Contemporary Engineering Economics

Slides:



Advertisements
Similar presentations
Real Options & Business Decision Making John Curtis.
Advertisements

SESSION 20: THE ESSENCE OF REAL OPTIONS Aswath Damodaran 1.
Study Unit 10 Investment Decisions. SU – The Capital Budgeting Process Definition – Planning and controlling investment for long-term projects.
CHAPTER 14 Real Options.
1 Finance: Net Present Value 8.1 ECON 201 Summer 2009.
Valuation of Financial Options Ahmad Alanani Canadian Undergraduate Mathematics Conference 2005.
Lecture 8 - Capital Budgeting: Estimating Cash Flows and Analyzing Risk.
CORPORATE FINANCIAL THEORY Lecture 3. Interest Rate Cash Flow Interest Rate and Cash Flow - REALITY Is not guaranteed Has many different sources.
Valuation and Rates of Return
WEMBA 2000Real Options26 Introducing Real Options What are Real Options? Expansion Options: Starsoft Inc. is considering expanding its internet software.
Real Options The Right to do Something Real. Introduction The classical DCF valuation method involves a comparison between the cost of an investment project.
Project Interactions, Side Costs, and Side Benefits 05/05/08 Ch. 6.
CHAPTER 13 Other Topics in Capital Budgeting Evaluating projects with unequal lives Identifying embedded options Valuing real options in projects.
Chap 5 Numerical Methods for Simple Options.  NPV is forced to treat future courses of action as mutually exclusive, ROA can combine them into a single.
FIN 453: Cases In Strategic Corporate Finance 1 REAL OPTIONS OLD FASHION IDEAS FOR NEW METHODOLIGIES IN CAPITAL BUDGETING.
FINA 522: Project Finance and Risk Analysis Lecture 12 Updated: 19 May 2007.
Copyright K. Cuthbertson, D.Nitzsche FINANCIAL ENGINEERING: DERIVATIVES AND RISK MANAGEMENT (J. Wiley, 2001) K. Cuthbertson and D. Nitzsche Lecture Real.
Copyright © 2001 by Harcourt, Inc.All rights reserved. CHAPTER 13 Other Topics in Capital Budgeting Evaluating projects with unequal lives Evaluating.
Copyright © 2003 Pearson Education, Inc.Slide 17-1 Chapter 17 Real Options.
Real Options and Other Topics in Capital Budgeting
Corporate Valuation, , p. 1 Institut for Regnskab, Tom Hansen Last session: The 5 steps Workshop Dialogue and coaching Exercise 12.4 This lecture:
Three-way choice Option Price Option Value Real Options Calls & Puts Endogenous/Exogenous Option Price Option Value Real Options Calls & Puts Endogenous/Exogenous.
Chapter McGraw-Hill/Irwin Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. 24 Option Valuation.
Days 8 & 9 discussion: Continuation of binomial model and some applications FIN 441 Prof. Rogers Fall 2011.
Introduction to real options1 From financial options to real options 1. Introduction to real options Prof. André Farber Solvay Business School Hanoi April.
McGraw-Hill/Irwin Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved. 8-0 Corporate Finance Ross  Westerfield  Jaffe Sixth Edition.
1 Today Evaluating projects ‧ Real options ‧ Alternative investment criteria Reading ‧ Brealey, Myers, and Allen Chapters 5, 10, and 11.
McGraw-Hill © 2004 The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Making Capital Investment Decisions Chapter 9.
Yale School of Management 1 Emerging Market Finance: Lecture 10: The Real-Option Approach to Valuation in Emerging Markets.
Contemporary Engineering Economics, 4 th edition, © 2007 Comparing Mutually Exclusive Alternatives Lecture No.18 Chapter 5 Contemporary Engineering Economics.
Days 8 & 9 discussion: Continuation of binomial model and some applications FIN 441 Prof. Rogers Spring 2011.
Prof. Ian Giddy New York University Valuation of New Ventures.
McGraw-Hill/Irwin Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights reserved. 8-0 Corporate Finance Ross  Westerfield  Jaffe Seventh Edition.
Lecture No.14 Chapter 4 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010.
Week 2 Seminar Principles of Corporate Finance Eighth Edition Chapter 2, 3, and 4 Adopted from slides by Matthew Will Copyright © 2006 by The McGraw-Hill.
Chapter 7 Fundamentals of Capital Budgeting. 7-2 Chapter Outline 7.1 Forecasting Earnings 7.2 Determining Free Cash Flow and NPV 7.3 Analyzing the Project.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Basics of Financial Options Lecture.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Rate of Return Analysis Lecture No.
CHAPTER 13 Option Pricing with Applications to Real Options
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Investing in Financial Assets Lecture.
MINICASE.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Effects of Inflation on Project Cash.
J. K. Dietrich - GSBA 548 – MBA.PM Spring 2007 Investment Strategy April 11, 2007 (LA) or April 5, 2007 (OCC)
Chapter McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Valuation and Rates of Return 10.
Real Option Valuation Marking to Market Prof. Luiz Brandão 2009.
12-1 Capital Budgeting and Financial Planning LECTURE 22 Course Instructor: M. Jibran Sheikh.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Estimating Project Volatility Lecture.
© 2003 The McGraw-Hill Companies, Inc. All rights reserved. Option Valuation Chapter Twenty- Four.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Decision-Tree Analysis Lecture No.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Replacement Decisions Lecture No.
A Cursory Introduction to Real Options Andrew Brown 5/2/02.
Kim, Gyutai Dept. of Industrial Engineering, Chosun University 1 Properties of Stock Options.
FIN 614: Financial Management Larry Schrenk, Instructor.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Discounted Cash Flow Analysis Lecture.
13-1 CHAPTER 13 Real Options and Other Topics in Capital Budgeting Identifying embedded options Valuing real options in projects Evaluating projects with.
Interest Formulas for Single Cash Flows
Dr. M. Fouzul Kabir Khan Professor of Economics and Finance North South University Lecture 5: Project Appraisal Under Uncertainty.
Lecture 03.0 Project analysis Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved McGraw-Hill/Irwin.
1 Real Options Ch 13 Fin The traditional NPV rule is a passive approach because … The traditional NPV approach assumes  mangers do not have influence.
Corporate Income Taxes
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Engineering Economic Decisions Lecture.
1 CHAPTER 12 Real Options Real options Decision trees Application of financial options to real options.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Economic Equivalence Lecture No.
Copyright © 2002 South-Western Financial options Black-Scholes Option Pricing Model Real options Decision trees Application of financial options.
1 Other Topics in Capital Budgeting Evaluating projects with unequal lives Evaluating projects with embedded options Valuing real options in projects.
Real Options in Project Evaluation: Project Timing Stephen Gray Campbell R. Harvey.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Comparing Mutually Exclusive Alternatives.
CHAPTER 14 Real Options.
Introducing Real Options
Presentation transcript:

Contemporary Engineering Economics Real Options Analysis Lecture No. 44 Chapter 13 Contemporary Engineering Economics Copyright © 2016

What Is Real About “Real” Options? Concept: Any corporate investment decision to invest and or divest real assets is simply an option, giving the option holder a right to make an investment decision without any obligation to act. At Issue: Can we apply the same logic used pricing financial options to value the real assets? Financial options analysis is mostly used in trading. Real options analysis generally is used for valuing the real assets and strategic decision making.

Decision Tree vs. Real Options Good news Invest Good news Invest Don’t Bad news Good news Invest Don’t Bad news Bad news Don’t Real Options Analysis Decision Tree Analysis

Real Option Premium

Real Options: A New Math in Action Step 1, evaluate each stage of the project separately. Step 2, understand your options. Step 3, reevaluate the project, using an options mind-set. Step 4, go figure. From “Exploiting Uncertainty—The ‘Real-Options’ Revolution in Decision-Making,” BusinessWeek, June 7, 1999, p.119.

The Analogy Between a Call Option on a Stock and a Real Option Figure: 13-10

Types of Real Options In general, six real options exist in the decision-making process. The option to postpone (or delay) the investment decision The growth option to scale up an initial project if events are favorable The option to abandon a project if events are unfavorable The option to scale back (or contract) an initial project if events become unfavorable The option to switch strategies once an initial strategy has been selected The option to invest contingently (i.e. invest a little now; if events are favorable invest a little more, or if not abandon.)

Delay Option The decision-maker (DM) does not always need to initiate a project immediately. The DM has the option to postpone the investment decision due to: Uncertainty in market demand Uncertainty in market timing Uncertainty in market input/output prices Real options analysis (ROA) values the flexibility to postpone the investment decision.

