© The McGraw-Hill Companies, Inc., 2004 1. 2 Chapter 16 Operations Scheduling.

Slides:



Advertisements
Similar presentations
Operations Scheduling
Advertisements

Operations Scheduling
Scheduling.
Scheduling for Low-volume Operations Chapter 15 Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation.
© The McGraw-Hill Companies, Inc., 1998 Irwin/McGraw-Hill Module 11 Operations Scheduling Chapter 16 (pp ) Work Center and definitions  Objectives.
Operations Management For Competitive Advantage 1 Operations Scheduling Operations Management For Competitive Advantage Chapter 15.
Operations Scheduling
Scheduling.
© The McGraw-Hill Companies, Inc., Chapter 16 Operations Scheduling.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 16 Scheduling.
Operations Scheduling
1-1 McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved 1 Chapter 19 Operations Scheduling.
Operations Scheduling
Scheduling. Production Planning Process Process Planning Strategic Capacity Planning Aggregate Planning Master Production Scheduling Material Requirements.
DOM 102: Principles of Operations Management Operations Scheduling
Scheduling Chapter 19.
Short Term Scheduling Introduction What – Scheduling or timing of operations Where – Timing of operations affects the overall strategy Why – Reduce costs,
Short-Term Scheduling
Operations Management
Inputs and Outputs to Aggregate Production Planning
Scheduling Operations Management - 5 th Edition Chapter 16 Roberta Russell & Bernard W. Taylor, III.
PowerPoint Presentation
22–1. 22–2 Chapter Twenty-Two Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Scheduling.
1 ISQA 459/559 Mellie Pullman Scheduling Shop Floor.
1 Chapter 15 Scheduling. 2 Scheduling: Establishing the timing of the use of equipment, facilities and human activities in an organization Answering “when”
CHAPTER 19 Scheduling Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 16: Learning Objectives
Operations Scheduling. Scheduling in a Process-Focused Environment.
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
Operations Management Contemporary Concepts and Cases Chapter Thirteen Scheduling Operations Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights.
1. Facility size 2. Equipment procurement Long-term
Copyright 2009, John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Scheduling Operations Management - 5 th Edition Chapter 17.
Scheduling.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
Thursday Night Operations Management Class 7. Chapter 14 Resource Planning.
15-1Scheduling William J. Stevenson Operations Management 8 th edition.
Aggregate Planning, MRP, and Short Term Scheduling 9 Aug 2001.
Production Activity Control
15-1Scheduling William J. Stevenson Operations Management 8 th edition.
1 1 Slide Short – Term Scheduling Professor Ahmadi.
Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Scheduling Process and Production Management.
Topics To Be Covered 1. Tasks of a Shop Control Manager.
Operations Management Operations Scheduling
1 Slides used in class may be different from slides in student pack Chapter 19 Operations Scheduling  Work Center Defined  Typical Scheduling and Control.
Scheduling for Low-volume Operations Chapter 15 Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation.
Chapter 17 Scheduling. Management 3620Chapter 17 Schedule17-2 Overview of Production Planning Hierarchy Capacity Planning 1. Facility size 2. Equipment.
1 Manufacturing Operations Scheduling B2 [ ] B2 [ ] E5 [ E5 [ P9 [---] P9 [---] D1 [ D1 [
Scheduling. Definition of scheduling Establishing the timing of the use of equipment, facilities and human activities in an organization In the decision-making.
Scheduling. Scheduling: The allocation of resources over time to accomplish specific tasks. Demand scheduling: A type of scheduling whereby customers.
1 Chapter 10 Scheduling 1 Chapter 10 SCHEDULING McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved.
Scheduling for Low-volume Operations
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
CHAPTER SEVENTEEN SCHEDULING Chapter 17 Scheduling.
Scheduling. Scheduling of Operations A planning tool for the short term  Provides an opportunity to make use of new information as we approach real time.
CHAPTER 4 : SCHEDULING Presented by: HAMKA BIN TAIP
Scheduling Operations IDS 605 Spring Data Collection for Scheduling l Jobs l Activities l Employees l Equipment l Facilities Transparency 18.1.
Chapter 16 & 9 Scheduling Work & Employees. Scheduling Outline What needs to be scheduled? –doctor’s office, restaurant, mfg. plant, hospital –employees.
Activity Scheduling and Control
0 Production and Operations Management Norman Gaither Greg Frazier Slides Prepared by John Loucks  1999 South-Western College Publishing.
Scheduling.
Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Basics of Supply Chain Management
16 Scheduling (focus on sequencing; FCFS, SPT, EDD pages , and Johnson’s rule pages ) Homework; 6, 7, 11.
PRODUCTION ACTIVITY CONTROL (PAC)
PRODUCTION ACTIVITY CONTROL (PAC)
8 Job Sequencing & Operations Scheduling CHAPTER Arranged by
Sequencing Sequencing: Determine the order in which jobs at a work center will be processed. Workstation: An area where one person works, usually with.
Presentation transcript:

