WG 6 and Support Activities Overview Status Report Reference Version and Implementation WG Coordinator and Project Leader: Ulrich Schättler.

Slides:



Advertisements
Similar presentations
COSMO Workpackage No First Results on Verification of LMK Test Runs Basing on SYNOP Data Lenz, Claus-Jürgen; Damrath, Ulrich
Advertisements

TSS Project Update WRAP Technical Analysis Forum San Francisco, CA October 11, 2007.
This is the footer Running WRF on HECToR Ralph Burton, NCAS (Leeds) Alan Gadian, NCAS (Leeds) With thanks to Paul Connolly, Hector.
System Implementation
Gauss: Generator Status Patrick Robbe, LAL Orsay, 6 Oct 2009.
U.S. Postal Service - CONFIDENTIAL ® Information Technology Update MTAC November 18, 2010.
Deutscher Wetterdienst Status of the Support Activities and WG 6 Activities COSMO Working Group 6: Reference Version and Implementation Working Group Coordinator:
GRD - Collimation Simulation with SIXTRACK - MIB WG - October 2005 LHC COLLIMATION SYSTEM STUDIES USING SIXTRACK Ralph Assmann, Stefano Redaelli, Guillaume.
SRNWP data pool Jean-Marie Bettems / MeteoSwiss Claudia Heret / DWD COSMO GM Roma, September 5 th, 2011.
HND ACCOUNTING 2010 Framework – Year 2 Delivery The story so far.
13 ° COSMO General Meeting Rome VERSUS2 Priority Project Report and Plan Adriano Raspanti.
Interoperability between the European NWP modelling systems Ulrich Schättler, François Bouttier, Xiaohua Yang, Radmila Brozkova, Alan Radford A Report.
C HU H AI C OLLEGE O F H IGHER E DUCATION D EPARTMENT O F C OMPUTER S CIENCE Preparation of Final Year Project Report Bachelor of Science in Computer Science.
12° COSMO General Meeting – Moscow Sept 2010 VERSUS2 Priority Project Report Adriano Raspanti.
Science Plan and SPM report COSMO General Meeting, 9 September 2010.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss News from COSMO COSMO User Workshop 2010.
Status of COSMO Software and Documentation Ulrich Schättler Deutscher Wetterdienst COSMO Annual Meeting 2003.
Status of the Support Activities WG 6: Reference Version and Implementation WG Coordinator: Ulrich Schättler.
Deutscher Wetterdienst Status of the COSMO-Web Page COSMO Working Group 6: Reference Version and Implementation Web Page Administrator: Theodore Andreadis.
Deutscher Wetterdienst Status of the Support Activities, and other WG6 Issues COSMO Working Group 6: Reference Version and Implementation Working Group.
Overview on the Work of WG 6 Reference Version and Implementation WG Coordinator: Ulrich Schättler.
VERSUS2 – A new priority project for verification Pj Leader – Angela Celozzi.
Status of the COSMO-Model Package Ulrich Schättler.
Overview on the Work of WG 6 Reference Version and Implementation WG Coordinator: Ulrich Schättler.
Development of a one-dimensional version of the Hirlam-model in Sweden Background: This model has been run operationally for about nine years now. Mainly.
WG 6 and Support Activities Overview Status Report Reference Version and Implementation WG Coordinator and Project Leader: Ulrich Schättler.
Manno, , © by Supercomputing Systems 1 1 COSMO - Dynamical Core Rewrite Approach, Rewrite and Status Tobias Gysi POMPA Workshop, Manno,
Advanced interpretation and verification of very high resolution models National Meteorological Administration Rodica Dumitrache, Aurelia LUPASCU,
WG 6 and Support Activities Plans for the next Year.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Status of MeteoSwiss 18 September 2008 COSMO GM 2008.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss WG 3: Overview status report COSMO General Meeting, 19.
COSMO – 09/2007 STC Report and Presentation by Cosmo Partners DWD, MCH, USAM / ARPA SIM, HNMS, IMGW, NMA, HMC.
Status of the COSMO-Software and Documentation WG 6: Reference Version and Implementation WG Coordinator: Ulrich Schättler.
Status of the COSMO web Cosmin Barbu, Rodica Dumitrache, Bogdan Maco National Meteorological Administration of Romania.
Changes to COSMO Software and Documentation Ulrich Schättler Deutscher Wetterdienst COSMO Annual Meeting 2004.
Deutscher Wetterdienst COSMO-ICON Physics Current Status and Plans Ulrich Schättler Source Code Administrator COSMO-Model.
C HU H AI C OLLEGE O F H IGHER E DUCATION D EPARTMENT O F C OMPUTER S CIENCE Preparation of Final Year Project Report Bachelor of Science in Computer Science.
The Online World ONLINE DOCUMENTS. Online documents Online documents (such as text documents, spreadsheets, presentations, graphics and forms) are any.
ARSC/IARC Report DOD/RACM Workshop, December Juanxiong He 1,2 Greg Newby 1 1. Arctic Region Supercomputing Center 2. International Arctic Research.
Deutscher Wetterdienst COSMO-Standards for Source Code Development A Discussion COSMO Working Group 6: Reference Version and Implementation Working Group.
Vincent N. Sakwa RSMC, Nairobi
Agreements on... Interim ELDAS Data coordination meeting Time schedule for soil moisture production –Submission of results for two month period –Preparation,
Deutscher Wetterdienst 1FE 13 – Working group 2: Dynamics and Numerics report ‘Oct – Sept. 2008’ COSMO General Meeting, Krakau
Tiziana Paccagnella COSMO General Meeting Bucharest Report from the Scientific Project Manager 7th COSMO GENERAL MEETING.
Status of the NWP-System & based on COSMO managed by ARPA-SIM COSMO I77 kmBCs from IFSNudgingCINECA COSMO I22.8 kmBCs from COSMO I7 Interpolated from COSMO.
WG 3: plans for next year COSMO General Meeting 23 September 2005 Marco Arpagaus.
INSTYTUT METEOROLOGII I GOSPODARKI WODNEJ INSTITUTE OF METEOROLOGY AND WATER MANAGEMENT TITLE: IMGW in COSMO AUTHOR: Michał Ziemiański DATA:
MAUS Status A. Dobbs CM43 29 th October Contents MAUS Overview Infrastructure Geometry and CDB Detector Updates CKOV EMR KL TOF Tracker Global Tracking.
Status of the COSMO web Cosmin Barbu, Rodica Dumitrache National Meteorological Administration of Romania.
Chapter 25 – Configuration Management 1Chapter 25 Configuration management.
New task within PT Support Activities “Support of COSMO licensees”
Operational COSMO of MeteoSwiss
Overview on the Work of WG 6
The COSMO Coding Standards Some Highlights
Status of the COSMO-Software and Documentation
The Writing Process.
Overview of the COSMO NWP model
Experience with Maintaining the GPU Enabled Version of COSMO
External Projects related to WG 6
Implementation of a general tracer treatment
Preliminary evaluations of COSMO RO using VERSUS
GRIB2 and ecCodes in the COSMO-Model
COSMO-Model New Versions and Plans
Education and Training Statistics Working Group – 2-3 June 2016
Ulrich Schättler Source Code Administrator
The COSMO Coding Standards Some Highlights
Guidelines for future developments Tiziana Paccagnella, ARPA-SIM
Preparing a new Model Version according to Source Code Management
Support Activities and WG 6 Overview Status Report
Presentation transcript:

WG 6 and Support Activities Overview Status Report Reference Version and Implementation WG Coordinator and Project Leader: Ulrich Schättler

th General COSMO Meeting --- Athens, Greece 2 Subtasks of SA 1.Source Code Administration 2.Web Page Administration  Contents Management  Web Master 3.Documentations, Newsletter, Technical Report  Documentation  COSMO Newsletter  Technical Reports

th General COSMO Meeting --- Athens, Greece 3 Source Code Administration COSMO-Model 3.21: ( ) –Preparations of Ensemble Mode (/EPSCTL/, /TUNING/) –Implementation of last changes for Runge-Kutta dynamical core –Update of the FLake Model –Diagnostic Package for the Latent Heat Nudging –Update of Restart scheme –Splitted file YUPRMEAN to YUPRMASS and YUPRHUMI COSMO-Model 3.22: ( ) –New Version of cloud microphysics ( hydci_pp )

th General COSMO Meeting --- Athens, Greece 4 Source Code Administration COSMO-Model 3.23: ( ) –Technical changes and bug fixes –Topographical corrections in the radiation scheme –New treatment of lateral boundaries for moisture variables –Introduced option to calculate volume- and surface integrals over arbitrary cuboid COSMO-Model 3.24: ( ) –New version of cloud microphysics; here: Graupel scheme

th General COSMO Meeting --- Athens, Greece 5 Source Code Administration Some more updates for bugfixes and consolidation of the schemes. Now we have: COSMO-Model Version 4.0 –Fully implemented all developments for high resolution (LMK-Project, work at other centers) –Fully implemented all changes for running the model in climate mode (long simulations, updating external parameters, NetCDF,…)

th General COSMO Meeting --- Athens, Greece 6 Source Code Administration INT2LM 1.5 ( ; Development Version) –Implementation of the changes for high-resolution runs (LMK- Project) –Started implementation of changes from the climate community (NetCDF, special interpolation procedures) –Implemented possibility for interpolating additional variables (e.g. chemistry variables) INT2LM 1.6 ( ; Development Version) –(First) full implementation of all changes from the climate community Still missing: –Computation of external parameters for topographical corrections in the radiation scheme –Distribution and testing

th General COSMO Meeting --- Athens, Greece 7 Web Page Administration The Contents Manager: –Rodica Dumitrache and Cosmin Barbu work together on the Contents Management of the Web Page. –But still, not much updated pages can be seen on the Web (just some minutes) –New pages are developed to present all necessary information for the Priority Projects on the Web Material is gathered from the Project Managers It is edited and formatted in Romania More FTEs will be allocated to Romania therefore (0.3) –Work is delayed, because of several reasons: People are not delivering material People who wanted to write updates, did not have time The Contents Manager are not aggressive enough gathering material

th General COSMO Meeting --- Athens, Greece 8 Web Page Administration Technical Administration: –The mirror at CSCS in Manno: ( is working again. –HNMS will upgrade its connection to the web Overall Situation is not satisfying: –How can we speed up the update-process? –Does a Contents Management System help? –If we invest more FTEs, but do not get a better result, we have to apply dramatic measures.

th General COSMO Meeting --- Athens, Greece 9 Documentation No work has been done for updating the documentation It is the same story as for the Web: –Writing documentation seems to be a lower priority job –We all are overloaded with other work

th General COSMO Meeting --- Athens, Greece 10 COSMO Newsletter No COSMO Newsletter could be published since the last GM Reason: see also last slides The gathered material will not be lost. Even if a printed version will not be available, the single contributions will be put to the Web. The contributions will be „citeable“ Nevertheless: Same procedure as every year: you can submit contributions to the next-next Newsletter

th General COSMO Meeting --- Athens, Greece 11 COSMO Technical Report No COSMO Technical Report was published last year NOTE: A COSMO Technical Report is a good possibility for Priority Projects and also for other Work Packages to report about their work in detail!

th General COSMO Meeting --- Athens, Greece 12 THE END Thank you for your Attention