ERCOT TAC11/2/2006 1 CREZ Study Update ERCOT TAC 11/2/2006.

Slides:



Advertisements
Similar presentations
1 Overview of ACC BTA Order and Planned Utility Response Process Arizona Corporation Commission Fifth Biennial Transmission Assessment Commission Decision.
Advertisements

March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
Connection of Wind Farms to Weak AC networks – ERCOT Experience and Challenges Shun-Hsien (Fred) Huang ERCOT System Planning CIGRE WG B4.62 Meeting June.
Economic Criteria for Transmission Planning in the ERCOT Region Public Utility Law Seminar DeAnn Walker August 3, 2012.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
System Strength Discussion
January 5, 2012 TAC Cross Valley 345 kV Project Jeff Billo Manager, Mid-Term Planning.
Technical Advisory Committee December 6, 2010 Summary of the CREZ Reactive Study Warren Lasher Manager, Long-Term Planning and Policy.
The Status Of The Electric Grid In ERCOT The Electric Reliability Council Of Texas Sam R. Jones, P.E. ERCOT – Retired As a retiree of ERCOT this presentation.
How Winds are Created The earth’s winds are caused by pressure differences across the earth’s surface due to uneven heating Local Winds: During the day.
Tres Amigas Presentation Team
Economic Analyses of FPL’s New Nuclear Projects: An Overview Dr. Steven Sim Senior Manager, Resource Assessment & Planning Florida Power & Light Company.
1 The Effects of Integrating Wind Power on Transmission System Planning, Reliability, and Operations Phase 1 Preliminary Overall Reliability Assessment.
THE TRES AMIGAS SUPERSTATION Southwest Renewable Energy Conference Santa Fe, NMSeptember 16 th 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
Wind Power and the CREZ Case: What’s Decided, What’s Not, What’s Next Patrick R. Cowlishaw Jackson Walker LLP SBOT Public Utility Law Section August 15,
Intermittent Resources and Demand Response Integration 2007–2016 Long-Term Reliability Assessment Workshop Bill Bojorquez VP, System Planning August 16,
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
Long Term Study Task Force Update Transmission Study Practices and Methodologies April 5th,2011 LTS.
Oregon Renewable Energy Action Plan April 2005 with Geothermal Energy highlights by Carel DeWinkel Senior Policy Analyst.
Managing West Texas Wind SWEDE 2008 Conference May 2, 2008 Presented by Paul Hassink AEPSC Texas Transmission Planning.
10/03/ Report on Existing and Potential Electric System Constraints and Needs Within the ERCOT Region October 3, 2002.
April 16, 2010 RPG Meeting ERCOT Five-Year Transmission Plan Update Jeff Billo.
McCAMEY 345 kV TRANSMISSION PLAN Presentation to Technical Advisory Committee May 8, 2003 KENNETH A. DONOHOO, P.E. Manager, System Planning Transmission.
Renewables and Transmission Task Force Report to WMS March 20, 2007.
Using a Dispersed Strategy in Your Region By Mike Michaud Matrix Energy Solutions Edited and Presented By Brian Antonich Windustry.
Texas Wind Energy American Meteorological Society Summer Community Meeting – Norman Oklahoma Henry Durrwachter, P.E. August 12, 2009.
LAREDO PLANT RMR EXIT STRATEGY Presentation to Board of Directors March 16, 2004 Transmission Services Operations.
Topics  Renewable Energy  Electricity prices and retail competition  TXU Acquisition  Legislative Session.
R E T I Coordinating Committee California’s Renewable Energy Transmission Initiative: Status Update California Public Utilities Commission California Energy.
