1 Update on LSST & GSMT Jeremy Mould Users Committee October 13, 2004.

Slides:



Advertisements
Similar presentations
General Astrophysics with TPF-C David Spergel Princeton.
Advertisements

Extremely Large Telescopes and Surveys Mark Dickinson, NOAO.
The Galaxy Evolution Science Case for a Large Ground-based Telescope Betsy Gillespie December 4, 2002 Grateful acknowledgements to: Arjun Dey’s “Galaxy.
Science Group: Status, Plans, and Issues Claire Max Liz McGrath August 19, 2008.
The Green Bank Telescope a powerful instrument for enhancing ALMA science Unblocked Aperture Low sidelobes gives high dynamic range Resistance to Interference.
Science Team Management Claire Max Sept 14, 2006 NGAO Team Meeting.
AURA New Initiatives Office S.C. Barden, M. Liang, K.H. Hinkle, C.F.W. Harmer, R.R. Joyce (NOAO/NIO) September 17, 2001 Instrumentation Concepts for the.
1 NGAO Instrumentation Studies Overview By Sean Adkins November 14, 2006.
The Path to NGAO Core Science Requirements Claire Max and Liz McGrath NGAO Team Meeting September 11-12, 2008.
STAR FORMATION STUDIES with the CORNELL-CALTECH ATACAMA TELESCOPE Star Formation/ISM Working Group Paul F. Goldsmith (Cornell) & Neal. J. Evans II (Univ.
KDUST Supernova Cosmology
Providing Access for US Astronomers to the Next Generation of Large Ground Based OIR Telescopes 1.Scientific Potential 2.Current Design Efforts 3.Complementarity.
1 The Thirty-Meter Telescope (TMT) Richard Ellis, Steele Professor and California Institute of Technology TMT Board member Michael Bolte, Director, University.
[79.03] The Thirty Meter Telescope (TMT) Project Gary H Sanders for the TMT Project Partnership AAS 205th Meeting, San Diego Providing Access to U.S. Astronomers.
Enabling a GSMT for the US Community: AURA’s Proposal to the NSF Stephen E. Strom 04 June, 2004 Tucson, AZ National Optical Astronomy Observatory Tucson.
MCAO A Pot Pourri: AO vs HST, the Gemini MCAO and AO for ELTs Francois Rigaut, Gemini GSMT SWG, IfA, 12/04/2002.
Characterizing Exoplanets: The Challenge. GSMT Potential GSMT will detect & classify Jovian mass planets, from ‘roasters’ to ‘old, cold’ Jupiters located.
The Effect of Crowding on the GSMT Stellar Populations Science Case Knut Olsen, Bob Blum (NOAO), François Rigaut (Gemini) GSMT SWG Presentation Hilo 2002.
Presentation EddiCam consortium, FF, Madrid 13/06/2002 Eddington programmatic status Fully approved by SPC as part of ESA’s science program as project.
1 New Frontiers with LSST: leveraging world facilities Tony Tyson Director, LSST Project University of California, Davis Science with the 8-10 m telescopes.
AAAC Meeting February, New GSMT Role NSF has asked that AURA/NOAO act as NSF’s "Program Manager" for the GSMT Technology development effort at a.
STATUS REPORT OF FPC SPICA Task Force Meeting March 29, 2010 MATSUMOTO, Toshio (SNU)
OWL Instrument Concept Studies Within the OWL Conceptual Design to be completed by ESO in 3Q 2005, ESO collaborates with external institutes in the study.
GSMT NSF Science Working Group Rolf-Peter Kudritzki NOAO Town Meeting 07 January, 2003.
1 Preparing AURA for the Next Generation AURA Board, Washington D.C 27 th February 2003.
Advancing GSMT SWG Recommendations: AURA’s Proposal to the NSF Stephen E. Strom AURA New Initiatives Office Presented to the GSMT SWG 12 February, 2004.
A Roadmap forNationalOIRFacilities AAAC May 2005 OIR Long Range Planning Committee Document for submission to NSF AST and CAA May 2005.
Frontier Science Enabled by a Giant Segmented Mirror Telescope Rolf-Peter Kudritzki 1 for the GSMT Science Working Group 1 Chair, GSMT Science Working.
MAXAT-II Woods Hole September Overview Science Drivers Lessons of the past Focusing on Science and Innovation.
Stellar Populations Science Knut Olsen. The Star Formation Histories of Disk Galaxies Context – Hierarchical structure formation does an excellent job.
TMT.PMO.PRE REL011 Thirty Meter Telescope Background and Status.
“From the Ground Up: Balancing the NSF Astronomy Program” Senior Review Major Recommendations November 2006 Implications for GSMT.
