Rachel Burn, Joint Secretariat
Informal document GRVA nd GRVA, 28 Jan Feb. 2019
Introduction to Revision of GTR 7
WLTP Informal Working Group
Bourke properties Houston, Whitney relocation info 23/02/2019.
Update on Pedestrian Leg Testing
Japan contributions on Transposition TF
Informal document GRVA st GRVA, September 2018
Membership & Professional Standards Committee Fall 2014
Why a „test phase“? Overview
Proposed actions for gtr development
Lower limb Fig :.
Summary of Proposed Amendment to gtr 9
WLTP Phase 1a Round Robin (European plan)
Sustainable Mobility & Automotive industry Unit
Alexander (Sandy) Elliott HS4 Presentation
Chairperson of Flex-TEG, Japan
Presentation transcript:

GTR Industry proposal (update) to identify the relevant measuring results in FlexPLI to vehicle tests to be compared to the Flex-PLI requirements of the GTR9-PH2 See rebound discussion during the 5. IG-GTR9-PH2 meeting in Dec at the BASt offices See also documents TEG-128, GTR and GTR IG-GTR9-PH2 meeting, NHTSA Washington, 19. & Page 1 Flex-PLI Rebound Issue: Industry Proposal

GTR IG-GTR9-PH2 meeting, NHTSA Washington, 19. & General: Updated proposal based on the aforementioned documents GTR and GTR The basic statements to biofidelity & biomechanics of the FlexPLI remain unchanged (see TEG-128) Relevant results which have to be compared to the requirements are measured during the contact phase of the impactor and the vehicle Page 2 Flex-PLI Rebound Issue: Industry Proposal

GTR IG-GTR9-PH2 meeting, NHTSA Washington, 19. & Updated Proposal: Distinguish between bending moment results and ligament results since contact phases of tibia and knee are different Bending moment measurements T1, T2, T3 and T4: The relevant result is the maximum before 30ms However, the maximum before 50ms is used when the following conditions are met: 1.The maximum value up to 30ms is taken at 30ms 2.The overall maximum is taken after 30ms and the difference relative to the first local minimum prior to the overall maximum is no more than 170 Nm 3.Whenever deemed necessary Page 3 Flex-PLI Rebound Issue: Industry Proposal

GTR Flex-PLI Rebound Issue: Industry Proposal 6. IG-GTR9-PH2 meeting, NHTSA Washington, 19. & Updated Proposal: Ligament elongation measurements MCL, ACL and PCL: The relevant result is the maximum of local maximum values before 50ms Page 4

GTR Flex-PLI Rebound Issue: Industry Proposal 6. IG-GTR9-PH2 meeting, NHTSA Washington, 19. & Justification (1/2): The proposal is objective – no individual film assessment based on measured time history data easy and robust enough Page 5

GTR Flex-PLI Rebound Issue: Industry Proposal 6. IG-GTR9-PH2 meeting, NHTSA Washington, 19. & Justification (2/2): Local peaks for bending moments are clearly before 30ms (see GTR9-5-08: case studies; and GTR9-5-30: page 4) The 50ms value for ligament measurements are observed by an additional JAMA case study (see next 2 pages) Page 6

GTR Flex-PLI Rebound Issue: Industry Proposal 6. IG-GTR9-PH2 meeting, NHTSA Washington, 19. & Page 7

GTR Flex-PLI Rebound Issue: Industry Proposal 6. IG-GTR9-PH2 meeting, NHTSA Washington, 19. & Page 8

GTR Flex-PLI Rebound Issue: Industry Proposal 6. IG-GTR9-PH2 meeting, NHTSA Washington, 19. & Next steps: Use test results of the round robin tests of the master legs to confirm this proposal Establish a final IG-position latest in Sep 2013 meeting Develop proposal to implement the rebound issue into the GTR9 and UN-R-127 amendments Page 9

GTR Flex-PLI Rebound Issue: Industry Proposal 6. IG-GTR9-PH2 meeting, NHTSA Washington, 19. & Thank you Page 10