David Moser USACE Chief Economist

Slides:



Advertisements
Similar presentations
Risk Analysis The Fundamentals and Applications K. Subramaniam, Lecturer (Envt.Health) & Safety Faculty of Health Science, UiTM Jpuncak Alam.
Advertisements

Flood Risk Analysis – the USACE Approach
Risk Analysis Fundamentals and Application Robert L. Griffin International Plant Protection Convention Food and Agriculture Organization of the UN.
Implementing information on the costs and benefits of adaptation in a portfolio –based decision framework Alistair Hunt Department of Economics, University.
David Purkey, SEI Rob Lempert, RAND
Relevant, Ready, Responsive, Reliable Flood Risk Management and the U.S. Army Corps of Engineers Actions for Change David Moser 1, Martin Schultz 2, Todd.
F4B - 1 BU ILDING STRONG SM Flood Damage Reduction Module F4: Reformulation – Optimization, Incremental Analysis and Selection of the NED Plan.
2013 Northwest Hydro Operators Forum 1 Risk-Informed Decision Making – FERC Perspective David Lord, P.E., D2SI Dam Safety Risk team – Portland, Or Natural.
Project Management Risk Management. Outline 1.Introduction 2.Definition of Risk 3.Tolerance of Risk 4.Definition of Risk Management 5.Certainty, Risk,
Risk and Uncertainty The failure of the Teton Dam during initial filling of the reservoir on June 5, 1976 killed fourteen people and caused hundreds of.
PAVEMENT MANAGEMENT SYSTEMS OVERVIEW Lecture 2. n Provide a historical perspective of the evolution of PMS over the last 20 years n Describe the basic.
“ Building Strong “ Delivering Integrated, Sustainable, Water Resources Solutions Integrated Risk Management Charles Yoe, PhD Institute.
COMPREHENSIVE FLOODPLAIN MANAGEMENT : Promoting Wise Uses of Floodplains CA Department of Water Resources/ CIFMCG Workshop July 2006.
Implementation, Adoption, and Stakeholder Perspectives Peter J. May University of Washington PEER Summative Meeting – June 13, 2007.
“ Building Strong “ Delivering Integrated, Sustainable, Water Resources Solutions Integrated Risk Management Institute for Water Resources 2010.
PEER Summative Meeting 13 June 2007 Implementation, Adoption, and Stakeholder Perspectives Peter J. May University of Washington.
1 Measuring Performance of Resource Management Responses Rich Juricich (DWR) David Groves (RAND)
Pilot Risk-Ranking Model to Prioritize Manufacturing Sites for GMP Inspections Advisory Committee for Pharmaceutical Science Manufacturing Subcommittee.
Stephane Larocque – Consulting Practice Leader, Impact Infrastructure A DECISION MAKING FRAMEWORK FOR SUSTAINABLE INFRASTRUCTURE DEVELOPMENT 1 ST INTERNATIONAL.
1 Building Strong! THE ECONOMIST’S ROLE Ken Claseman Senior Policy Advisor for Economics Office of Water Project Review HQUSACE
Ecosystem Restoration Module ER4: Cost Effectiveness/Incremental Cost Analysis and the NER Plan BU ILDING STRONG SM.
Role and Components of Project Evaluation
Environmental Impact Assessment (EIA): Overview
State Smart Transportation Initiative October 9, 2014 Matthew Garrett Oregon DOT Director Erik Havig Oregon DOT Planning Section Manager.
1 Technological Innovations and Future Vision of Technical Support Louisiana Coastal Protection and Restoration and Mississippi Coastal Improvements Program.
Normative Criteria for Decision Making Applying the Concepts
BUILDING STRONG SM Plan Formulation: General Module G-1: What is plan formulation?
“ Building Strong “ Delivering Integrated, Sustainable, Water Resources Solutions Scenario Planning Charles Yoe, PhD Alaska District.
Module 11 STEPS 4 & 5 Conduct Reconnaissance Study & Report Certification Civil Works Orientation Course - FY 11.
Roles of Economists and New Analytical Requirements
Traditional Planning It’s largely deterministic It’s largely deterministic Process relies on a single most likely alternative future forecast Process.
US Army Corps of Engineers BUILDING STRONG ® STEP FIVE: COMPARE ALTERNATIVE PLANS Planning Principles & Procedures – FY11.
Plan Formulation for Deep Draft Harbors Navigation Measures.
“ Building Strong “ Delivering Integrated, Sustainable, Water Resources Solutions 1 What is Engineering Risk and Reliability? Why We Use It? Robert C.
