13 kA Energy Extraction LHC machine Gert Jan Coelingh – Knud Dahlerup-Petersen – TE/MPE/EE.

Slides:



Advertisements
Similar presentations
Inspection & Preventive maintenance of breakers
Advertisements

TE/MPE/EE Presentation to MPE at TM #52 on K. Dahlerup-Petersen TE/MPE/EE – System Upgrades and Individual System Tests of the 13.
Lecture - 4 Inductance and capacitance equivalent circuits
Chapter 8Basic Computer Maintenance  8.1Preventive Maintenance 8.1Preventive Maintenance 8.1Preventive Maintenance  8.2Monitoring System Performance.
Oliver Bitterling  Introduction to the QPS  Radiation damage in electronic systems  Construction of radiation tolerant systems  Radiation test and.
58 th MPE-TM – October 2, 2014 G.J. Coelingh, TE-MPE-EE Long Shutdown 1 Status Report Energy Extraction Systems On behalf of all EE teams involved.
TE-MPE-CP, RD, 03-Dec Quench Detection and Energy Extraction Systems R. Denz (Quench Detection), K. Dahlerup-Petersen (Energy Extraction Systems),
HIE-ISOLDE (High Intensity and Energy) project Protection of superconducting solenoids MPE work shop – December 14, 2010 G.J. Coelingh TE-MPE-CP.
CRYOGENICS AND POWERING
ADT490 TroubleShooting Device Failures. 2 Introduction ‣ Many problems are external to FAS ‣ Many are device problems.
Upgrade of the Breakers Control Module in 13 kA EE systems Bozhidar Panev TE-MPE-EE
Upgrade, IST and Powering tests of the 13kA Energy Extraction system Bozhidar Panev – LS1 Review.
41 st LSC – March 21, 2014 G.J. Coelingh, TE-MPE-EE Long Shutdown 1 Status Report The upgrade of 600 A Energy Extraction Systems.
Upgrades and Activities of 13kA EE systems during LS1 Bozhidar Panev TE-MPE-EE
Design and operation of existing ZS B.Balhan, J.Borburgh, B.Pinget B.BalhanDesign and operation of existing ZS SPS ZS Electrostatic Septum Upgrade Review.
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
C E L E B R A T I O N LS1 COLLABORATION SEMINAR Thursday 27 November 2014 We commemorate today: - 9 years (already) of an extraordinary scientific/technical.
ATC / ABOC Days – Session 4 – January D. Smekens AT-MCS-MNC 1 MAGNETS FOR SPS & BEAM LINES MTTR & Spare Policy for the LHC Injectors & Exp.
TE/MPE/EE Presentation to MPE at TM #52 on K. Dahlerup-Petersen TE/MPE/EE – Individual System Tests of the 13 kA Energy Extraction.
Chamonix Risks due to UPS malfunctioning Impact on the Superconducting Circuit Protection System Hugues Thiesen Acknowledgments:K. Dahlerup-Petersen,
HOW THE DUMP RESISTOR’S TANK LOOKS LIKE COOLING OF THE LHC ENERGY EXTRACTION RESISTORS G. Peón (ST/CV), K. Dahlerup-Petersen, G. Coelingh (AT/MEL) Air.
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
Why Energy Extraction in the LHC ?  For the LHC 13 kA circuits of arc dipole and quadrupole chains: In case of a magnet quench a rapid current decay is.
CERN Rüdiger Schmidt FCC week 2015 Long Magnet Stringpage 1 Incident September 19 th Architecture of powering and protection systems for high field.
Becoming familiar with QPS systems in the LHC (incl. EE) Presentation 02 Sept PART 1 of 3. Part 1: General layouts and principles Presentation of.
Update and status for the Work Unit ‘Energy Extraction’ - equipping the three test benches for series testing of Super-FRS Dipoles D2, D3, D4 and Quadrupoles.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Etienne CARLIER, LBDS Audit, 28/01/2008 LBDS Environmental Aspects EMC, radiation, UPS… Etienne CARLIER AB/BT/EC.
Training LHC Powering R. Denz Quench Protection System R. Denz AT-MEL.
MPE-TM 17/10/2013 G.J. Coelingh TE-MPE-EE ENERGY EXTRACTION Development of Semi-Conductor Switches Alexandre Erokhin, Gert Jan Coelingh, Bozhidar Panev,