MIRI Optical System CDR, 6 th & 7 th December 2006 Mid InfraRed Instrument 07-1 Optical System Critical Design Review (CDR) TIPS Presentation: Margaret.
Weak Lensing from Space with SNAP Alexandre Refregier (IoA) Richard Ellis (Caltech) David Bacon (IoA) Richard Massey (IoA) Gary Bernstein (Michigan) Tim.
Australia’s Path to a Giant Telescope Matthew Colless MNRF Symposium 7 June 2003.
CELT Science Case. CELT Science Justification Process Put together a Science Working Group –Bolte, Chuck Steidel, Andrea Ghez, Mike Brown, Judy Cohen,
Michael Levi (Lawrence Berkeley National Laboratory), M. Lampton (UCBerkeley Space Sciences Lab), and M. Sholl (UCBerkeley Space Sciences Lab) WFIRST:
The Large Synoptic Survey Telescope: The power of wide-field imaging Michael Strauss, Princeton University.
FELT 1 Study of the capability and configuration of a fixed mirror Extremely Large Telescope (FELT) Low cost path to large telescope Primary concern is.
Precision Studies of Dark Energy with the Large Synoptic Survey Telescope David L. Burke SLAC for the LSST Collaboration Rencontres de Moriond Contents.
Technology Development for ELTs Doug Simons GSMT SWG April 28, 2003.
Keck Observatory in the TMT Era Keck Strategic Planning meeting September 18, 2009.
Mega Telescopes of the 21 st Century Evolution in the Ground-Space Synergy Dr. Marc Postman (STScI) & Richard Ellis (Caltech) James Webb Space Telescope.
LSST and VOEvent VOEvent Workshop Pasadena, CA April 13-14, 2005 Tim Axelrod University of Arizona.
AURA New Initiatives Office. GSMT SWG Meeting L. Stepp, July 30, 2002 NSF Science Working Group Support Available from AURA NIO Available Personnel Current.
The Large Synoptic Survey Telescope and Precision Studies of Cosmology David L. Burke SLAC C2CR07 Granlibakken, California February 26, 2007 Brookhaven.
Keck Observatory Overview Peter Wizinowich W. M. Keck Observatory AOSC May 31, 2004.
Science with Giant Telescopes - Jun 15-18, Instrument Concepts InstrumentFunction range (microns) ResolutionFOV GMACSOptical Multi-Object Spectrometer.
Goals for HETDEX Determine equation of state of Universe and evolutionary history for dark energy from 0
GMT’s Near IR Multiple Object Spectrograph - NIRMOS Daniel Fabricant Center for Astrophysics.
FIRST LIGHT A selection of future facilities relevant to the formation and evolution of galaxies Wavelength Sensitivity Spatial resolution.
Giant Magellan Telescope Project Status and Relationship with the NSF Astronomy and Astrophysics Advisory Committee February 8, 2007 Patrick McCarthy -
Theme 2 AO for Extremely Large Telescopes Center for Adaptive Optics.
François Rigaut, Gemini Observatory GSMT SWG Meeting, LAX, 2003/03/06 François Rigaut, Gemini Observatory GSMT SWG Meeting, LAX, 2003/03/06 GSMT AO Simulations.
GSMT SWG Meeting November, New GSMT Role NSF has asked that AURA/NOAO act as NSF’s "Program Manager" for the GSMT Technology development effort.
Sample expanded template for one theme: Physics of Galaxy Evolution Mark Dickinson.
NIRSS: the Near-Infrared Sky Surveyor WFIRST Meeting 2011 February 3 Daniel Stern (JPL/Caltech)
Next Generation O/IR Telescopes Stephen E. Strom Associate Director GSMT Development NOAO User’s Committee October, 2005.
Gina Moraila University of Arizona April 21, 2012.
Stellar Populations Science Knut Olsen. The Star Formation Histories of Disk Galaxies Context – Hierarchical structure formation does an excellent job.
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
The GMT Project The Giant Magellan Telescope (GMT)
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
Theme 2 AO for Extremely Large Telescopes
Frontier Science Enabled by a Giant Segmented Mirror Telescope
Observational Prospect of NIREBL
High Resolution Spectroscopy of the IGM: How High
Scientific Potential Current Design Efforts Complementarity with JWST
Theme 2 AO for Extremely Large Telescopes
Theme 2 AO for Extremely Large Telescopes
Presentation transcript:

1 Update on LSST & GSMT Jeremy Mould Users Committee October 13, 2004

2 GSMT SWG The GSMT SWG is a community-based group convened to: Formulate a powerful science case for federal investment in GSMT –Identify key science drivers –Develop clear and compelling arguments for GSMT in the era of JWST/ALMA –Discuss realization of key science as a function of design parameters: aperture, FOV, PSF…… Generate unified, coherent community support

3 GSMT SWG Members Chair: Rolf-Peter Kudritzki, UH IfA SWG Members: –Jill Bechtold -- UA –Mike Bolte -- UCSC –Ray Carlberg -- U of T –Matthew Colless -- ANU –Irena Cruz-Gonzales -- UNAM –Alan Dressler -- OCIW –Betsy Gillespie -- UA –Terry Herter -- Cornell –Jonathan Lunine -- UA LPL –Claire Max -- UCSC –Chris McKee -- UCB –Francois Rigaut -- Gemini –Chuck Steidel -- CIT –Steve Strom -- NOAO

4 TMT is a fusion of 3 concepts The GSMT, CELT and VLOT point design telescope concepts. GSMT CELT VLOT

5 TMT Project FY2004 Project Office established Project manager appointed Engineering efforts from 4 partners integrated to provide a 'reference design' –based on the heritage of the VLOT, CELT and GSMT efforts Moore funds in place for D and D Phase (gift to UC & Caltech) CFI funds authorized NSF proposal submitted Key milestone: Baseline Design which will answer the following key design issues/trades –Is the elevation axis in front of or behind the primary? –Is the telescope optical configuration RC or AG? –What is the focal ratio of the primary ( f/1 – f/1.5)? –What final focal ratios should be provided ( f/15 – f/22)?

6 Highest Priority Capabilities for First Light diffraction-limited (  ) imaging & spectroscopy –0.8- to 2.5-micron wavelength –1-2 arcminutes multi-conjugate adaptive optics (MCAO) field –Strehl ratio at K-band of 0.7, constant across the field to 10%; –highly-multiplexed (~1,000 slits) seeing-limited 100 < R < 7,000 spectroscopy –0.32- to 1-micron wavelength range –wide (10-20 arc-minute) field high-spectral-resolution (20,000 < R < 100,000) spectroscopy –1- to 5-micron –7- to 28-micron

7 TMT phased implementation optical spectroscopy with 20,000 < R < 100,000 –0.3 microns to 1 micron very high-contrast imaging near diffraction limit 1 to 2.5  –contrast ratio > 10 8 at  > 4 /D from bright stars R ~3,000-5,000 spectroscopy –fields ≥5 arcminutes –0.7- to 2.5-micron –sampling 0.15 arcseconds –image quality 80% enclosed energy in 0.3 arc-sec. –unit (IFU) heads or microslits –ground-layer adaptive optics system (GLAO); mid-IR diffraction-limited imaging (Strehl > 0.5, 7  30 arcseconds;

8 TMT AO modes AO modeEnablesScience Mid-IR NGS AODiffraction limited resolution > M Planet-forming Environments MCAODiffraction-limited resolution in J, H, K bands over 0.5-1’ fields Galaxy Assembly; deconstructing stellar populations MOAO~0.1” resolution over 3- 5’ fields for multi-object spectroscopy Young galaxy mass, metallicity, & star formation ExAOHigh dynamic range imaging Planet detection & characterization GLAO0.2-3” resolution over 5- 10’ fields Galaxy evolution

