ENHANCING LEVEL OF SERVICE THROUGH RISK-BASED ASSET MANAGEMENT Greg Norby, P.E. General Manager Vivian Housen, P.E. Principal, VWHA Northern California.
Advertisements

17 th Annual New Mexico Infrastructure Finance Conference Integrated Planning and Funding for Utilities Development and Maintenance of the ICIP Program.
Capital Improvement Program (CIP) Overview Dean Fisher, P.E., PMP, CCM July 25, 2013.
CMOM CMOM Capacity, Management, Operation & Maintenance and Remote Wireless Monitoring of Collection Systems 5 th Annual FVOA Mini Conference August 18,
The Town of Discovery Bay Community Services District Wastewater Treatment Plant Master Plan NOVEMBER 9, 2011.
Steve White Urban Water Council US Conference of Mayors
CMOM: Where are we since 2005? Ann McCready-Gliha Cuyahoga County Sanitary Engineering SPUG February 16, 2011.
1 Collection System And Wastewater Treatment Plant Sewer Update
Water Services Department Arizona Mexico Commission Bi-National Meeting March 9-11, 2008 David Cavazos Deputy City Manager Water Services Department Arizona.
1 Wastewater Capital Improvement Program (CIP) Large Users Meeting March 15, 2010.
City of Oshkosh Water System. Public Works Utility Division Water Filtration Plant Water Distribution System Wastewater Collection System Pumping Stations.
FISCAL YEAR BUDGET MONROE METROPOLITAN POLLUTION CONTROL SYSTEM BUDGET 1 Presented by Barry S. LaRoy, P.E. Director of Water & Wastewater Utilities.
1 CITY OF MONROE WASTEWATER DEPARTMENT BUDGET Presented by Barry S. LaRoy, P.E. Director of Water & Wastewater Utilities March 27, 2010.
Collection System Regulatory Initiatives in California SCAP Collection System Committee August 26, 2009 Presented by: Eric Wessels, P.E.
Capital Improvement Program (CIP) Overview Nick Kanetis, P.E. June 14, 2013.
UK WIR The UK Experience Christopher Royce Anglian Water Services.
11 City of Hallandale Beach Water, Wastewater and Stormwater Facilities Plan Public Meeting.
Lecture(1) Instructor : Dr. Abdelmajid Nassar Civil Engineering Dept. Master Program Civil Engineering Dept. Master Program
Farnsworth GROUP Rocky Mountain Section - American Water Works Association 2002 Joint Annual Conference CONDITION ASSESSMENT of Pinery Water and Wastewater.
Month Year Working together to achieve your desired outcomes, by delivering service excellence. Building Engineering Solutions for the optimisation of.
Environmental Management Systems The ISO Approach Initial Environmental Review & Gap Analysis Presented by: NC Division of Pollution Prevention.
Utility Asset Management Application on Pump Stations Jens Sapin, P.E. Environmental Services - Facility Compliance and Incident Response Utility Asset.
1 Innovative Use of Administrative Order Authority Management, Operation and Maintenance (MOM) Program.
Privileged and Confidential Strategic Approach to Asset Management Presented to October Urban Water Council Regional Seminar.
Unit 1 Community Capabilities
Tim Sikma City of Novi Case Study: CMOM Program in the City of Novi, MI Are You Ready for the Next Big Storm? Michelle LaRose, P.E. Orchard, Hiltz & McCliment,
U.S Conference of Mayors August 2004 Mayor’s ’04 Metro Agenda Bipartisan Priorities Statement Directed for candidates in Presidential and Congressional.
Imagine the result Impact Study on MSD Rate Payers of Proposed Consolidation/Merger Phase II – Towns of Biltmore Forest, Montreat and Weaverville Presentation.
SSES and GIS, A Great Partnership Cindy Fort, PE Technical Director Environmental Engineering and Jeff McCann GIS Coordinator.
THE COST AND LEVEL OF SERVIC E PRESENTED BY: COURTNEY REICH, AICP ECOLOGICAL PLANNING GROUP Stormwater Management Programs for Local Governments.