AT-MEL-PM, R. Denz, CERN, CH-1211 Geneva 23 1 QPS system and its risks  Principal risks  General remarks  Quench heater circuits  Quench detection.
Chapter 27 Lecture 24: Circuits: II HW 8 (problems): 26.10, 26.22, 26.35, 26.49, 27.12, 27.30, 27.40, Due Friday, Nov.6.
AT-MEI-PE, RD, LIUWG 31-JUL R. Denz AT-MEI-PE LHC Luminosity Upgrade Protection of the Inner Triplet, D1, Correctors and Superconducting Links/Leads.
MPE Review – June 2, 2015 A. Erokhin, TE-MPE-EE Upgrade, IST and Powering tests of the Upgrade, IST and Powering tests of the 600A Energy Extraction Systems.
Essential lessons from commissioning of the 28 EE systems of LHC sector A corrector circuits.
Power Converters and DC cablesSlide 1/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Water cooled cables warm bus bars power converter.
TE/MPE activities currently planed for YETS Reiner Denz, Knud Dalherup-Petersen, Markus Zerlauth & Bruno Puccio YETS coordination meeting.
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
TE/MPE/EE Summary of Electrical Engineering Session Ed & Knud K. Dahlerup-Petersen TE/MPE/EE 23 November RB – RQ EE facility consolidation & upgrades.
30kA Energy Extraction Semi-Conductor Switch SM18 - CLUSTER D Recall Gert Jan Coelingh on behalf of all team members TE-MPE-EE.
TE-MPE LS1 workshop – November 22-23, 2012 G.J. Coelingh TE-MPE-EE LS1 The upgrade of 600 A ENERGY EXTRACTION SYSTEMS.
TE-MPE -EI 23/6/2011,Antonopoulou Evangelia RQS circuit Simulation results of Quench Antonopoulou Evangelia June 2011 Thanks to E. Ravaioli.
Machine Protection Review, R. Denz, 11-APR Introduction to Magnet Powering and Protection R. Denz, AT-MEL-PM.
Training LHC Powering - Markus Zerlauth Powering Interlocks Markus Zerlauth AB/CO/MI.
MPP Meeting 07/03/2007 MPP Main Ring Magnet Performance Panel Meeting Wednesday 7th March 2007 Agenda: 1)Matters arising 2)Recommendations for the case.
LSC May 2013 Outcome of the magnets tests from the PS, Leir and transfer lines Dominique Bodart.
Machine Protection Review, Markus Zerlauth, 12 th April Magnet powering system and beam dump requests Markus Zerlauth, AB-CO-IN.
  The traditional molded-case circuit breaker uses electromechanical (thermal magnetic) trip units that may be fixed or interchangeable.  An MCCB provides.
Training LHC Powering – Blanca Perea Solano From Individual System Tests to Powering to Nominal Blanca Perea on behalf of Hardware Commissioning Coordination.
Hardware Commissioning Review, R. Denz, 12-May Superconducting circuits: what remains to be done during hardware commissioning R. Denz AT-MEL-PM.
Power supply Conduction, Insulation and Protection Control Transformation of Energy Other Functions.
Mikhail Ovsienko TE-MPE-EE
Power Supply and Energy Extraction System for the CBM magnet
The Survey of the Power Supply Reliability at SSRF
CONS and HL-LHC day Analysis of needs from TE-EPC
Situation of the Static Var Compensators at CERN.
Powering LHC magnets version 30/3/2007.
The HL-LHC Circuits: Global View and Open Questions
Superconducting Circuits, a generic view
RELIABILITY OF 600 A ENERGY EXTRACTION SYSTEMS
Powering the LHC Magnets
MPE main activities planned for LS2
Dipole circuit & diode functioning
Powering from short circuit tests up to nominal
Knud Dahlerup-Petersen
Rüdiger Schmidt and Karl Hubert Mess
Power Supply and Energy Extraction System for the CBM magnet
Machine Protection Xu Hongliang.
+ many slides from various colleagues (KH, Rudiger, Paul, …)
Other arguments to train two sectors to 7 TeV
Presentation transcript:

13 kA Energy Extraction LHC machine Gert Jan Coelingh – Knud Dahlerup-Petersen – TE/MPE/EE

Components of an EE system: switches, drivers (powering and control electronics), current distribution system, extraction resistors, supervision electronics, cooling facility, Interlock system, Data Acquisition electronics and auxiliary systems (e.g. over-current detectors, snubber capacitor banks, electrical protection. Basic Requirements: Reliability of the release systems, continuous availability, low losses and radiation tolerance. Some Key Figures: The 32 high current and 202 low current EE facilities in the LHC represent 310 tons of equipment. All main components are tailor-made to the application, off-the-shelf equipment did not meet the CERN specification. The total reference cost of the systems was 19 MCHF. Store Energy: RB: 1’236 MJ at ultimate current -RQF/RQD: 24 MJ at ultimate current. 600 A corrector circuits: up to 150 kJ Locations: Even points: all eight UA galleries (RB, QF/QD, correctors) Odd points: all six RR tunnel extensions (RB, correctors), tunnel (RB power systems in R34, R37), UJ33 (RB controls, correctors).

600 A with external EE system, crowbar and internal, parallel resistor General lay-out with one series-inserted EE system. Ex: RQF/RQD RB circuit with two series- Inserted EE systems EPC – Y. Thurel Only series extraction used in LHC

Dipole Switch array ~ 12 m 2 ~ 24m 3

Control Power Electronics: 2 x 0.5m 2 ; < 1m 3

Interface Electronics & Daq&M – 19 inch 6U crate

RB Resistor Controls Module Temperature monitoring, Ventilation controls and monitoring,

DQRB 1 - DQRB 2 - DQRB 3 oo 6

Secondary water cooling system (low pressure)

Extraction switch assemblies for the main circuits Extraction resistors for the main circuits Distribution bus Breaker controls modules and sound shield VAB49 Quad DQR’s Dipole DQR’s

Three Dipole DQR’s under test at IHEP, Protvino, RU Double-storey enclosure containing DQSQF / DQSQD Two 600A EE systems in one rack Extraction switch in point3 ‘long’ version of busway Two 600A EE systems under test at BINP, Novosibirsk, RU

Quadrupole Resistor: < 1 m 2 < 2m 3

Maintenance Preventive maintenance (9 man-weeks/yr) – Yearly overhaul and service on breaker contacts and springs. – Yearly tests on individual systems (strong need of specialists (dying species) and expensive) Corrective maintenance (<1/yr) – If needed - strong need of specialists (dying species) and extremely expensive (beam dump or start-up delay)**

List of principal Non-Conformities observed during hardware Commissioning and Operation of the LHC 13 kA Energy Extraction Facilities: Unit / componentNon-ConformityOrigin / ReasonCureFollow-up / Consequences DQRQ quad dump resistor unitWrong resistance value (3.4 mΩ instead of 6.6 mΩ) Transport damage. Choc, breaking insulating parts inside the body Repair made at CERN after replacement Problem eliminated Now spare unit Fully conform DQRQ dump resistor unitLow insulation resistance to ground Rusty water dripping from ceiling of UA27. Cleaned after replacementProblem eliminated Now spare unit Fully conform DQRCS cooling station ‘Roese’.Several alarms from compressor supervision Regulation out of tolerance All 16 systems are now supplied by LHC compressed air distr. Local compressor removed Problem eliminated DQRB – most LHC pointsWrong voltage measurementUnknown at the momentBy elimination, still ongoingTest to be performed during next TS DQSB with closing problemHolding coil had internal short circuit Failure of wire insulation (enamel) Breaker replacedUnit awaiting new coil to be delivered DQSB/DQSQTwo issues with μ-switchesLack of sealing by IHEPComponent replacedProblem eliminated BCM switch powering moduleSpurious opening by slow release RR13 (S81) Most probably bad contact in ‘holding’ circuit Occurred twice, disappeared after dismounting / remounting Stopped beam injection until re-closing

All LHC systems’ circuit breakers ARE OBSELETE… Any new system means: R&D More for Semi-Conductor switches Less.. (but not negligible) for Electro-Mechanical Breakers Design of new systems on «Plug&Play» base for corrective maintenance 3-5 years before version “0”

Need to know Does the magnet really need external energy extraction? (parallel resistors as in corrector circuits) If so is crowbar resistor in power converter enough? (max voltage over power converter during by-pass!)

Need to know EE design parameters depends on a variety of different requirements Peak (ultimate) current & bi- or unipolar circuit Maximum stored energy Max time to open the switch (from conductive to isolation state) not including quench detection and verification (discrimination) time Max admissible heat dissipation in a quenching element (and by-pass) before and during switching of the current to the absorber and during the decay (t to open and circuit time constant during EE) the max admissible circuit voltage to ground at critical points in the circuit sufficient margin to avoid (or to provoke) quench back the max allowed cooling time of the absorber body (not only in the shadow of cryo-recovery!!) impact on the correct function and performance of various other elements in the circuit Sufficient power converter boost margin to cover semi-conductor switches (if chosen)