© The McGraw-Hill Companies, Inc.,

2 Chapter 16 Operations Scheduling

© The McGraw-Hill Companies, Inc., Work Center Defined Typical Scheduling and Control Functions Job-shop Scheduling Examples of Scheduling Rules Shop-floor Control Principles of Work Center Scheduling Issues in Scheduling Service Personnel OBJECTIVES

© The McGraw-Hill Companies, Inc., Work Center Defined A work center is an area in a business in which productive resources are organized and work is completed Can be a single machine, a group of machines, or an area where a particular type of work is done

© The McGraw-Hill Companies, Inc., Capacity and Scheduling Infinite loading (Example: MRP) Finite loading Forward scheduling Backward scheduling (Example: MRP)

© The McGraw-Hill Companies, Inc., Types of Manufacturing Scheduling Processes and Scheduling Approaches Continuous process Type of ProcessTypical Scheduling Approach High-volume manufacturing Med-volume manufacturing Low-volume manufacturing Finite forward of process, machine limited Finite forward of line, machined limited Infinite forward of process, labor and machined limited Infinite forward of jobs, labor and some machine limited

© The McGraw-Hill Companies, Inc., Typical Scheduling and Control Functions Allocating orders, equipment, and personnel Determining the sequence of order performance Initiating performance of the scheduled work Shop-floor control

© The McGraw-Hill Companies, Inc., Work-Center Scheduling Objectives Meet due dates Minimize lead time Minimize setup time or cost Minimize work-in-process inventory Maximize machine utilization

© The McGraw-Hill Companies, Inc., Priority Rules for Job Sequencing 1. First-come, first-served (FCFS) 2. Shortest operating time (SOT) 3. Earliest due date first (DDate) 4. Slack time remaining (STR) first 5. Slack time remaining per operation (STR/OP)

© The McGraw-Hill Companies, Inc., Priority Rules for Job Sequencing (Continued) 6. Critical ratio (CR) 7. Last come, first served (LCFS) 8. Random order or whim

© The McGraw-Hill Companies, Inc., Example of Job Sequencing: First- Come First-Served Answer: FCFS Schedule Suppose you have the four jobs to the right arrive for processing on one machine What is the FCFS schedule? No, Jobs B, C, and D are going to be late Do all the jobs get done on time?

© The McGraw-Hill Companies, Inc., Example of Job Sequencing: Shortest Operating Time Answer: Shortest Operating Time Schedule Suppose you have the four jobs to the right arrive for processing on one machine What is the SOT schedule? No, Jobs A and B are going to be late Do all the jobs get done on time?

© The McGraw-Hill Companies, Inc., Example of Job Sequencing: Earliest Due Date First Answer: Earliest Due Date First Suppose you have the four jobs to the right arrive for processing on one machine What is the earliest due date first schedule? No, Jobs C and B are going to be late Do all the jobs get done on time?

© The McGraw-Hill Companies, Inc., Example of Job Sequencing: Critical Ratio Method Suppose you have the four jobs to the right arrive for processing on one machine What is the CR schedule? No, but since there is three- way tie, only the first job or two will be on time In order to do this schedule the CR’s have be calculated for each job. If we let today be Day 1 and allow a total of 15 days to do the work. The resulting CR’s and order schedule are: CR(A)=(5-4)/15=0.06 (Do this job last) CR(B)=(10-7)/15=0.20 (Do this job first, tied with C and D) CR(C)=(6-3)/15=0.20 (Do this job first, tied with B and D) CR(D)=(4-1)/15=0.20 (Do this job first, tied with B and C) Do all the jobs get done on time?

© The McGraw-Hill Companies, Inc., Example of Job Sequencing: Last-Come First-Served Answer: Last-Come First-Served Schedule No, Jobs B and A are going to be late Suppose you have the four jobs to the right arrive for processing on one machine What is the LCFS schedule? Do all the jobs get done on time?