Special Order by Consent Wastewater Collection Improvement Projects Mark Fisher and Dennis Asbury Final Report to City of Eden October 20, 2009.
1 Underground Asset Management Jonathan Mongie. 2 Asset Management ► Improved Asset Condition l Increased System Efficiency ► Prolonged Asset Life l Reduced.
Orange County Utilities Department Water and Wastewater Budget Challenges March 9, 2010.
Waste Water Facilities Plan Update November 2, 2009 Palmer Engineering Company / Hazen & Sawyer / CDP Public Hearing Presentation.
2010 W EST V IRGINIA GIS C ONFERENCE Wednesday, June 9, 2010.
October 22, 2004 Holistic Asset Management – It’s Not an Isolated Function 2004 Urban Water Council US. Conference of Mayors.
2008 Facility Plan Update May Purpose  Comprehensive Plan through 2033 –Builds on Past Work –Adjust for Changing Conditions  Identify Capacity,
Financial Impact of Drought March 5, 2008 Updated 3/17/08.
METRO WASTEWATER RECLAMATION DISTRICT CAPITAL IMPROVEMENTS PROGRAM
Facilities Plan Update July 2, 2009 Palmer Engineering Company / Hazen & Sawyer / CDP.
ILLINOIS COMMERCE COMMISSION Darin Burk Manager – Pipeline Safety 1.
April 21, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
THE POLITICS OF INVESTING IN INFRASTRUCTURE Prioritizing Infrastructure Needs: Augusta-Richmond County’s Water and Wastewater Master Plan Mayor Bob Young.
South Fork improvements program – a mid-program report
Implementing an Adaptive Capital Improvement Program
City of San Diego’s Recycled Water Study Item W15a October 10, 2012 Presentation to the California Coastal Commission.
Water System Master Plan & Rate Study City of DeKalb, Illinois City Council Presentation May 16, 2015.
Equipment Life Optimization Program (ELOP) Doug Hilleman February 10, 2011.
Kevin Colvett, P.E. Nashville Corrective Action Plan and Engineering Report, Phase III for Metro Water Services and the City of Brentwood, TN Presentation.
Asset Management Bowling Green Municipal Utilities Mike Gardner – Water/Wastewater Systems Manager Doug Kimbler – Treatment Plants Superintendent.
Kevin Colvett, PE Jonathan Childs, PE CH2M HILL, Nashville CORRECTIVE ACTION PLAN AND ENGINEERING REPORT, PHASE III, FOR THE CITY OF BRENTWOOD, TN Presentation.
Nick Fish, Commissioner | Michael Stuhr, P.E., Director Portland Water Bureau May 3, 2016 Briefing for the Portland Utility Board Asset Management at the.
1% Sales Tax Commission Board Meeting June 3, 2015.
Kevin Burnett Presented by CITY OF TULARE, CALIFORNIA.
PUBLIC WORKS FY 2012 Proposed Budget May 24, 2012.
Presentation to CITY OF PALM COAST, FLORIDA FINANCIAL FORECAST AND CAPITAL FACILITIES FEES ANALYSIS Prepared in Conjunction With the Utility System Revenue.
Miami-Dade Water & Sewer Department Miami-Dade Water and Sewer Department |  1   Reuse, Every Drop Has Value Seminar FPL JPA.
City of Sausalito Sewer CIP Vivian Housen, P.E. V. W. Housen & Associates March 25, 2015.
Approval of FY-2016 Capital Budget and the 10-Year Capital Plan February 11, 2015.
Status Update on USEPA Compliance Sausalito City Council February 26, 2013 SMCSD Directors Raymond Gergus, President Bill Ring, Vice President Ann Arnott.
Asset Degradation Modelling at Townsville Water
I/I Reduction Efforts EBMUD and the Satellite Agencies
Creating a SUSTAINABLE Utility
NC AWWA-WEA 97th Annual Conference
Town of Melbourne Beach
Achieving Best in Class Performance for Collection Systems Through an Integrated Team Program Management Approach David Saunders – HDR The Story of the.
Village of Ruidoso Water and Wastewater Systems
Capital Improvements Planning
AGA Operations Conference
Linking AMPs to Short-Term and Long-Term Investment Plans
Presentation transcript:

NC AWWA-WEA 95th Annual Conference Integrating Asset Management into Winston-Salem’s Wastewater System Master Plan CIP Kevin T. Laptos, Black & Veatch

Acknowledgement Co-Authors Courtney Driver, City of Winston-Salem Jeff Stillman, Black & Veatch Katy Weidner, Black & Veatch Kent Lackey, Black & Veatch

Agenda Evolution of System Planning Traditional Planning Processes Asset Management Approach Case Study – 2015 Winston-Salem Wastewater System Master Plan System Overview Asset Management Elements and Recommendations CIP Summary and Budgeting

Evolution of system planning

Traditional Master Planning Process (Capacity) Recommended Capital Improvements Alternatives Analysis Capacity Analysis Model Update and Calibration Regulatory Drivers Population Projections & Growth 5, 10, 20 Year Capital Planning Update Cycle Typical Planning Processes

Annual Operations Budget Update Cycle Current Asset Management Process (Condition & criticality) Recommended Capital Improvements Business Risk Exposure and Prioritization Consequence of Failure Likelihood of Failure Condition & Performance Assessment Annual Operations Budget Update Cycle Typical Planning Processes

Water and Sewer Utilities – Traditional Organization challenges Operations Engineering Silos lead to system planning pitfalls

Traditional Sewer sizing Pitfall Selecting a replacement (or new) sewer size without considering future flows due to system growth and/or I/I reduction

Asset Management approach to system planning Provides a comprehensive and coordinated Master Plan CIP

Budget Master Planning Process Capacity Planning Population Projections & Growth Regulatory Drivers Model Update and Calibration Capacity Analysis Alternatives Analysis Recommended Capital Improvements Capacity Planning System Planning Review & Update 15 Year CIP 5 Year CIP Projects for Budget Reconcile Projects Proposed Budget Rate Modeling Budget Asset Management Process Condition Assessments Update SAMS Spreadsheets Prioritize Potential Projects Confirm Project Rankings Finalize Planned Improvements Operational Planning

Case Study: 2015 Winston Salem Wastewater Master plan

Winston-Salem/Forsyth County Utilities Commission – System Overview Over 90,000 Sewer Customers 1,724 miles of Sewers 49 Lift Stations 36 MGD treated daily 3 primary sewer basins CASE STUDY: Winston-Salem

Winston-Salem MP – Asset Management Elements Organization Assessments: PAS 55 CMOM Facility Assessments: Condition & Criticality Scoring Asset Group Life Cycle Analysis Pipeline Assessments Desktop analysis By sub-basin

PAS55 – Checklist for Good Asset Management Practice Similar to ISO 55000 Standards and Guidance

PAS 55 Asset Management Maturity Scoring

Pas55 Gap Analysis Results Strengths: Contingency Planning; Communication, Participation, and Consultation; Legal; Tools, Facilities, and Equipment; Compliance Evaluation Improvement Focus Areas: Asset Management System; Risk Management; Life Cycle Activities

CMOM Evaluation High Priority Recommendations: Capacity Management: prevent SSOs through proactive cleaning and focused preventative maintenance. SSO response: Record rainfall data to track wet weather SSOs Customer Service: Track information on the status of SSO serve requests Low Priority Recommendations: Capital Planning: Do a better job of coordinating project planning between the C&M and Capital planning departments C&M: Develop a post-SSO water quality management plan FOG program: Identify major contributors and budget for education On-track with previous (2012) recommendations resulting in a drop in SSOs/100 miles from 16 in 2002-2003 to just 7 in 2011-2012

Facility assessments Lift Station Inspections Hydraulic Capacity Condition and Criticality Risk-Based Prioritization Life Cycle/O&M Improvements

Lift Station Inspections Condition and Criticality Ratings by Asset Group: I&C Electrical Structural Mechanical Pumps Pipes Valves Auxiliary Equipment: Generator

Risk-based prioritization Developed from Inspection Condition and Criticality Ratings

Pipeline assessments Condition Scoring Criteria Criticality Scoring Criteria (Consequence of Failure)

Pipeline Prioritization by Sub-basin

Winston-Salem Asset management Recommendations & cip budget planning

Ramping up on Asset Management activities

CIP Budget planning – Collection System Rehabilitation and Replacement (R&R) “firm 75-Year” pipeline service Life In the second graph the high magnitude of spending from 2017-2019 is spreadout over the entire next decade. Useful life of 75 years (only) “Condition managed” Pipeline service Life

CIP Budget planning – Collection System capacity and R&R

MANAGING THE CIP AND BUDGET FORECASTS USING iCIP Add, remove, or update projects via an interface with GIS Update project phasing based on system performance triggers Update and refine projects stemming from on-going R&R program Provides dynamic CIP budget forecasting and reporting Immediately shows results of decisions A customized technical approach for project success

NC AWWA-WEA 95th Annual Conference Questions or comments? Kevin T. Laptos, Black & Veatch