Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee December 5, 2002.

Slides:



Advertisements
Similar presentations
QSE Managers Working Group Meeting Notes 9 April, 2010 Report to WMS 21 April, 2010 David Detelich - Chairperson.
Advertisements

1 Appeal to ERCOT Board Regarding Use of Fuel Oil Index Price (FOIP) Larry Gurley TXU Wholesale June 19, 2007.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee February 7, 2008.
TAC July 2, 2003 Market Design Implementation Process Recommendation.
1 Non-Transmission Alternatives to Reduce Local Congestion Costs Bill Bojorquez June 3, 2004.
April 15, TAC Report to the ERCOT Board April 15, 2003.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee September 7, 2006.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 8, 2008.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
TAC Report to the ERCOT Board November 16, Summary Notifications:Notifications: –Operating Guide Revisions –Retail Market Guide Revisions –Annual.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 4, 2006.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee June 4, 2009.
Presentation to WMS Regarding PRR 731- Fuel Oil Index Price (FOIP) Larry Gurley July 18, 2007.
March 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott April 7, 2015 TAC Update to RMS 1.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee March 4, 2010.
PRS - RPRS Task Force Status Summary - August 14, PRS RPRS Task Force Status Summary Prepared for WMS and PRS August 2006.
QSE Managers Working Group Meeting Notes 7 November, 2008 Report to WMS 19 November, 2008 David Detelich - Chairperson.
RPRS ERCOT System Wide Insufficiency Charge Presented at the Technical Advisory Committee June 1, 2006.
A Strawman for Discussion by Dottie Stockstill & Greg Ramon Special ERCOT Board Meeting June 24, 2003.
Report to TAC August In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG (No report) DSWG (No report) MCWG MCWG MWG (No report)
Protocol Revision Subcommittee Sandy Morris November 3, 2011.
December 18, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott January 6, 2015 TAC Update to RMS 1.
1 WMS Report TO TAC January In Brief Two Working Group Reports Two Working Group Reports Two Task Force Reports Two Task Force Reports One PRR.
Reconfiguring Nodal Stakeholder Participation Presentation to the ERCOT Technical Advisory Committee Texas Nodal Transition Planning Task Force February.
1 TAC Report to the ERCOT Board June 21, TAC Summary 8 PRRS 8 PRRS Withdrawal of PRR 552 Withdrawal of PRR 552 Potomac Recommendations Potomac.
RMR Task Force Decision Points for ERCOT Technical Advisory Committee April 3, 2003.
Unit-Specific Bid Limits based on Modified Generic Cost.
1 TAC Report to the ERCOT Board February 21, 2006.
1 Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 12, 2006.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 4, 2007.
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee October 9, 2003.
RPRS TF and QSE Managers Report to PRS 1)Procurement (QSE Managers) 2)Cost Allocation (RPRS Task Force) –PRR 674 –PRR 676 –PRR 678.
Item 3: PRS Report John Varnell 2013 PRS Chair Technical Advisory Committee (TAC) Meeting ERCOT Public November 7, 2013.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 8, 2008.
1 TAC Report to the ERCOT Board February 16, 2005.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee February 2, 2006.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 6, 2010.
PRR Impact Analysis Update Steve Wallace Program Management Office October Board Meeting.
Feb 18, TAC Report to the ERCOT Board February 18, 2003.
1 Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 6, 2004.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee October 6, 2006.
Technical Advisory Committee Presentation to the ERCOT Board of Directors March 21, 2007.
Report to TAC July In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG DSWG MCWG MCWG MWG MWG QMWG QMWG VCWG VCWG Task Forces Task.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee November 2, 2006.
1 WMS Report TO TAC April In Brief Two Working Group reports Two Working Group reports Two Task Force Reports Two Task Force Reports BENA presentation.
QSE Managers Working Group Report to WMS, April 8, 2011 S. Looney, Luminant.
PRS RPRS Task Force Report from July 27 th Meeting Special PRS Meeting August 2, 2006.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee October 1, 2009.
Frequency Control Task Force Presentation to the ERCOT Technical Advisory Committee June 1, 2006.
Role of Account Management at ERCOT 2006 TAC Subcommittee Review ERCOT Board February 21, 2006.
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee September 4, 2003.
1 TAC Report to the ERCOT Board November 14, 2006.
Protocol Revision Subcommittee Tom Burke April 5, 2012.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee September 3, 2009.
NPRR 649 Board Appeal Koch Ag & Energy Solutions February 9,
OOMC and Local RPRS Settlement Alignment January 2007 WMS Meeting Ino Gonzalez ERCOT Settlements.
1 Project Prioritization Review May 14, Approved Revision Requests “Not Started” – Planned to Start in Future Months Revision Request Target Start.
11/3/2011 Technical Advisory Committee TAC Update Kyle Patrick.
2004 CSCs & Zones. Goals for 2004 Increase ERCOT market efficiency Reduce out-of-merit energy and capacity deployments Reduce uplift of local congestion.
Presentation to the ERCOT Technical Advisory Committee July 1, 2010.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
Jan 22, TAC Report to the ERCOT Board January 22, 2003.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 7, 2009.
Protocol Revision Subcommittee Tom Burke November 29, 2012.
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
Protocol Revision Subcommittee
TAC Report to the ERCOT Board
TAC Report to the ERCOT Board
Presentation transcript:

Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee December 5, 2002

PRS Report Overview 5 Protocol Revisions for TAC approval5 Protocol Revisions for TAC approval 1 PRR for Urgent Status1 PRR for Urgent Status 2 PRRs rejected2 PRRs rejected 3 System changes placed “at risk”3 System changes placed “at risk” RMR Task Force ReportRMR Task Force Report

PRR 342 – AS Simultaneous Selection Procedural HistoryProcedural History –Originally recommended to TAC for approval at July, 2002 meeting –PUC MOD requested that no action be taken in order to address new issues –New issues were discussed with WMS –PUC MOD now requests submittal of original PRR for approval

PRR 342 – AS Simultaneous Selection Requires ERCOT to procure RegUp, Responsive and Non-Spinning Reserves using a simultaneous selection process to minimize overall costsRequires ERCOT to procure RegUp, Responsive and Non-Spinning Reserves using a simultaneous selection process to minimize overall costs Complies with PUC Protocol OrderComplies with PUC Protocol Order Effective Date based on project scheduling—Needs PriorityEffective Date based on project scheduling—Needs Priority

PRR 357 – Revision to Market Solution Definition PRR attempts to clarify the Market Solution definitionPRR attempts to clarify the Market Solution definition –Requires independent bidding –Adds examples of where a market solution does not exist –Includes ERCOT process for applying the Market Solution definition to local congestion Market Participant affiliate relationships will continue to be manually verifiedMarket Participant affiliate relationships will continue to be manually verified

PRR 359 – Improve Resource Plan Requires QSEs to submit High and Low Operating Limits in Resource PlanRequires QSEs to submit High and Low Operating Limits in Resource Plan Requires QSEs to update Resource Plans to show Resource status changesRequires QSEs to update Resource Plans to show Resource status changes Priority 2.2Priority 2.2 Effective Date pending project start dateEffective Date pending project start date

PRR 372 – QSE Back-Up Plan Requirement Changes Protocols to require QSEs and TDSPs to comply with back-up plan requirements in the ERCOT Operating GuidesChanges Protocols to require QSEs and TDSPs to comply with back-up plan requirements in the ERCOT Operating Guides –OGRRs 119 & 120 detail the back-up plan requirements No System Impact to ERCOTNo System Impact to ERCOT Effective Date—January 1, 2002Effective Date—January 1, 2002

PRR 373 – Define OOME as an Instructed Deviation Applies to OOME instructions issued prior to BES clearingApplies to OOME instructions issued prior to BES clearing –Still uninstructed after BES clearing ERCOT must honor unit ramp rates shown on QSE’s Resource PlanERCOT must honor unit ramp rates shown on QSE’s Resource Plan Priority 2.1Priority 2.1 Effective Date pending analysis and project startEffective Date pending analysis and project start