9 NIO provided 'point design' for GSMT -- key element of TMT planning supports site testing (northern chile; Baja, CA; Hawaii); serves both theGMT and TMT communities interfaces with ESO to advance technologies of mutual interest has contributed key technical and management leadership within TMT post TMT project office, NIO will –carry out two key TMT work packages (mid-IR Echelle; M2 assembly) –continue site testing –continue ESO collaborations (level TBD following allocation of TMT workpackages)

10 GSMT vs JWST Simulated monochromatic images of the ‘Antennae’ (local starburst galaxy: 10 5 seconds integration time) Courtesy: Elizabeth Barton, GSMT SWG JWST GSMT

11 GMT alternate Giant Magellan Telescope (GMT) 7 x 8.4 meter mirrors Magellan partners + Texas

12 OIR Planning Long Range Planning Committee (Chair: C. Pilachowski) is currently working on a roadmap for large scale facilities Where will the decision points be for public funding ? Look forward from 2005 as far as –Two decadal surveys will occur before 2025, and these will outrank this roadmap. The plan will show how present investments –realize the new initiatives, –illustrate convergence paths, –lay the basis for facility closures and transfers, –and address community structural change.

13 Overview and Status Opportunities for Scientific Participation 9 October 2004

14 LSST Partners

15 Project Technical Status Systems Engineering – Requirements and Scope ~3 Gigapixel Camera 8.4m 3-mirror Telescope Data Products & Management

16 Observing Simulator Initially Created By Abi Saha New Simulation Tool in Development –K. Cook et. al. –Foundation and Testbed for Scheduler A. Saha, NOAO

17 Nature of Dark Energy –Image Quality – FWHM <0.8arcsec –Shape Systematics – PSF  (e1,e2) < Solar System Map –Observing Cadence –Absolute Astrometry – Link Vectors From Multiple Epochs Optical Transients –Observing Cadence –Data Processing – Real-Time Alerts (~30sec delay) Galactic Structure –Photometric Precision – 1% Internal, 2% Absolute –Astrometry The LSST Key Science Drivers

18

19 Mapping the Solar System: Probing the Fossil Record

20 Mapping the Galactic Halo

21 Weak Lensing and Cosmology Cluster tomography –Shear used to obtain mass maps –Number density of clusters as function of redshift depends on density fluctuations and distance scale –Both depend on dark energy Strauss report –Power spectrum, bispectrum, and shear cosmography

22 Special cadence to go deeper?

23 T3=3.25, CC2= Evolving Optical Design

24

25 Wide – Deep - Fast ~10 deg. 2 per Field ~7m Effective Collecting Area m~24 th per 10 sec Exposure Wide Coverage > 15,000 Square Degrees Multiple Filters (e.g. bgriz´ - TBD) ~100+ Epochs in Each of >1500 Fields in Each Filter Over Ten Years Accumulated Depth of 26 th Magnitude in Each Filter

26 Schedule & Milestones Design Construction Integration Commissioning Operation First Light CoDR PDRCDR Optics on site First Light Order glass Start final camera fab

27 Camera Focal Plane Array –10  m pixels  0.2 arcsecond/pixel (~ 1 / 3 seeing-limited PSF) –64 cm diameter  10 square degree FOV  3 Gpixels –Integrated front-end electronics –16 bits/pixel, 2 sec readout time  3 GB/sec  Parallel readout Housing / Filters / Optics / Mechanisms

28 Private Donor Committed to Buy LSST Mirror –University of Arizona Borosilicate Cast Mirror –Similar to LBT Primary with Very Large Hole Contract Approved –Materials and Engineering –Casting –Optical Figuring –Cell Integration and Testing Primary Mirror Contract

29 Telescope Structure Initial Warren Davidson Study Complete –Long Tube –Stiff Structure, f(n 1 )=10hz –Relatively Light, 200T Preparing for Second Study –Short Tube –Open Structure –Industrial Source

30 Site Selection First Down-Selection Completed in May 2004 Cerro Pachon Las Campanas San Pedro Martir La Palma Study to Evaluate Satellite Data Issues Correlating Local Data to Global Weather Patterns Final Site (2) Selection Meeting 14 January 2005

31 Summary LSST Corporation is Established The Mission is Solidifying Management Organized & Vision is Clear Project Teams Developing Technical Advancement Accelerating