Example 13.9: Delaying Investment: Value of Waiting Given: Financial data Launch cost: $50M Expected sales: $12M per year (Random variable) Risk-adjusted discount rate: 12% Product life: 5 years Launch cost after 2 years: $60.5M Find: Is it worth waiting for 2 years? By waiting, what do you gain? How much would it worth if you were given the opportunity to delay the project for two years? Do not wait: conventional NPW $12 $12 $12 $12 $12 1 2 3 4 5 6 7 PW(12%) = $12(P/A,12%,5) - $50 =-$6.74 < 0

Real-Options Approach Given: V0 = $34.49, I = $60.5, T = 2 years, r = 6%, and σ = 50% Find: ROP Conclusion: Since ROP > 0, it is worth retaining the delay option as long as the cost of this option does not exceed $11.5M. Figure: 13-11EXM

Economic Interpretation What exactly does the $4.76 M delay value imply? Assume the firm has 10 projects. One of these 10 projects is this digital phone investment. Assume the other 9 projects have a net present value of $100 M. Standard NPV: The value of the firm using standard NPV would still be $100 M including the digital phone project because the project has a negative NPV today and would not be accepted. Delay Option: If the option to invest in the digital phones is included in the firm evaluation, then the value of the firm is $104.76 M. Therefore, the delay option that the firm possesses is worth an additional $4.76 M.

Growth Option A growth option occurs when an initial investment is required to ‘support’ follow-on investments Phased expansion Web-based technology investment Market positioning The amount of loss from the initial investment represents the call option premium. Investing in the initial investment provides the option to invest in any follow-on opportunities.

Example 13.11: Valuation of a Growth Option Given: Two different markets Years 0–3: Market the product locally. Years 4–7: Expand the market regionally, if events are favorable. Find: Value of the growth option Cash flow associated with two investment opportunities $10 $12 $14 $16 $18 $20 A small scale investment A large scale $30 I 3 = $60 V = $55.8 1 2 4 5 6 7 = $39.56

NPV Analysis Let the risk-adjusted discount rate (MARR) = 12% and the r = 6%. The present value of the investments are: NPVSmall[0] (12%) = −$1.54 M [in year 0] NPVLarge[3] (12%) = −$60 + $55.58 = −$4.42 M [in year 3] Therefore, NPVTotal[0] (12%) = −$1.54 − $4.42/1.123 = −$4.68 M < 0

Real Options Decision Framework After investing in the small-scale project, the firm is not obligated to invest in the large-scale phase—hence, it is an option. The value of these two investment opportunities is: ENPV = NPVSmall + OptionExpand Large Where ENPV = Expanded Net Present Value

The Value of the Option The option to expand can be valued as a European call option using the B-S equation. The option inputs are: VLarge[3] = $55.58 M VLarge[0] = 55.58/1.123 = $39.56 M I3 = 60 T = 3 r = 6% σ = 40% The value of the option is $7.54 M.

Economic Interpretation Therefore, the total value of the two investment opportunities is: FNPV = NPVSmall + OptionExpandLarge FNPV = −$1.54 + $7.54 = $6 M [Compared with the standard NPV = −$4.68 M] Conclusion: Because the FNPV > 0, the two investment opportunities have positive value and should be pursued. Even though the initial investment in the local market will lose money, the benefits of the large-scale investment offset any initial losses. Note: Recall that NPVSmall also represents the option premium paid. Therefore, the maximum loss on the NPVSmall should not exceed OptionExpandLarge. This is equivalent to EVPI in decision tree analysis. For example, if the estimated NPVSmall was negative $9 M, then these two investment opportunities should not be pursued all together.

Scale-up Option A firm has the right to scale-up an investment if the initial project is favorable. A firm has the option to increase investment in a project, in return for increased revenues. This is just a growth option, but will be valued on a binomial lattice.

Example 13.12: Scale-Up Option Using Binomial Lattice Approach Lattice Evolution of the Project Value Given: The project’s current value is V0 = $10M. Anytime over the next three years, the firm can invest an additional I = $3 M and receive an expected 30% increase in net cash flows and therefore, a 30% increase in project value. The risk-free interest rate is 6% and the volatility of the project’s value is 30%. Find: Value of scale-up option

Process of Calculating Option Value Lattice Evolution of the Underlying Value Process of Reaching a Decision at Node Figure: 13-13EXM

Valuation Lattice: Decision Tree for a Scale-Up Option Option value = $11.23 − $10 = $1.23M Figure: 13-15EXM

Economic Interpretation The end result option value on the binomial tree represents the FNPV. The value of the scale-up option itself is: ENPV = NPV + Option Value from Expansion Option = ENPV − NPV = 11.23 − 10 = $1.23 M Therefore, the option to expand the project in the future is worth $1.23M.