Urgent PRR PRR 371 –Minimum Energy OOME When an OOMC Instruction is IssuedPRR 371 –Minimum Energy OOME When an OOMC Instruction is Issued –PRS requested data from ERCOT regarding the number of disputes by generators –PRS also received comments to be considered by QSEPMWG prior to next PRS meeting –Urgent status maintains same timeline as the PRR was on but allows time for more analysis

Rejected PRRs PRR 364 – RPRS Payment & Charge CalculationPRR 364 – RPRS Payment & Charge Calculation –Was not reviewed by WMS PRR 365 – Replace “Resource Specific Premium Bid” with “Price Bid”PRR 365 – Replace “Resource Specific Premium Bid” with “Price Bid” –Proposed revisions made to subsequently amended language –Require resubmittal to ensure no conflicts with current language

“At Risk” System Changes Adoption of PRRs 342, 359 and 373 may “bump” the following projects to lower priorityAdoption of PRRs 342, 359 and 373 may “bump” the following projects to lower priority –Implement GISB 1.6 Transport (SCR717) –Modify AS Performance and Frequency Control Algorithms –XML Data for QSEs (SCR 721) PRS and ERCOT must assess Market/ERCOT projects to make final determinationPRS and ERCOT must assess Market/ERCOT projects to make final determination

TAC Action Consider PRRs for approvalConsider PRRs for approval Approve “Urgent Status” for PRR 371Approve “Urgent Status” for PRR 371

Reliability Must-Run (RMR) Task Force Report to ERCOT Technical Advisory Committee December 5, 2002

Housekeeping Reliability Must-Run exploder is:Reliability Must-Run exploder is: ‘1 RMR ‘1 RMR – Isabel Flores to be added to the list

RMR TF Objectives Review Existing OOM and RMR ProtocolsReview Existing OOM and RMR Protocols Determine Issues that Need to be AddressedDetermine Issues that Need to be Addressed Evaluate Alternatives to Existing OOM and RMR ProtocolsEvaluate Alternatives to Existing OOM and RMR Protocols Recommend Protocol Revisions to PRSRecommend Protocol Revisions to PRS Complete Task Prior to 2Q03 RMR Contract SigningsComplete Task Prior to 2Q03 RMR Contract Signings

WHY OOM & RMR? Units In Market MarketLocalCongestion Solved Solved Units NOT NOT In Market In Market RMR Integrated ERCOT Tools To Resolve Local Congestion

Externalities To Date Outstanding Protocol Revision RequestsOutstanding Protocol Revision Requests –Board Task Force on PRR 370 (RMR Issues) –Changes to OOM compensation (e.g., 371) PUC Docket appealing prior Protocol RevisionsPUC Docket appealing prior Protocol Revisions

Meeting Results Two meetings held since TAC assignmentTwo meetings held since TAC assignment –ERCOT provided background on OOM and RMR use and pricing –Determined six RMR issues to be resolved –Determined and discussed, at length, three global questions concerning RMR –Developed general work plan

Six Issues to be Resolved Economic Trade-OffsEconomic Trade-Offs (RMR v. OOM v. BENA v. Transmission)(RMR v. OOM v. BENA v. Transmission) Transmission Planning ProcessTransmission Planning Process Cost AllocationCost Allocation Criteria/ProcessCriteria/Process RMR CategoriesRMR Categories Compensation LevelCompensation Level (Actual v. Proxy)(Actual v. Proxy)

Global Issues Does ERCOT have the right reliability tools in OOM and RMR?Does ERCOT have the right reliability tools in OOM and RMR? How should ERCOT separate economic and uneconomic units for RMR?How should ERCOT separate economic and uneconomic units for RMR? What is the “exit strategy” to RMR?What is the “exit strategy” to RMR?

RMR TF Work Plan Next Meeting – December 13, 2002Next Meeting – December 13, 2002 –Solicited strawdogs that apply to the six issues to be resolved based on discussion of global questions January, Discuss and develop conceptsJanuary, Discuss and develop concepts February, 2003 – Finalize recommendations for PRS/TACFebruary, 2003 – Finalize recommendations for PRS/TAC