CIGRE WG C4.503 – Numerical techniques for the computation of power systems, from steady- state to switching transients WG Composition:  Jean Mahseredjian.

Slides:



Advertisements
Similar presentations
United Kingdom New Zealand United Kingdom New Zealand Iceland.
Advertisements

Review of Solar Cities activities: CO 2 balances in cities Chiel Boonstra.
CIGRE WG C PRACTICES IN INSULATION COORDINATION OF MODERN ELECTRIC POWER SYSTEMS AIMED AT THE REDUCTION OF INSULATION LEVELS WG Composition: WG.
Official Languages: English and French. International Civil Aviation Organization (ICAO) recognizes the Academy as an International Non-Government Association.
FIFA WORLD CUP ALGERIA Africa ARGENTINA / South America.
IPHE Goal Efficiently organize and coordinate multinational research, development and deployment programs that advance the transition to a global hydrogen.
ISO/IEC Software Testing
Twenty Questions Subject: Flags of the world Twenty Questions
Flags of the world play.
Fujitsu’s XBRL Activities Makoto Koizumi Fujitsu Limited 2006 May 16th.
Leaders in Asset Management ISO Asset Management Systems 1 Prepared by Jim Dieter, MIAM CPPM CF NPMA Executive Vice President Director of Strategic.
Poverty & Human Capability 101 Introductory Class.
Safety Driven Performance Conference 2013 The future of managing asset-intensive businesses John Keefe APM/RBMI Technical Manager Asset Integrity Services.
Developing OR in Africa: initiatives of IFORS and EURO Graham K. Rand Alexis Tsoukias IFORS Vice-President, Secretary, EURO
The Iterative Process of Project Planning 13 Structure the project
OECD Review of Russian Statistics Peer Review Mission to Russia April 2012 Tim Davis Head, Global Relations, Statistics Directorate.
PRIVP Huang Overview of Successes and Challenges
The International Federation for Information Processing.
1 Announcing … Global broadband subscribers to 30 June 2005 Total: 176 million 115 million * 65% * choose DSL.
Capitalist. Main Points In a capitalist or free-market country, people can own their own businesses and property. People can also buy services for private.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.24 AR 2014Page No.: 1 Activity Report 2014 WG A3.24 Tools for Simulating Internal.
Match the countries and their capitals: Italy France Germany Spain The Netherlands The Czech Republic India Belgium Norway Bern Amsterdam Rome Prague.
CIGRE WG C4.24 – Power Quality and EMC Issues associated with future electricity networks WG Composition:  Convener: Francisc Zavoda; Secretary: Sarah.
Israel Accession Seminar PIAAC: Programme for International assessment of Adult Competencies Skills strategy in OECD Programme for the International Assessment.
FIFA World Cup 2010 By Holly McCulloch and Samantha Mitchell.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.27 AR 2014Page No.: 1 Activity Report 2013 WG A3.27 The Impact of the Application.
The GRADE website and membership Yngve Falck-Ytter, M.D. Case Western Reserve University School of Medicine Barcelona, January 12&13, 2012 GRADE January.
INTERNATIONAL ELECTROTECHNICAL COMMISSION Standardization Management Board Decisions How They Affect Your TAG! Jim Matthews Vice President & SMB Chairman.
Evaluation of Paris Club Eline, Neil and Ben. What is the Paris Club? ❖ An informal group of officials from creditor countries whose role is to find coordinated.
Teams of the 2010 World Cup A short introduction to each team.
The United States The Economy. What is GDP ? Gross Domestic Product (GDP): The total market (or dollar) value of all final goods and services produced.
Title: World Cup Countries.
The RESEARCH DATA ALLIANCE Individual & Organisational –
2016 Global Manufacturing Competitiveness Index. 2Deloitte and US Council on Competitiveness I 2016 Global Manufacturing Competitiveness IndexCopyright.
World Cup 2010 Brian White. Groups Eight Groups –Group A –Group B –Group C –Group D –Group E –Group F –Group G –Group H.
CIGRE JWG A2/C4.52 – High-Frequency Transformer and Reactor Models for Network Studies WG Composition:  WG Convener: Bjørn Gustavsen  WG Secretary: Angelica.
CIGRE WG C4.24 – Power Quality and EMC Issues associated with future electricity networks WG Composition:  Convener: Francisc Zavoda; Secretary: Sarah.
Global Aluminium Pipe and Tube Market to 2018 (Market Size, Growth, and Forecasts in Nearly 60 Countries) Published Date: Jul-2014 Reports and Intelligence.
Essex Abroad Opportunities Students applying for year abroad in
GREAT CANADIAN FLAG DEBATE. STEP 1: MATCH THE FLAG TO THE COUNTRY Australia, Belgium, Brazil, Britain, China, Denmark, Egypt, Finland, Germany, Iceland,
8. Current and Future Financing of JPI Secretariat.
USD billion
Tax Policy Challenges in a Changing World. Unintended Consequences of Tax Rob Marston, “Window Tax”, 1 September 2010 uploaded via Flickr, creative commons.
ISO/IEC Software Testing The New International Software Testing Standard By Tafline Murnane and Stuart Reid ISO/IEC JTC1/SC7 WG26 Software Testing.
How RDA is growing? Total RDA Community Members: 2668.
NSO data collections of subjective well-being

