D.E. Johnson, T.R. Johnson, K.L. Duel, M. Gardner, V. Scarpine, R.J. Tesarek Motivation Notching process in the Booster creates about 30-35% of the total.

Slides:



Advertisements
Similar presentations
Thermal properties of laser crystal Rui Zhang ACCL Division V, RF-Gun Group Feb 20, 2015 SuperKEKB Injector Laser RF Gun Review.
Advertisements

PIP and the Booster Notch Bob Zwaska October 12, 2011 PIP Meeting.
Page 1 Collider Review Retreat February 24, 2010 Mike Spata February 24, 2010 Collider Review Retreat International Linear Collider.
Experience with Bunch Shape Monitors at SNS A. Aleksandrov Spallation Neutron Source, Oak Ridge, USA.
CESR as Light Source David L. Rubin for the CESR Operations Group Cornell University Laboratory for Elementary-Particle Physics.
Ion Accelerator Complex for MEIC January 28, 2010.
Linac Laser Notcher David Johnson, Todd Johnson, Matt Gardner, Kevin Duel April PMG Meeting April 2, 2015.
SLAC XFEL Short Bunch Measurement and Timing Workshop 1 Current status of the FERMI project (slides provided by Rene Bakker) Photoinjector laser system.
Linac Laser Notcher Status David Johnson Todd Johnson, Vic Scarpine, Andrea Saewert, John Sobolewski PIP Meeting March 6, 2013 Beams Doc 4306.
Laser Notcher Status Dave Johnson, Todd Johnson, John Sobolewski, Kevin Duel, Andrea Saewert September 11,2013.
David Johnson, Todd Johnson, John Sobolewski, Fred Mach, Kevin Duel, Andrea Saewert February 11, 2014 Accelerator Physics and Technology Seminar.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
David Johnson –APC -.  The Proton Improvement Plan is tasked with Booster upgrades which will increase the Booster throughput required for future operation.
Gamma Beam Systems a simple introduction. Purpose of the machine Deliver a high performance photon beam: Variable energy Highly polarized High intensity.
Linac Laser Notcher Status David Johnson and Todd Johnson PIP Meeting October 10, 2012 Beams doc 4237.
RF Synchronization, control and stability Takuya Natsui.
Laser Notcher Pulse Energy Requirements & Demonstration Experiment David Johnson, Todd Johnson, Vic Scarpine.
Laser Notcher Status Dave Johnson PIP Meeting April 29, 2014.
The ILC Laser-wire system Sudhir Dixit The John Adams Institute University of Oxford.
Commissioning and Data Collection David Johnson Accelerator Physics Center Proton Source Department Meeting June, 23, 2011.
1 Junji Urakawa (KEK, Japan) at Sapphire day, Under development of Quantum Beam Technology Program(QBTP) supported by MEXT from to
PIP Linac Laser Notcher Overview & Plans David Johnson Todd Johnson, Kevin Duel, Fred Mach August 5, 2014 PIP Linac Laser Notcher System Installation Readiness.
IPBSM status and plan ATF project meeting M.Oroku.
Laser Notching Demonstration Experiment (Preliminary Results) David Johnson, Todd Johnson, Matt Gardner, Vic Scarpine, Rick Tesarek.
Getting Beam to NuMI (It’s a worry!) Peter Kasper.
Linac e+ source for ILC, CLIC, SuperB, … Vitaly Yakimenko, Igor Pogorelsky November 17, 2008 BNL.
Simultaneous Delivery of Parallel Proton Beams with the EURISOL Driver
All Experimenters Meeting PIP Report William Pellico on behalf of PIP team 4/7/2013.
Compton/Linac based Polarized Positrons Source V. Yakimenko BNL IWLC2010, Geneva, October 18-22, 2010.
Folienvorlagen für Seminarvortrag. Novel laser concepts HR-mirror out coupling mirror disc cooling diode laser focusing optic diode laser focusing optic.
Proton Driver: Status and Plans C.R. Prior ASTeC Intense Beams Group, Rutherford Appleton Laboratory.