© The McGraw-Hill Companies, Inc., Example of Job Sequencing: Johnson’s Rule (Part 1) Suppose you have the following five jobs with time requirements in two stages of production. What is the job sequence using Johnson’s Rule? Time in Hours Jobs Stage 1Stage 2 A B C D

© The McGraw-Hill Companies, Inc., Example of Job Sequencing: Johnson’s Rule (Part 2) First, select the job with the smallest time in either stage. That is Job D with the smallest time in the first stage. Place that job as early as possible in the unfilled job sequence below. Drop D out, select the next smallest time (Job A), and place it 4th in the job sequence. Drop A out, select the next smallest time. There is a tie in two stages for two different jobs. In this case, place the job with the smallest time in the first stage as early as possible in the unfilled job sequence. Then place the job with the smallest time in the second stage as late as possible in the unfilled sequence. Job Sequence Job AssignedD A B C Time in Hours Jobs Stage 1Stage 2 A B C D

© The McGraw-Hill Companies, Inc., Shop-Floor Control: Major Functions 1. Assigning priority of each shop order 2. Maintaining work-in-process quantity information 3. Conveying shop-order status information to the office

© The McGraw-Hill Companies, Inc., Shop-Floor Control: Major Functions (Continued) 4. Providing actual output data for capacity control purposes 5. Providing quantity by location by shop order for WIP inventory and accounting purposes 6. Providing measurement of efficiency, utilization, and productivity of manpower and machines

© The McGraw-Hill Companies, Inc., Input/Output Control InputOutput Planned input should never exceed planned output Focuses attention on bottleneck work centers Work Center

© The McGraw-Hill Companies, Inc., Principles of Work Center Scheduling 1. There is a direct equivalence between work flow and cash flow 2. The effectiveness of any job shop should be measured by speed of flow through the shop 3. Schedule jobs as a string, with process steps back-to-back 4. A job once started should not be interrupted

© The McGraw-Hill Companies, Inc., Principles of Job Shop Scheduling (Continued) 5. Speed of flow is most efficiently achieved by focusing on bottleneck work centers and jobs 6. Reschedule every day 7. Obtain feedback each day on jobs that are not completed at each work center 8. Match work center input information to what the worker can actually do

© The McGraw-Hill Companies, Inc., Principles of Job Shop Scheduling (Continued) 9. When seeking improvement in output, look for incompatibility between engineering design and process execution 10. Certainty of standards, routings, and so forth is not possible in a job shop, but always work towards achieving it

© The McGraw-Hill Companies, Inc., Personnel Scheduling in Services Scheduling consecutive days off Scheduling daily work times Scheduling hourly work times

© The McGraw-Hill Companies, Inc., Question Bowl A Work Center may be which of the following? a.A single machine b.A group of machines c.An area where a particular type of work is performed d.All of the above e.None of the above Answer : d. All of the above

© The McGraw-Hill Companies, Inc., Question Bowl When work is assigned to a work center simply based on what is needed over time, we would refer to this as which of the following scheduling systems? a.A finite loading of work b.An infinite loading of work c.Forward scheduling d.All of the above e.None of the above Answer: b. An infinite loading of work

© The McGraw-Hill Companies, Inc., Question Bowl Typical scheduling and controlling of operations include which of the following functions? a.Allocating orders at work centers b.Allocating equipment at work centers c.Allocating personnel at work centers d.All of the above e.None of the above Answer: d. All of the above

© The McGraw-Hill Companies, Inc., Question Bowl Typical scheduling and controlling of operations include which of the following functions? a.Determining the job sequences b.Dispatching c.Expediting late and critical orders d.All of the above e.None of the above Answer: d. All of the above

© The McGraw-Hill Companies, Inc., Question Bowl Which of the following are standard measures of schedule performance used to evaluate priority rules? a.Meeting due dates b.Maximizing job flow time c.Maximizing work-in-process inventory d.All of the above e.None of the above Answer: a. Meeting due dates (Correct answer can also include minimizing WIP inventory, idle time, and job flow time.)

© The McGraw-Hill Companies, Inc., Question Bowl Which priority rule uses the calculation of the difference between the due date and the current date divided by the number of work days remaining? a.STR b.SOT c.DDate d.FCFS e.None of the above Answer: e. None of the above (Correct answer can is CR or critical ratio.)

© The McGraw-Hill Companies, Inc., Question Bowl The major functions of a shop-floor control are which of the following? a.Conveying shop-order status b.Measuring efficiency c.Assigning priorities d.Maintaining WIP quantity information e.All of the above Answer: e. All of the above (Correct answer can also include providing quantity by location and actual output data.)

© The McGraw-Hill Companies, Inc., Question Bowl Which of the following are Tools of Shop-Floor Control? a.Daily dispatch lists b.Scrap reports c.Rework reports d.All of the above e.None of the above Answer: d. All of the above (Correct answer can also include all status and exception reports and input/output control reports.)

© The McGraw-Hill Companies, Inc., Question Bowl Which of the following is a Principle of Work- Center Scheduling? a.There is a direct equivalence between work flow and cash flow b.Certainty of routings are very possible in a shop c.Reschedule only once a week d.All of the above e.None of the above Answer: a. There is a direct equivalence between work flow and cash flow (There are nine other principles.)

© The McGraw-Hill Companies, Inc., End of Chapter 16