1 Environmental Planning in the Army Corps of Engineers Ch 2 Mod 5 Relationship of the NEPA to Principles & Guidelines
Introduction A GENERAL MODEL OF SYSTEM OPTIMIZATION.
System Engineering & Economy Analysis Lecturer Maha Muhaisen College of Applied Engineering& Urban Planning.
2013 NWHA CONFERENCE FERC’S RISK-INFORMED DECISION MAKING Doug Johnson – Regional Engineer - Portland From PFMA to Risk Assessment.
Integrated Risk Management Charles Yoe, PhD Institute for Water Resources 2009.
Welcome To: PCC4: Economic Analysis In Planning U. S. Army Corps of Engineers Planners Core Curriculum.
Welcome to Session 3 – Project Management Process Overview
IIHR Seminar (December ) KYUTAE LEE. 1. The need for assessing Flood Risk? 2. Risk analysis/assessment – general overview 3. Issues in current practice.
Module 3 Risk Analysis and its Components. Risk Analysis ● WTO SPS agreement puts emphasis on sound science ● Risk analysis = integrated mechanism to.
STRATEGIC ENVIRONMENTAL ASSESSMENT METHODOLOGY AND TECHNIQUES.
Ch 10 - Risk Management Learning Objectives You should be able to: List and describe risk management processes, inputs, outputs, and tools List and describe.
Integrated Risk Management Charles Yoe, PhD Institute for Water Resources 2009.
Dr. Richard Palmer Professor and Head Department of Civil and Environmental Engineering University of Massachusetts Amherst.
“ Building Strong “ Delivering Integrated, Sustainable, Water Resources Solutions Risk-Informed Decision Making Charles Yoe, PhD Institute.
Chapter 6 DECISION MAKING: THE ESSENCE OF THE MANAGER’S JOB 6.1 © 2003 Pearson Education Canada Inc.
Risk Analysis for Major Rehabilitation. Major Rehabilitation Background  Prior to FY 1992  Funded under Operation and Maintenance, General, Appropriation.
1 An Approach to Levee Assessment and Contingency Planning Presentation to the National Waterways Conference 7 September 2006 Portland, Oregon By Rob Vining.
The Contemporary Language of Risk Analysis AFC Theme 2 Risk Technology Workshops.
US Army Corps of Engineers BUILDING STRONG ® Overview of Risk Approach to Manage USACE Dam and Levee Safety Program The Reality of Risk: Dam Safety in.
“ Building Strong “ Delivering Integrated, Sustainable, Water Resources Solutions The Contemporary Language of Risk Analysis Campaign Goal 2a Risk Technology.
Forecasting for Water Resources Planning. Learning Objective(s):  The student will:  Understand the need for forecasts.  Be able to describe what a.
S ystems Analysis Laboratory Helsinki University of Technology 1 Decision Analysis Raimo P. Hämäläinen Systems Analysis Laboratory Helsinki University.
AGEC 407 Risk Goals: 1.Convey an understanding of what is meant by risk 2.Describe the different types and sources of risk in agricultural production 3.Demonstrate.
US Army Corps of Engineers PLANNING SMART BUILDING STRONG ® SMART PLANNING TO SUPPORT FLOOD RISK MANAGEMENT USACE Flood Risk Management and Silver Jackets.
MEKONG RIVER COMMISSION RIVER BASIN PLANNING - MODULE 1 INTRODUCTION Can Tho, Vietnam January 2003 Refining Objectives and Developing Scenarios.
Mark Ames The Insured's Perspective: Risk Retention as an Investment Decision Friday, March 11, 2004 Insurance and Value Creation.
Kristin Gilroy, PhD International Center for Integrated Water Resources Management 24 February 2016 Climate Risk Informed Decision Analysis: Bridging the.
US Army Corps of Engineers BUILDING STRONG ® Step 6: Selection Of The Recommended Plan Planning Principles & Procedures – FY11.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
Environmental Planning in the Army Corps of Engineers Relationship of the NEPA to Principles & Guidelines 1 Ch 2 Mod 5
Approaches to quantifying uncertainty-related risk There are three approaches to dealing with financial and economic risk in benefit-cost analysis: = expected.
Economic Analysis in the Public Sector Benefit/Cost Analysis.
US Army Corps of Engineers BUILDING STRONG ® Levee Safety Policies Supporting a Sustainable Flood Risk Management Program Eric C. Halpin, PE Special Assistant.
Strategic Information Systems Planning
PRINCIPLES & GUIDELINES
Air Carrier Continuing Analysis and Surveillance System (CASS)
Presentation transcript:

David Moser USACE Chief Economist Incorporating Risk and Reliability into Decisions: Risk-informed Decision Making David Moser USACE Chief Economist

Risk in Planning It’s largely deterministic Process relies on a single most likely alternative future forecast Desire for single right answer Often anchored in present Adversarial--legitimate differences in views of uncertain future

Risk in Planning Principles and Guidelines Economic efficiency of investment decision approach Choose the plan that most reasonably maximizes net NED consistent with protecting environment Identify and describe areas of risk and uncertainty to provide knowledge of the degree of reliability of the estimated benefits and costs and of the effectiveness of alternative plans.

Risk Guidance in P&G Assumption that risk arises from benefits and costs Economic risk No explicit consideration of human health and safety or other non-monetary risks Only inferential in flood damage reduction Number of units by activity

Traditional Response to Risk Risk management guidance embedded within engineering design guidance Risk presumed to be “managed” by engineering design Freeboard on levees and dams Factors of safety Underkeel clearance design criteria Channel width design criteria Probable maximum flood spillways

Traditional Risk Management Manage risk to increase certainty of engineering performance Presumption that increased certainty only added to costs No addition to benefits Viewed as necessary to achieve claimed benefits

Traditional Risk Management Risk management was implied attempt to provide some level of assurance of project performance Value of assurance not quantified Risk assessment and risk management bundled within engineering Viewed as technical decision

Modern View of Risk Management Needs to be separate from risk assessment Answers the question what should be done about the risk Incorporate issues of effectiveness, cost, and generally opens decision Attempts to determine the best way of addressing the risk

Existing Corps Risk Policies ER 1105-2-100—Planning Guidance Notebook The planner's primary role in dealing with risk and uncertainty is to characterize to the extent possible the different degrees of risk and uncertainty and to describe them clearly so that decisions can be based on the best available information The assessment of risk and uncertainty in project evaluation should be reported and displayed in a manner that makes clear to the decision-maker the types and degrees of risk and uncertainty believed to characterize the benefits and costs of the alternative plans considered.

Existing Corps Risk Policies ER 1130-2-500 & EP 1130-2-500 (1992)—Major Rehabilitation Requires reliability based benefit-cost analysis to evaluate investment in major rehabilitation Life-cycle evaluation EC 1105-2-205 (1992) & ER 1105-2-101(1996)-Risk-based Analysis For Evaluation Of Hydrology/ Hydraulics And Economics In Flood Damage Reduction Studies Includes residual risk requirement

Existing Corps Risk Policies 1110-2-1155--Dam Safety Assurance Program Hydrologic or Seismic deficiency Criteria based Base safety condition for hydrologic Maximum credible earthquake (MCE) Operating basis earthquake (OBE) Other causes—major rehabilitation framework New Dam Safety Moving toward risk analysis approach covering all causes

Major Rehabilitation Background Analytical Requirements Equivalent framework to planning studies

Major Rehabilitation Guidance Major Points Objective of the Analysis Base Condition Analysis of Alternatives

NED Cost Timeline Base condition: fix-as-fail Alternative: Rehabilitate then fix-as-fail

PUP Functions Probability of Unsatisfactory Performance Instantaneous probability of component not performing as designed Typically related to age or number of operations Unsatisfactory performance must have measurable consequences

Example PUP Function

Analysis Must Answer 1. Why are we doing this now? 2. What are the consequences of not doing this now? 3. Which project or component is in the most critical condition? 4. Which alternative rehabilitation strategy is the best?

Objective of the Analysis Determine the Economically Efficient Rehabilitation Strategy Commensurate values that differ in terms of risk, monetary values, and timing

Scenario Planning as Approach to Decisions under Uncertainty Developed in second half of 20th century Result of failure of traditional planning Deterministic view of future Forecasts were wrong

When to Use Scenario Planning Consequence Scenario Planning Grave Deterministic Planning Uncertainty Much Little Deterministic Planning Standard Decision Making Minor

Scenario Approach Much uncertainty Identify future scenarios ID drivers Identify future scenarios Use scenarios to aid formulation Maybe be scenarios (assumptions) in “with” plan that influence plan performance Response to plan may be uncertain Do analysis (good science) Evaluate plans against all scenarios

Multiple Scenarios Analysis Ex.--Mt. St. Helens Problem Sediment deposited in rivers will increase residual flood risk Choose least cost method to maintain level of flood protection Key uncertain variable Forecast volume and timing of eroded sediment “The Sediment Budget”

Multiple Scenarios Analysis Ex.--Mount St. Helens Alternatives Considered Single and multiple sediment retention dams Dredging Combinations

Multiple Scenarios Analysis Ex.--Mount St. Helens Approach Evaluate each alternative for each scenario based on economic cost environmental values and impacts risk uncertainty in sediment yield relative to breakeven yield

Mount St. Helens Decision Matrix

Mount St. Helens Decision Matrix [cont.]

Risk-informed Decision Making Develop and use risk information to aid decisions Decision metrics and rules developed by decision makers Use risk assessment approach to develop science-based values of risk metrics

Risk-informed Decision Making Needs to convey information on residual risks Show risk metric values under all scenarios Develop useful tradeoff information Incremental changes in metrics

Risk Reduction Prioritization Best Return on investment scenario

Notional Risk Reduction

Possible Metrics Economic risk Life safety risk Combined Expected Net economic benefits Life safety risk Tolerated residual risk Combined Net cost per statistical life saved

Take Away Points Decisions on risk are NOT solely the responsibility of engineers Need to consider consequences of risk-bearing Not all risks can or need to be quantified to help inform decision makers Risk management requires involvement of stakeholders Major rehabilitation approach applicable to wide variety of investment decisions Engineering approach may not be able to reduce risks to tolerable levels at acceptable cost