REFERENCES [1] C.Y. Tan, FNAL Beams-doc-3646-v16, 2011 [2] V.N. Aseev, TRACK, the beam dynamics code, PAC05 [3] S. Kurennoy, LA-UR TRANSMISSION.
January 5, 2004S. A. Pande - CAT-KEK School on SNS MeV Injector Linac for Indian Spallation Neutron Source S. A. PANDE.
Laser Notcher Demonstration Experiment Dave Johnson, Todd Johnson, Matt Gardner. Rick Tesarek, Vic Sacrpine.
Advancement in photo-injector laser: Second Amplifier & Harmonic Generation M. Petrarca CERN M. Martyanov, G. Luchinin, V. Lozhkarev Institute of Applied.
Proton Improvement Plan Keith Gollwitzer January 5th, 2015 All Experimenters’ Meeting 11/5/2015Gollwitzer AEM.
Yb:YAG Regenerative Amplifier for A1 Ground Laser Hut Rui Zhang ACCL Division V, RF-Gun Group Nov 20, 2015 SuperKEKB Injector Laser RF Gun Review.
All Experimenters Meeting PIP Report Fernanda G. Garcia on behalf of PIP team 07/01/2013.
PIP Linac Laser Notcher Overview & Plans David Johnson Todd Johnson, Kevin Duel, Fred Mach August 5, 2014 PIP Linac Laser Notcher System Installation Readiness.
Compact X-ray & Emittance Measurement by Laser Compton Scattering Zhi Zhao Jan. 31, 2014.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Brian Sheehy Laser and Timing.
Polarized source upgrade. Source upgrade project Main component delivery: Atomic Beam Source- August 2011 Superconducting solenoid- March-2012.
Design Optimization of MEIC Ion Linac & Pre-Booster B. Mustapha, Z. Conway, B. Erdelyi and P. Ostroumov ANL & NIU MEIC Collaboration Meeting JLab, October.
Proton Improvement Plan Overview Bob Webber July 13, 2011.
David Johnson Jinhao Ruan, Jamie Santucci, Vic Scarpine, Ray Tomlin Presentation to PIP November 16, 2011.
Laser Notcher Status Dave Johnson PIP Meeting June 26,2012.
Booster Losses Keith Gollwitzer PIP and MI 700 kW review January 2015.
Proton Improvement Plan William Pellico Fermilab Institutional Review June 6-9, 2011.
Proton Improvement Plan William Pellico 44th Fermilab Users' Meeting June 1-2, 2011.
Polarized source upgrade RSC, January 11, OPPIS LINAC Booster AGS RHIC ( ) ∙10 11 p/bunch 0.6mA x 300us→11∙10 11 polarized H - /pulse. ( )
3 MeV instrumentation commissioning U. Raich, Federico Roncarolo, F. Zocca Linac-4 Beam Coordination Committee CERN, 18.December 2013 Uli Raich.
Proton Driver Design Keith Gollwitzer Fermilab February 19, 2014.
MeRHIC Internal Cost Review October, Dmitry Kayran for injector group MeRHIC Internal Cost Review October 7-8, 2009 MeRHIC: Injection System Gun.
Proton Improvement Plan Bob Zwaska September 9, 2013 All-Experimenters Meeting.
1 Junji Urakawa (KEK, Japan) at PosiPol2012, Under development of Quantum Beam Technology Program(QBTP) supported by MEXT from to
Nd:YAG Solid Laser Xiangyu Zhou 20. Nov Yb fiber laser system on the ground Menlo 1030nm oscillator Grating stretcher (Transmission) SOA pulse.
September 12-13, 2013 BNL Laser Profile, Energy and Space Charge Potential Monitor Deepak Raparia September 26, 2013.
Overview of Present and Future Laser Diagnostics for Fermilab H- Accelerators Vic Scarpine, Fermilab Presenting for the H- laser diagnostics team 26 Sept.
David Johnson, Todd Johnson, John Sobolewski, Kevin Duel, Peter Prieto, Andrea Saewert 13rd mini-Workshop on Laser Stripping.
