Activity Scheduling and Control

Slides:



Advertisements
Similar presentations
Operations Scheduling
Advertisements

Group 1 Ray Quintero, Lei Tian, Jiayin Liu, Morvarid Amirfathi, Rabeeh Sahranavard, Max Tubbs Production Control & Queuing.
Operations Scheduling
Scheduling.
© The McGraw-Hill Companies, Inc., 1998 Irwin/McGraw-Hill Module 11 Operations Scheduling Chapter 16 (pp ) Work Center and definitions  Objectives.
Operations Management For Competitive Advantage 1 Operations Scheduling Operations Management For Competitive Advantage Chapter 15.
Scheduling.
© The McGraw-Hill Companies, Inc., Chapter 16 Operations Scheduling.
Theory of Constraints Scheduling APICS PDM January 14, 2009.
Operations Scheduling
DOM 102: Principles of Operations Management Operations Scheduling
Short Term Scheduling Introduction What – Scheduling or timing of operations Where – Timing of operations affects the overall strategy Why – Reduce costs,
Short-Term Scheduling
Operations Management
Inputs and Outputs to Aggregate Production Planning
Scheduling Operations Management - 5 th Edition Chapter 16 Roberta Russell & Bernard W. Taylor, III.
MODELING AND ANALYSIS OF MANUFACTURING SYSTEMS Session 6 SCHEDULING E
22–1. 22–2 Chapter Twenty-Two Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Scheduling.
1 ISQA 459/559 Mellie Pullman Scheduling Shop Floor.
1 Chapter 15 Scheduling. 2 Scheduling: Establishing the timing of the use of equipment, facilities and human activities in an organization Answering “when”
Chapter 16: Learning Objectives
Operations Scheduling. Scheduling in a Process-Focused Environment.
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
Operations Management Contemporary Concepts and Cases Chapter Thirteen Scheduling Operations Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights.
Production Activity Control
1. Facility size 2. Equipment procurement Long-term
Copyright 2009, John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Scheduling Operations Management - 5 th Edition Chapter 17.
Scheduling.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
Thursday Night Operations Management Class 7. Chapter 14 Resource Planning.
15-1Scheduling William J. Stevenson Operations Management 8 th edition.
Aggregate Planning, MRP, and Short Term Scheduling 9 Aug 2001.
Production Activity Control
1 1 Slide Short – Term Scheduling Professor Ahmadi.
Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Scheduling Process and Production Management.
Topics To Be Covered 1. Tasks of a Shop Control Manager.
Operations Management Operations Scheduling
1 Slides used in class may be different from slides in student pack Chapter 19 Operations Scheduling  Work Center Defined  Typical Scheduling and Control.
Chapter 17 Scheduling. Management 3620Chapter 17 Schedule17-2 Overview of Production Planning Hierarchy Capacity Planning 1. Facility size 2. Equipment.
1 Manufacturing Operations Scheduling B2 [ ] B2 [ ] E5 [ E5 [ P9 [---] P9 [---] D1 [ D1 [
Scheduling. Definition of scheduling Establishing the timing of the use of equipment, facilities and human activities in an organization In the decision-making.
Scheduling. Scheduling: The allocation of resources over time to accomplish specific tasks. Demand scheduling: A type of scheduling whereby customers.
Scheduling for Low-volume Operations
CHAPTER SEVENTEEN SCHEDULING Chapter 17 Scheduling.
CHAPTER 4 : SCHEDULING Presented by: HAMKA BIN TAIP
Scheduling Operations IDS 605 Spring Data Collection for Scheduling l Jobs l Activities l Employees l Equipment l Facilities Transparency 18.1.
Chapter 16 & 9 Scheduling Work & Employees. Scheduling Outline What needs to be scheduled? –doctor’s office, restaurant, mfg. plant, hospital –employees.
© The McGraw-Hill Companies, Inc., Chapter 16 Operations Scheduling.
0 Production and Operations Management Norman Gaither Greg Frazier Slides Prepared by John Loucks  1999 South-Western College Publishing.
Scheduling.
Basics of Supply Chain Management
15 - 1© 2014 Pearson Education, Inc. Short-Term Scheduling PowerPoint presentation to accompany Heizer and Render Operations Management, Eleventh Edition.
Production Activity Control
Arnold, Chapman, & Clive: Intro Materials Management, 6 th ed. © 2008 Pearson Education, Upper Saddle River, NJ All Rights Reserved. Production.
Scheduling Operations
Manufacturing Planning and Control
Inputs and Outputs to Aggregate Production Planning
PRODUCTION ACTIVITY CONTROL (PAC)
CHAPTER 8 Operations Scheduling
Introduction to Materials Management
Production Activity Control
PRODUCTION ACTIVITY CONTROL (PAC)
Chap 11 Learning Objectives
Production and Operations Management
Flexible Assembly Systems
Manufacturing Planning and Control
Inputs and Outputs to Aggregate Production Planning
Presentation transcript:

Activity Scheduling and Control

Activity Scheduling & Control • Input: MRP Manufacturing Orders (MO’s) Subject to Capacity Constraints, Not Purchase Orders (PO’s) • Plans Hit the Real World (the Shop Floor)

Activity Scheduling & Control • Planning - Ensure Resources Available - Schedule Order Start & Completion Dates • Implementation - Gather Information Needed to Make Item - Dispatch (Release) Orders to Floor • Control (Feedback) - Rank Orders in Priority Sequence - Track Actual Performance vs. Plans - Monitor WIP, Queues, Lead Time, Etc. - Report Out – Input/Output Reports (p. 175)

Data Requirements - Planning • Item Master File: Part Numbers, Description, Lead Time, On Hand, On Order, Quantity Assigned to Work Center, Lot Sizes • Product Structure or Bill of Materials File • Routing File: Series of Operations Along with Resources Needed, Set Up, Run Times, Lead Times •Work Center Master File Work Center Number, Capacity, Shifts, Machine and Labor Hours Available, Efficiency, Utilization, Queue Time, Alternate Centers

Data Requirements - Control • Shop Order Master File (Each Order): Shop Order Number, Order Quantity, Quantity Completed, Quantity Scrapped, Material Issued, Due Dates, Priority, Balance Due, Costs • Shop Order Detail File (Each Operation): Operation Number, Setup Hours, Run Hours, Quantity Completed, Quantity Scrapped, Due Date or Lead Time Remaining

Types of Manufacturing/Service Systems • Intermittent (Job Shops) - Traditional - Work Cells • Flow (Assembly Lines) • Projects (SOM 466)

Job Shops • Design and Fabrication of Item Determines Job Shop Routing • Different Items Can be Produced at the Same Job Center – Requires Worker and Machine Flexibility • Design and Fabrication of Item Determines Job Shop Routing • Capacity Required at Each Work Center Depends on Mix of Products. Hard to Predict • Queues (Inventory) Results When Schedule Assigns too Many Jobs to Work Center – Throughput Times Generally Long

Job Shop Example

Work Cells • Intermediate to Job Shops & Assembly Lines • Group of Machines to Make Set of Parts • Minimizes Distances, Related Handling Costs • Minimizes Inventories

Work Cell Example

Work Cell Example

Scheduling in Job Shops and Work Cells • Forward Scheduling – Left to Right – Earliest Dates • Backwards Scheduling – Right to Left – Latest Dates • Infinite Loading – No Capacity Limits • Finite Loading – Capacity Limits • Operations Overlapping • Operations Splitting

Scheduling in Job Shops and Work Cells: Shop Floor Control Job Routing Red A(1), B (1), C (1) Green C (1), A (2) Purple B (1), A (1) Work Center 1 PM 2 PM 3 PM 4 PM A   B C R G G P Gantt Chart P R G R

Bottlenecks in Job Shops and Work Cells • Establish Inventory Buffer Before Bottleneck • Control Rate of Material Feed at Gateway Operation • Try to Increase Capacity of Bottleneck • Adjust Loads – Alternate Work Centers or Subcontract • Last Resort – Change Schedule • Use Goldratt’s “Theory of Constraints” (pp. 170-172)

Sequencing Rules in Job Shops and Work Cells • First – Come, First – Served (FCFS) • Earliest Due Date (EDD) • Earliest Operation Due Date (ODD) • Shortest Process Time (SPT) • Critical Ratio (CR) or Slack Rule CR = (Due Date – Present Date) / Lead Time Remaining Lowest CR Has Priority. CR < 1: Behind Schedule

Flow Manufacturing Assembly Lines • Allows Mass Production • Repetitive Production of Standardized Products • Standard Flow Minimizes Inventories • Routings are Fixed. Work Centers Depend on Routing. • Capacity Fixed by the Assembly Line

Assembly Line Example

Scheduling Assembly Lines: Assembly Line Balance Definitions: Task or Operation – Smallest Definable Unit of Work (Circle) Station – Work Area (Square) Cycle Time – Time Allowed to Do a Cycle of Work 1/(Production Rate)

Assembly Line Balance: Assign Tasks to Stations

Example: Problem 3.6 Task Follows Time (Sec.) A --- 25 B A 25 C A 20 D A 10 E B,C,D 15 F B,C,D 20 G E,F 10 Cycle Time = 35 Seconds

Assembly Line Balance Theoretical Minimum Stations = Sum of Task Times / Cycle Time = 125 / 35 ≈ 4 Idle Time = (Stations X Cycle Time) - Sum of Task Times = (4 X 35) – 125 = 15

Assembly Line Balance: Assign Tasks to Stations D B C E F G Idle: 0 + 10 + 0 + 5 = 15

Assembly Line Balance Nightmare Task Time(s)  Cycle Time Solutions: - Divide Task - Decrease Task time - Increase Cycle Time - Parallel Stations