One Team One Vision With Pride The Association of Mine Surveyors of Zimbabwe AGM KARIBA 201 2 The Association of Mine Surveyors of Zimbabwe AGM KARIBA.

Slides:



Advertisements
Similar presentations
Railway Grade Separations Issues. Railway Grade Separations 1.Introduction Qualifications/experience to undertake bridge planning for railway grade separations:
Advertisements

ENERGY SAVING Product Offering COMPRESSOR MARKETING OPPORTUNITIES.
Other Analysis Techniques
Booster fan applications for sections in longwall and room-and-pillar mining Christopher Pritchard MS PE Acting Team Lead Ventilation Group Fires and Explosions.
VENTILATION FOR SINKING VERTICAL, SUB-VERTICAL AND DECLINE SHAFTS Derek Walters Turgis Consulting.
The Safe Working Practice of Changing Out a Raisebore Reaming Head Underground Eloise Copper Mine.
Preventative Heatstroke Cooling Shelter: ASHRAE Design Competition Andres Gomez Errick Santana Orangel Velazquez EML 4551 Ethics and Design Project Organization.
1 Booster Fans - Some considerations for their usage in underground coal mines S. Gillies, C. Slaughter, F. Calizaya and H. W. Wu 13th United States/North.
MBA (Trimester) Term V Module Title : Project Finance and Management
Case study – ventilation planning for Bog Zone, Lisheen Mine
MSIS 110: Introduction to Computers; Instructor: S. Mathiyalakan1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
Month Year Working together to achieve your desired outcomes, by delivering service excellence. Building Engineering Solutions for the optimisation of.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
1 STATUS REPORT JINR G. Shirkov, ILCW08, November 17, 2008.
©2003 Prentice Hall Business Publishing, Accounting Information Systems, 9/e, Romney/Steinbart 16-1 Accounting Information Systems 9 th Edition Marshall.
Poverty and Environmental Impacts of Electricity Price Reforms in Montenegro prepared by Dragana Radevic CEED, Montenegro Fourth Poverty Reduction Strategies.
Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Chapter 4 How Businesses Work.
Chemical Engineering Department
Saving Ventilation Dollars A Look at Economics of Ventilation.
Introduction ► This slide deck provides a suggested framework for the financial evaluation of an investment project. When evaluating any such project,
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 13 Energy Efficiency Module 13: SUPPLY-SIDE MANAGEMENT.
Chapter 4 How Businesses Work McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Week 11. DIAMOND One More Thing to Build Prepare a One-Line Diagram for the electrical energy needs of your mining operation For energy needs met with.
Steve Paulone Facilitator Financial Management Decisions The financial manager is concerned with three primary categories of financial decisions:  1.Capital.
Felipe Calizaya Miles Stephens 2010 UTILIZATION OF BOOSTER FANS IN UNDERGROUND COAL MINES Stewart Gillies Univ. of Utah, Salt Lake City, UT Missouri Univ.
Cryogenic cavern in Asian site Conceptual design of the cryogenic system Layout of the cryogenic plant for site A & B New layout of the cryogenic system.
Engaging with stakeholders: Adding value to the energy system 32nd Annual Conference of the International Association for Impact Assessment Porto Pedro.
Tom MAZOUR IAEA, Division of Nuclear Power
Chapter 4. Subsurface Ventilation Systems Mine Ventilation and Safety Jiangxi University of Science and Technology 1 Review for Last Classes 
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
Course guide on Food Plant Design and Pilot Demonstration (FST 409) University of Agriculture, Abeokuta Department of Food Science and Technology.