April 16, 2010 RPG Meeting Lamesa Area Upgrades ERCOT Independent Review Jeff Billo.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
Reliable Power Reliable Markets Reliable People Hanna Region Transmission Development Ramaiah Divi, P.Eng Manager, Central System Planning.
May 11, 2012 RPG meeting YTP Scope and Process – RPG Comments.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
TAC02/01/2007 DW 1 TAC Briefing on: - Report on Constraints and Needs: Five Year Plan Development - Long Term System Assessment (LTSA) - Entergy Integration.
SPP.org 1. Final Report: Reliability and Economic Assessments Stakeholder Meeting December 1, 2008 Austin, TX.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
© 2000 PACIFICORP kV LINE WALLA WALLA – WALLULA – Mc NARY 500 kV LINE HEMINGWAY – CAPTAIN JACK – REGIONAL PLANNING MEETING REGIONAL PLANNING PROJECT.
ERCOT Independent Review
Long Term Study Transmission Results May 21 st, 2013.
Long Term Study Resource Expansion Process: Study Findings and Lessons Learned Jenell Katheiser Doug Murray RPG May 21, 2013.
RPG: September 24, Long-Term System Assessment Introduction Jeff Billo, Manager, Transmission Planning September 2013 Regional Planning Group.
ERCOT Public 1 Project Panel 1 Dan Woodfin Director, System Operations August 15, 2014.
3/28/2008 RPG CREZ Meeting CREZ Transmission Optimization (CTO) Study And The Oscar Goes To… Warren Lasher Manager, System Assessment.
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
Panhandle Renewable Energy Zone (PREZ) Study
May14, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
POWER SYSTEM PLANNING CHARTER AND PROCESSES Presentation to TAC May 6, 2004 Transmission Services Ken Donohoo, Manager of System Planning Dan Woodfin,
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
Capacity, Demand and Reserves Report Bill Bojorquez Board of Directors Meeting May 16, 2007.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
August 24, 2007 ERCOT Regional Planning Group Meeting CREZ Transmission Optimization Study Warren Lasher System Assessment.
December 14, 2007 RPG - CREZ Meeting CREZ Transmission Optimization Study: Update Warren Lasher ERCOT System Assessment.
The following slides provide information about integrating wind energy into the electricity grid. Photo by Dennis Schroeder, NREL 25907NREL
June 11, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
Congestion Management Work Group 2008 Overview CMWG Marguerite Wagner, Reliant Energy Inc.
R ENEWABLE E NERGY IN T EXAS Jess Totten Public Utility Commission of Texas 1.
Ken McIntyre VP Grid Planning and Operations Dan Woodfin Director, System Operations Warren Lasher Director, System Planning Planning and Operations Overview.
RPG - 10/12/2007 Competitive Renewable Energy Zones (CREZ) Update Bill Bojorquez Vice President, System Planning.
Interconnecting Wind & Solar Energy in Texas
ERCOT 2009 Five-Year Transmission Plan Update
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
Warren Lasher Manager, Long-Term Planning and Policy
Modifications to Planning Charter
Intermittent Resources and Demand Response Integration 2007–2016 Long-Term Reliability Assessment Workshop Bill Bojorquez VP, System Planning August.
Reliability Assessment Committee Reliability Workshop Priorities
Transforming Scenario Narratives into Study Cases
Presentation transcript:

ERCOT TAC11/2/ CREZ Study Update ERCOT TAC 11/2/2006

ERCOT TAC11/2/ Legislative Requirements Section (g) The (Public Utility) commission, after consultation with each appropriate independent organization, electric reliability council, or regional transmission organization: (1) shall designate competitive renewable energy zones throughout this state in areas in which renewable energy resources and suitable land areas are sufficient to develop generating capacity from renewable energy technologies; (2) shall develop a plan to construct transmission capacity necessary to deliver to electric customers, in a manner that is most beneficial and cost-effective to the customers, the electric output from renewable energy technologies in the competitive renewable energy zones

ERCOT TAC11/2/ JFMAMJJASOND Reports/ Approvals Transmission Studies ERCOT Study Process and Timeline Wind Ancillary Services Study CREZ Rule Development CREZ Determination ERCOT PUCT Stakeholder Input on CREZs Wind Potential/Characteristics Study 1Q 2007

ERCOT TAC11/2/ Potential Wind Resource ERCOT contracted with leading wind consultant AWS Truewind to identify areas with best wind resource potential AWS identified highest CF 100MW sites and clustered into 25 areas Identified 4000MW of highest CF sites in each area (shown on map) –Approximate wind capacity potential(in MW) with >35% capacity factor in each area is shown

ERCOT TAC11/2/ Wind Data AWS used complex meteorological and terrain model that provided localized prediction of wind patterns and resulting wind power output each site Typical generation output for each site is provided as a time series of 8,784 hourly data points (one leap-year of data).

ERCOT TAC11/2/ Current Wind Development 2,508MW In Service 16,523MW In Interconnection Process RPG initiated study of transmission upgrades needed if nearly 5000MW is in-service by EOY 2007 –~3250MW existing and signed IAs –~1600MW proxy for additional IAs in 2007

ERCOT TAC11/2/ MW Wind Upgrades Developed plan to relieve most curtailment associated with ~5000MW wind assumption (based on steady state analysis) –Includes opening lines, phase shifters, some line/auto upgrades, and a new 345kV station –See Update #4 under Year Plan folder on Planning website for details Dynamic study is underway, but not yet complete

ERCOT TAC11/2/ CREZ Analytical Process Base Case is the 2009 Case from the 5-Year Plan –Latest Validated Case when CREZ Analysis Process Began –Contains 4,850 MW of Installed Wind Capacity Overall Strategy – to develop incremental transmission solutions that are part of an overall design –No large steps and no regrets We evaluated constraints on 69 kV and 138 kV lines, but focused on 345 kV (in some cases 765 kV) solutions

ERCOT TAC11/2/ Other Considerations/Caveats Transmission solutions presented here are the result of extensive what-if analyses, followed by iterations (and iterations) of economic modeling and power-flow studies –Over 60 different configurations evaluated for the McCamey area alone Due to responsive reserves on the system, we limited the flow on radial lines to a maximum of 1,500 MW Transmission studies were conducted primarily using thermal (DC) analysis Other system considerations that will need to be addressed –Voltage Stability –Dynamic Stability –Ancillary Services

ERCOT TAC11/2/ Network Upgrades From the perspective of network upgrade needs, there are generally three sets of CREZs 1.Coastal (Area 24) 2.Mc Camey Area (Areas 5&6) 3.Abilene Area (Areas 9,10,12 &14) 4.Panhandle (Areas 2 & 4) Will show a few options from each area as examples

ERCOT TAC11/2/ Coastal Zone (CREZ 24): 1,000 MW Solution Cost: $15M System Fuel Savings: $140M

ERCOT TAC11/2/ Coastal Zone (CREZ 24): 3,000 MW Solution Cost: $320M System Fuel Savings: $390M

ERCOT TAC11/2/ McCamey Area (CREZ 5 and 6): Wind Resources

ERCOT TAC11/2/ McCamey Area (CREZ 5 and 6): 1,500 MW Solution Cost: $365M System Fuel Savings: $200M

ERCOT TAC11/2/ Wind Curtailment Analysis

ERCOT TAC11/2/ McCamey Area (CREZ 5 and 6): 4,000 MW Solution Cost: $850M System Fuel Savings: $520M

ERCOT TAC11/2/ Central Western Texas (CREZ 9, 10, 12, 14): 1400 MW Total Capital Cost: $350M Annual System Fuel Savings: $215M/yr

ERCOT TAC11/2/ Panhandle (CREZ 2 and 4): 1,800 MW Total Capital Cost: $645M (Zone 2) Annual System Fuel Savings: $260M/yr

ERCOT TAC11/2/ Next Steps Presentations from 10/30 RPG meeting available under RPG Combined Interest folder at Comments due by noon 11/6 Some additional analysis will be performed based on RPG comments and to evaluate other combinations Detailed report due to PUCT by 12/1