Yb:YAG Regenerative Amplifier for A1 Ground Laser Hut Rui Zhang ACCL Division V, RF-Gun Group Nov 20, 2015 SuperKEKB Injector Laser RF Gun Review.
NICA injection complex status
Present and possible future schemes for hadron therapy linacs Alberto Degiovanni for the ADAM team HG2017 Workshop , Valencia.
ILC/ATF-2 Laser System Sudhir Dixit (JAI, Oxford)
Physics design on Injector-1 RFQ
Emanuele (ESS), Alessandro (CERN), Mikel (Tekniker), Hayley (ISIS)
Laserwire: high resolution non-invasive beam profiling
Compton effect and ThomX What possible future?
小型X線源の性能確認実験計画 高輝度・RF電子銃研究会 広島大学 高エネルギー加速器研究機構 浦川順治
JLEIC CCR Path Length and Gap Formation
Presentation transcript:

D.E. Johnson, T.R. Johnson, K.L. Duel, M. Gardner, V. Scarpine, R.J. Tesarek Motivation Notching process in the Booster creates about 30-35% of the total loss on a cycle by cycle basis. This is a major source of activation for tunnel components Move process to 750 keV where component activation does not occur. Figure 1: Booster Losses. When Booster becomes operational at 15 Hz* notching losses at 700 MeV projected to 300W. *Goal of PIP 700 kW upgrade program. Optical Cavity 3DCADmodel of Optical cavity and flange between RFQ and Quad. Laser Notcher Optical cavity flange attached to RFQ showing laser path in to and out of cavity. Flange removed to reveal cavity mirrors an laser path within cavity. (mirror holders removed) Enlarged cavity geometry showing laser and H- ion path. (mirror substrate removed) H-H- Location Concept Removal of outer electron of H- by photoionization with laser -> create H0 ( to be lost) Fraction neutralized (not dependent on H- intensity) Reduction of laser pulse energy Select  LAB = 1064 nm form Yb doped substrate Increase interaction time with multiple interactions Reduce laser pulse width to match bunch length 97% Neutralization assuming: 21 interactions 2 mJ laser pulse energy 0.6 mm H by 10mm V laser profile 2 ns laser pulse length Goals Remove losses due to the notching process from the Booster tunnel  Move the process to 750 keV line Develop a laser system / optical cavity that:  will fit into the highly constrained space in the 750 keV MEBT  will generate an arbitrary number of notches within a linac pulse  will generate an arbitrary notch length for each notch  will be capable of neutralization of 99% of the H- ions in each H- bunch Linac Pulse structure with notches. Beam Stacker Half-wave plates rotate polarizations to +/-45 degrees, allowing BBO crystals to Equally split the beam Merging beamlets by increasing Input Gaussian beam size to form roof-top profile BBO crystal geometry and Impact on a polarized beam (figure from Pmoptics.com white paper) (a technique for Gaussian to roof-top spatial profile) Demonstration Experiment Wall Current Monitor Laser profile used in Experiment Experimental layout using installed Optical Cavity We would like to thank the following who contributed to the success of the Demonstration Experiment. Comparison with measurement Demonstration Experiment used Quantel 100 mJ Q-switched Nd:YAG laser Profile from Quanel vs Diode & fiber amplifier Laser System 450 kHz burst 200 MHz pulses in each burst Single 200 MHz pulses to match bunch temporal structure Laser IN Laser OUT MIRROR Laser IN Laser OUT A “Notch” is a segment of the circumference of an accelerator void of beam to allow for the extraction kicker rise time. (In Booster ~60ns out of 2.2  s.) ~2.5” --- Mirrors ~ 25 mm square R=99.95% --- H- bunch frequency MHz -- bunch length ~1.5-2 ns Andrea Saewert Mike Kucera Jamie Santucci Fred Mach High Rise & PPD Machine shops Matt Quinn Dave Baird Ray Lewis Fernanda Garcia, Bob Zwaska, Bill Pellico