San Rafael, California November 12, 2015

Slides:



Advertisements
Similar presentations
NPDES Phase II Permit City of St. Louis Park Annual Storm Water Informational Meeting April 16, 2009 Scott Anderson Superintendent of Utilities.
Advertisements

Internalizing Stormwater Requirements Between TBR and Facilities Construction Projects and Permanent Stormwater Treatment Mgmt. Steve Casey, PE, CPESC.
GEORGETOWN COUNTY STORMWATER DIVISION Breakfast Series #3 How to Prepare a Stormwater Pollution Prevention Plan January 14, 2009.
1 Overview of Regulations for Water Quality Protection in South Carolina n Federal Clean Water Act/ NPDES Storm Water Program n South Carolina Pollution.
Final Construction Stormwater General Permit Issued November 16, 2005 Jeff Killelea Department of Ecology.
Construction Site Stormwater Compliance Presentation for CALBIG October 9, 2013 Kristin Kerr, P.E., QSD EOA, Inc. on behalf of the San Mateo Countywide.
A State’s Perspective of the EPA’s Effluent Limitations Guidelines 40 CFR Part 450 Jeffrey B. Shaver, PE, CPESC AASHTO Subcommittee On Design July 27,
Future of the Construction and Post Construction Water Quality Program
Adem.alabama.gov Association of County Commissions of Alabama December 4, 2014 Montgomery, Alabama Small Mining General Permit Jeffery W. Kitchens, Chief.
Environmental Harm Urban stormwater frequently contains litter, oil, chemicals, toxic metals, bacteria, and excess nutrients, like nitrogen and phosphorous.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Arkansas Storm Water Program Arkansas Update On Construction, Industrial & Small MS4.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
NPDES REQUIREMENTS. Pollution Control is Contractor’s responsibility PennDOT is responsible for enforcement Its our Public Duty Environmental compliance.
Env 247 Overview of Stormwater Management March 1, 2011.
AZPDES and Construction Sites Greg Wise Environmental Program Specialist Arizona Department of Environmental Quality (602)
SPDES General Permit for Stormwater Discharges During Construction Activity GP Mike Jurkowski, CPESC, NYSDOT - Summary of Changes From GP
Module V Final Wrap-Up ModuleTopic 0Overview IIntroduction II Soil Stabilization (SS) and Sediment Control (SC) III Tracking, Wind Erosion, and Construction.
Module 7: Construction Phase
RIPDES Storm Water Program: Large and Small Construction.
Municipal Regional Permit Provision C.6 Dan Cloak, P.E. Principal Dan Cloak Environmental Consulting.
Introduction to Construction General Permit Inspections Pre-Inspection Preparation.
Municipal St rm Water Program. Storm Water Programs Industrial –bus maintenance yards Construction –addition of a gym Municipal.
A Review of the Hollis Stormwater Management Ordinance Todd H. Dresser, CHMM Cuoco & Cormier Engineering Associates.
Creating a Storm Water Pollution Prevention Plan For Construction Activities.
Response to Comments Workshop Presented by: Eric Beck, P.E. RIDEM July 24, 2003 Developed by: Laura Stephenson, Greg Goblick, Margarita Chatterton.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
Construction Site Best Management Practices and the Project Design Process.
Integrity ♦ Innovation ♦ Accountability ♦ Commitment to Excellence ♦ Teamwork City of Southlake Storm Water Management Plan Christi Upton
Introduction to MS4 Stormwater Requirements (2009)
Local Government Assistance Phase II Storm Water Rule Erie County Department of Environment & Planning.
Construction Stormwater Rules-2012 Rodney Hendrick, Ph. D. Louisiana Urban Stormwater Coalition.
Erosion & Sediment Control. Wind Erosion Water Erosion.
Storm Water: Federal Enforcement and Compliance for Phase II MS4.
Overview of Montana’s Stormwater Regulatory Program.
Construction & Post-Construction Stormwater Ordinance City of Wenatchee, Public Works Department Jessica Shaw, Environmental Manager.
Workshop on the draft General Permit for Discharges of Storm Water from Small MS4s Fresno August 6, 2002 Redding August 8, 2002 San Luis Obispo August.
Urban Programs. Urban Programs - ESC Virginia Erosion and Sediment Control (ESC) Law –Approved in –Title 10 of the Code of Virginia. “Each District.
Regulatory Refresher What Construction Site Inspectors Need to Know about the MRP Kristin Kerr, P.E., QSD EOA, Inc. Construction Inspection Workshop April.
Stormwater and C.3 Overview Tom Dalziel, Assistant Manager Contra Costa Clean Water Program.
Phase II National Storm Water Regulations What’s in it for you?
 Storm Water Pollution Prevention Plan (SWPPP)  All dischargers over 1-acre must develop a SWPPP  6 major portions of every SWPPP Site Evaluation and.
Test Your Storm Water Knowledge!
Erosion and Sediment Control Programs at the Cities of Colleyville, Keller, Grapevine, Southlake, and Trophy Club Jimmy Brock, City of Colleyville Keith.
February 11, 2011 Industrial Stormwater Permit and Annual Report Preparation Instructor: George Caamano.
Erosion and Sediment Control Plans (ESCPs) San Rafael, California November 12, 2015 Marin County Stormwater Pollution Prevention Program.
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
1 Module 1: Refresh Your Perspective on the Storm Drain System Stormwater System Maintenance: A 4-Part Workshop Series.
SW101 Large and Small Construction Denise Hamilton, EPA Region 6 8 th Annual Region 6 MS4 Operators Conference June 26, 2006.
Bud Amorfini – R6SLT Paul Keiran – R1 Compliance Inspection Reports and Data Reporting Course Overview Introduction and Inspector Qualifications Pre-Inspection.
Program Overview Town of Wrightsville Beach Public Works Department Stormwater Services.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
1. Wolfeboro’s Tool Kit Implemented tools for water quality protection Municipal Watershed District Ground Water Protection Overlay District Steep Slope.
Commercial, Industrial, and High-Risk Runoff 6/13/20161 Commercial, Industrial and High Risk Runoff.
Pollution Control: For Field Office Construction Sites.
North Hennepin Community College MS4 Plan October 24, 2014.
Expectations for Construction Activities The City of Hendersonville Department of Public Works Erosion Control Inspection Review Process Power Point Presentation.
NPDES Stormwater Rules Phase 1 implemented in 1990 –Large cities (
Erosion and Sediment Control Ordinance. City of Southlake Strategy Map Live Our Core Values The City of Southlake provides municipal services that support.
ODOT District MS4 Liaison Training: Why are we here?
Ohio Department of Transportation
MS4 On-site evaluations & common findings
TPDES Construction Management at the City of Laredo
Sacramento County Stormwater Quality Program
Stormwater Management Program
ECM SERVICES Group Stormwater Monitoring Program
Stormwater Pollution Prevention Plans
ECM SERVICES Group Stormwater Monitoring Program
Illicit Discharge Detection & Elimination (IDDE) Plan
Sacramento County Stormwater Quality Program
Presentation transcript:

San Rafael, California November 12, 2015 Marin County Stormwater Pollution Prevention Program ESCP Inspections San Rafael, California November 12, 2015

MSCTOPPP inspection checklist Basic 2 page form Allows inspectors to note if required BMPs are present and either adequate or non-compliant

Inspection Log

Inspection log rolls up your inspection records Date of inspection Location of project/property Inspection type Inspector’s name/initials BMP status Installed per plan Maintained Effective Deficiencies (none, identified, corrected) Notes

Municipal inspection frequency MCSTOPPP’s Construction Site Performance Standards requires inspections after each major storm event Phase II Permit requires prioritizing inspections and conducting inspections at certain check points MCSTOPPP Major storm event definition “A storm or series of storms of such intensity or duration as to create significant quantities of runoff and potential for erosion. A series of storm events will be considered one major storm event if there is less than 72 hours of dry weather between storms.”

Municipal inspection frequency: “Normal priority” Types of Projects Inspection Requirements Normal Projects subject to ESCP Projects covered by the CGP Projects subject to the CGP waiver Prior to land disturbance if starts during rainy season After each major rain event The agency can require the project proponent to conduct and document these inspections Once during active grading At conclusion of project  Projects on the Bolinas Mesa Weekly inspections

Municipal inspection frequency: “High priority” Trigger Inspection Requirements High Projects with BMP implementation problems as determined by agency inspector or verified complaint 1- 4 Same as above 5. Re-inspection after inspector identifies BMP problem or complaint to verify corrections Agency can require project proponent to submit proof (photo) demonstrating corrections have been made.

Construction operators need to inspection projects Operator inspections check implementation of the ESCP and compliance with local ordinances Planned BMPs are implemented and effective No discharges of sediment laden water No discharges of construction wastes or materials (including litter) Agencies can require projects to conduct post rain event inspections Best practice – use check list to document inspection weekly. Site entrance needs to be inspected daily (or more frequently). CGP projects – must inspect per CGP required frequency

Role of the municipal inspector Be familiar with the MCSTOPPP Standard ESCP Template Use ESCP and Site Plan to guide site inspection Recognize authorized and unauthorized non-stormwater discharges Be familiar with standard construction site BMPs Understand what they are, how they work, and when to deploy them Know who your QSP is and seek her/his advice on BMPs and ESCPs

Role of the construction operator Use the ESCP and Site Plan to guide inspection Confirm planned BMPs are implemented and effective Notify local agency when the ESCP needs to be changed Recognize authorized and unauthorized non-stormwater discharges Be familiar with standard construction site BMPs Understand what they are, how they work, how to install them, and how to inspect them

Questions