System Engineering & Economy Analysis Lecturer Maha Muhaisen College of Applied Engineering& Urban Planning.
Technical Analysis. Technical analysis of a project idea includes an in depth study of all technical aspects related to Technical analysis of a project.
BASICS IN IRRIGATION ENGINEERING 2.1. Planning Irrigation systems 2.2. soil-plant-water relation – over view 2.3. Crop water requirement 2.4. Base, delta.
© 2001 Change Function Ltd USER ACCEPTANCE TESTING Is user acceptance testing of technology and / or processes a task within the project? If ‘Yes’: Will.
FOOD ENGINEERING DESIGN AND ECONOMICS
Phare 2003 Sector: Economic and Social Cohesion Title: Water Supply and sewerage in tourism and resort settlements.
 2001 Prentice Hall Business Publishing, Accounting Information Systems, 8/E, Bodnar/Hopwood Systems Implementation, Operation, and Control Chapter.
CHEN 4470 – Process Design Practice Dr. Mario Richard Eden Department of Chemical Engineering Auburn University Lecture No. 2 – Contents of Reports January.
An Introduction to Transportation Systems
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Principles of Information Systems, Sixth Edition 1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
Introduction to IT investment decision-making Pertemuan 1-2 Matakuliah: A Strategi Investasi IT Tahun: 2009.
Week 10 ©2012 Dr B C Paul. Copper Your initial road moves have been questioned. –You have drawings showing the end of each stage –Between two of your.
Date Planning for Compliance with the Final 316(b) Phase II Regulations For APPA – March 8, 2004 David E. Bailey EPRIsolutions.
P ROJECT APPRAISAL Bhupendra Deshmukh. C ONCEPT OF PROJECT APPRAISAL Project appraisal means the assessment of project. Project appraisal is made for.
Investment Appraisal. A means of assessing whether an investment project is worthwhile or not Investment project could be the purchase of a new PC for.
HPMP PREPARATION EXCOM POLICY AND ELIGIBILITY ISSUES AND INFORMATION REQUIREMENTS.
Software Engineering Lecture # 1.
Power distribution and utilization Lecture 2 Instructor :Kashif Mehmood.
COAL MINE PROJECT OPPORTUNITY NALAIKH MINE POWER GENERATION AND HEATING PROJECT TSAGAAN SHONKOR HOLDING COMPANY NALAIKH DISTRICT, MONGOLIA OVERVIEW OF.
Global And China GSM Alarm Industry 2014 Market Research Report The report firstly introduced GSM Alarm basic information included GSM Alarm definition.
PROCESS DESIGN DEVELOPMENT
Johnson Controls, Inc. — 1 1/6 2/6 4/6 5/6 1/4 3/4 1/2 WAHOO PUBLIC SCHOOL SENIOR/JUNIOR HIGH & ELEMENTARY ENERGY PERFORMANCE CONTRACT FEASIBILITY March.
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
Accounting systems design & evaluation 9434SB 18 March 2002.
Systems Analysis Lecture 5 Requirements Investigation and Analysis 1 BTEC HNC Systems Support Castle College 2007/8.
© Goodheart-Willcox Co., Inc. Permission granted to reproduce for educational use only 1 UNIT 6 Fields, Careers, Work Skills.
Part 16 Technician’s Guide & Workbook for Duct Diagnostics and Repair
Fort Stanwix National Monument Energy Audit Contract
CLIC Civil Engineering Update
FCC Civil Engineering John Osborne, Jo Stanyard, Matt Stuart(SMB - Site Engineering - FAS Section) Cost & schedule Phase 3 - specification 10th May 2017.
Fundamentals of Information Systems, Sixth Edition
Initiating systems development
THE FEASIBILTY STUDY LECTURE-5.
CLINICAL INFORMATION SYSTEM
Introduction to Projects
Systems Analysis and Design
Economics for Engineers Economic Decision Making
Presentation transcript:

One Team One Vision With Pride The Association of Mine Surveyors of Zimbabwe AGM KARIBA The Association of Mine Surveyors of Zimbabwe AGM KARIBA Technical Paper Title: Mine Ventilation Up-grade Management Presentation by : Joshua Tigere Group Occupational Hygienis t

P RESENTATION O VERVIEW Definition of Mine Ventilation Up-grade Implication of Mine Ventilation Up-grade Need determination Role Of the Mine Surveyor Project justification Proposed Projects appraisal Practical example Conclusion

V ENTILATION UPGRADE – DEFINITION This refers to a change in the overall Mine Ventilation capacity usually resulting in a higher pressure and intake volumes. This can be achieved through various ways some of which are: Replacement of current main surface fans with bigger ones. Installation of additional Main fans and intake shafts Sinking of more intake airways to reduce overall mine resistance Upgrade of the mine refrigeration capacity in the case of ultra – deep mines

P ROJECT I MPLICATIONS Increased mine ventilation cost ( Purchasing of fans and ducting, Additional substation, Telemetry, increased electricity usage, security systems) More airways in most cases presenting heat management challenges in ultra-deep mines. Improved environmental conditions in the mine.

D ETERMINATION OF THE NEED FOR A VENTILATION UPGRADE The proposal should come from the initial Life of Mine Planning(LOMP) where the ventilation engineer spells out the stage by stage mine ventilation requirements in line with the development and production phases. In other unusual cases, it may be necessitated by a desire to vary the initial production and development plan either due to unforeseen geological challenges or other initiatives

R OLE OF THE MINE S URVEYOR The mine surveyor assist in taking the survey from underground and site the proposed vent raise positions on surface Assisting in siting of communication holes near the proposed raise bore sites Measurement of distances to proposed sites to assist in budgeting for power lines and roads to sites Alignment of machine on site prior to drilling

P ROJECT JUSTIFICATION A detailed write up should be generated spelling out the benefits of the up grade and reference must be made to the production and development needs that should be met. Issues to be considered include :  Overall mine Resistance and current Main fan duties  Current mine ventilation requirements  Projected mine ventilation requirements  State whether current system can/cannot meet the needs for the future  Present options for meeting the future ventilation requirements

P ROJECT A PPRAISALS Appraise the available project proposals to refine decision making. Options that can be considered include the following: Replacement of current main fans with bigger ones( in terms of fan duty) Fan Selection and duct size selection Raise-boring additional return shafts & Installation of additional main fans Raise-boring additional intake airways

V ENTILATION P ROJECTS A PPRAISAL The Total Owning cost (TOC) Approach is used to determine the overall cost of owning a project over its life at today’s value. This includes the capital costs involved in the scheme and the present value of any running costs involved in the scheme. The technique is applied to all proposed projects and the method assists in determining the most economic project to implement.

A N EXAMPLE OF A COMPARISON BETWEEN TWO PROJECTS Challenge A volume of 45m3/s is being delivered to a section through a 3m x 3m tunnel which is 800m long. The pressure drop is 320Pa. It has become necessary to increase the quantity from 45m3/s to 65m3/s. The following schemes are being considered:

S CHEME 1 Cost fan installation - $ Fan Efficiency - 72% Motor Efficiency - 94% Power cost per kw per year - $1100 Life Expectancy of Section - 16yrs Present Value of $1 per year over 16yrs is $6.97 at 12%

S CHEME 2 Widening the airway from 3m to 4m, the pressure drop would again be 320pa when the new quantity flows. The cost of increasing the airway size will be approximately $300/m3. assume that none of the above changes will affect the operating point of the main fans

Q UESTION Which is the most economical scheme?

S OLUTION ParameterScheme 1Scheme 2 Present value of Initial Capital Cost $ 160, 000(1x3x800)x300 = $ 720, 000 Duty of Booster Fan required = 348kpanil Present value of Fan running costs (33.4 x1200x 6.97) =$ nil T.O.C$ $ 720, 000

D ECISION M AKING From the above calculations, Scheme 1 is the most economical choice. In making deductions fro T.O.C calculations, the following needs to be taken into consideration prior to settling for an alternativ e;

C ONCLUSION A feasibility assessment of selected project given the available space, compatibility with existing infrastructure etc must be made prior to settling for an alternative. In other words the cheaper scheme is not always the best scheme. Practical considerations need to be made prior to making the final decision regards the best scheme to implement.

R OLE O F THE V ENTILATION E NGINEER FOR S UCCESSFUL V ENT UPGRADE PROJECT REQUIREMENTS Competency in basic airflow and fan Engineering calculations Knowledge of the cost of ventilation equipment to facilitate preparation of accurate budget for the upgrade project. Knowledge of the cost of electricity in the country of operation Mine ventilation planning knowledge Must be conversant with the mine development and production budgets. Must be conversant with present value tables and their application Have ready contacts for companies that supply vent equipment and the Raise bore drilling companies

T HE E ND Questions and comments