Scale-down Option A firm has the right to scale-down an investment if the initial project is unfavorable. This is a scaled version of the abandonment option and will be valued on a binomial lattice.

Example: Scale-down Option A project has been undertaken within a firm. The firm has the option to sell some of its equipment and facilities and sublet out the same project workload. Given: The projects current value is V0 = $10 M. Anytime over the next 3 years, the firm can sell off $4 M in resources but receive an expected 30% decrease in net cash flows (and therefore, a 30% decrease in project value). Let the r = 6% and the σ = 30%. A binomial lattice will be used with a one-year time increment. Find: Value of scale-down option

Binomial Lattice with Scale-Down Option 24.60 max(0.7*24.6 + 4, 24.6)= 24.6 Do not scale-down u = e.3(1) = 1.35 d = 1/1.35 = 0.74 q = 0.53 w = e−.06(1) = 0.94 18.23 max(18.23*0.7 + 4, 18.22)= 18.22 Do not scale-down 13.5 max(0.7*13.5 + 4, 13.5)= Do not scale-down 13.5 max(13.5*0.7 + 4, 13.94)= 13.94 Do not scale-down 10 max(10*0.7 + 4, 10.78)= 11 Scale-down 10 11 7.4 max(0.7*7.4 + 4, 7.4)= 9.18 Scale-down 7.4 max(7.4*0.7 + 4, 8.94)= 9.18 Scale-down 5.48 max(5.48*0.7 + 4, 7.59)= 7.836 Scale-down 4.05 max(0.7*4.05 + 4, 4.05)= 6.835 Scale-down

Economic Interpretation The end result option value on the binomial tree represents the FNPV. The value of the scale-down option itself is: ENPV = NPV + Option Option = ENPV − NPV = $11 − $10 = $1 M Therefore, the option to scale-down the project in the future is worth $1 M.

Compound Options The value of option depends on the value of another option. A sequential compound option exists when a project has a multiple phases and later phases depend on the success of earlier phases. Invest a little, observe results; the option to invest more Local, regional, national, international Phased investment Research & development Growth opportunities

Example 13.13: “A Real-World Way to Manage Real Options” Given: It requires $60 million cost of permits and preparation. At the end of year 1, you have the right to invest $400 million on design phase. You have the right to invest $800 million in building the plant over the following two years. The firm’s risk adjusted discount rate (MARR) is 10.83%. If the plant existed today, its value would be $1 billion. The volatility of the value is 18.33%. The risk-free interest rate is 8%. Find: Is it worth initiating a new chemical plant?

Phases of Project

Compound Option Framework Investing in permit/preparation (or Phase 0) provides option to invest in design phase (Phase 1). Investing in design phase provides the option to invest in plant construction (Phase 2). Therefore, investing in Phase 2 is contingent upon investing in Phase 1, which is contingent upon the results of Phase 0.

How to Calculate the Combined Option Value Compound Real Options Phase 2 Phase 1 Phase 0 Calculate the Phase 0 option last. Calculate the Phase 1 option second. Calculate the Phase 2 option first.

(a) Traditional NPV Analysis Given: Risk-adjusted discount rate = 10.83% Find: NPW $400M $800M $60M 1 2 3 $1B

(b) Real Options Analysis: Step 1 The event tree that illustrates how the project’s value changes over time Figure: 13-17EXM

Step 2: Valuing Phase 2 Options At Issue: Is it worth keeping the option open at Year 2, assuming that you were at node B? Keeping the option open Exercise (committing $800M): $1,440M − $800M = $640M Conclusion: Keep the option open. Figure: 13-19 EXM

Step 3: What to Do in Year 1 At Issue: Is it worth investing $400M in design? Decision: At year 1, if you find yourself in node C, go ahead and invest $400M. If not, don’t invest and get out of the project. In that case, your loss is limited to $60M that were committed in year 0. Figure: 13-20EXM

Step 4: Standing at Year 0 At Issue: Is it worth spending $60M today? The value of having the compound options is worth $71M (or exactly $71.039M). Since it requires only $60M now, it is desirable to proceed for now. Figure: 13-21EXM