ISO/IEC Software Testing
WG Composition: WG Convener: Bjørn Gustavsen
Flag Quiz #1 10 Flags.
South Africa Mexico.
Six Sigma Total Error Percent Process Sigma 1,000, ,000 10% 2.78
Introduction to The Open Group
The Most Visited Countries
ISO TC268 SC1 - Smart Community Infrastructures -
Snapshot of Global PV Markets
CIGRE WG C4.28 Extrapolation of EMF measurements
CIGRE WG C4.33 – Impact of Soil-Parameter Frequency Dependence on the Response of Grounding Electrodes and on the Lightning Performance of Electrical Systems.
WG Composition: WG Convener: W. A. Radasky
The 1680 Family’s Reach.
Status of EQ-5D-5L Valuation Using Standardized Valuation Methodology
Sourcing. Costs. HARDWARE + SERVICE
François Lequiller OECD
GDP (Nominal, in trillions) 2017 World Bank
Standardization Management Board Decisions How They Affect Your TAG!
Renewable energies in Russia
1 Point! 2 Points! 3 Points! 4 Points! 5 Points!!
2006 Rank Adjusted for Purchasing Power
Norbert Rainer UNECE Meeting of the Group of Experts on Business Registers Geneva 2-4 September 2013 Session 4: Draft Chapters of Guidelines for Statistical.
Electrification business
Presentation transcript:

CIGRE WG C4.503 – Numerical techniques for the computation of power systems, from steady- state to switching transients WG Composition:  Jean Mahseredjian (Convener), Polytechnique, Montreal  Secretary Bhupesh Gajera, ABB, UK  Total of 28 members 16 countries: Australia, Brazil, Canada, Denmark, France, Ireland, Japan, Mexico, Netherlands, Portugal, Spain, South Korea, Sweden, Switzerland, UK, US WG Timeline:  Start Date: May 2011  Expected Date for Submitting Final Report to SC Chairman: May 2016

CIGRE WG C4.503 – Numerical techniques for the computation of power systems, from steady- state to switching transients Highlights of Recent Activity:  Brief list of most recent meetings/activities (e.g. WG presentations at conferences and symposia) The last official meeting was held in Paris during CIGRE 2014 We have established several important benchmarks (Very large effort) – For traditional power system analysis: IEEE39 and new large realistic grid – All generator controls for IEEE39 have been upgraded – For wind integration: small system, large systems, combination of Type III and Type IV wind generators – For GMD studies – For PMU with EMTP – For a distribution system (IEEE390) The progress and coordination with members has been much slower. The problem is not simple and requires meticulous verification and maintenance of test cases. The test cases are complex. Using various software packages is complicated for the verification of results. Organizations are promising to deliver work, but it often takes too much time. I will now change the approach and simply prepare the report and circulate for comments.

Future Activity:  A meeting should be planned in November 2015  Start to finalize the descriptions of benchmarks and report Other Items:  The task of this group is complex and requires time to complete. I am trying to increase the contributions of members and availability. The task is important and I will work hard to complete. CIGRE WG C4.503 – Numerical techniques for the computation of power systems, from steady- state to switching transients