29 September 2006M.Sakuda NuFact06 Asian Regional Outlook (Japan) -by Y.Kuno (Osaka) (1) SuperBeam (T2K) (2) J-PARC current upgrade plan (3) T2HK or T2KK.

Slides:



Advertisements
Similar presentations
1 J-PARC and T2K 1.Accelerator construction status and commissioning 2.Accelerator upgrade plan in first 5 years 3.Experiments with slow extracted beam.
Advertisements

Masahito TOMIZAWA and Satoshi MIHARA Accelerator and proton beam.
HEP03 Advanced Neutrino Beams Rob Edgecock RAL. Candidates……. Conventional super beam Conventional super beam Neutrino Factory Neutrino Factory Beta beam.
Target & Capture for PRISM Koji Yoshimura On behalf of PRISM Target Group Institute of Particle and Nuclear Science High Energy Accelerator Research Organization.
Pion capture and transport system for PRISM M. Yoshida Osaka Univ. 2005/8/28 NuFACT06 at UCI.
CHIPP Sept 2005Jean-Sébastien GraulichSlide 1 What is MICE  Muon Ionisation Cooling Experiment  What is Ionisation Cooling ? Cooling = Reduction of Beam.
MUCOOL Collaboration Meeting February 2002 Steve Geer February 2002.
1 J-PARC Overview Shoji Nagamiya J-PARC Center High Energy Accelerator Research Organization (KEK) Japan Atomic Energy Agency (JAEA) October 15, 2008 ATHIC2008,
Development of Superconducting Magnets for Particle Accelerators and Detectors in High Energy Physics Takakazu Shintomi and Akira Yamamoto On behalf of.
ABSTRACT The International Design Study for the Neutrino Factory (IDS- NF) baseline design 1 involves a complex chain of accelerators including a single-pass.
J-PARC upgrade T. Nakadaira (KEK / J-PARC). Outline J-PARC overview & on-going program Motivation of future experiment in J-PARC Overview of future experiment.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices iteratively to determine trace.
201 MHz NC RF Cavity R&D for Muon Cooling Channels
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
Goals and Status of MICE The International Muon Ionization Cooling Experiment J.S. Graulich.
FFAG-Workshop 2006, Kumatori, Osaka, Japan Injection study for 6-sector PRISM FFAG by using pulsed alpha particles Yasushi Arimoto, Toshiyuki Oki, Makoto.
Fermilab, Proton Driver, Muon Beams, Recycler David Neuffer Fermilab NufACT05.
Target & Capture for PRISM Koji Yoshimura Institute of Particle and Nuclear Science High Energy Accelerator Research Organization (KEK)
Virtual Accelerator at J-PARC 3 GeV Rapid Cycling Synchrotron H. Harada*, K. Shigaki (Hiroshima University in Japan), H. Hotchi, F. Noda, H. Sako, H. Suzuki,
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
MICE : the Muon Ionization Cooling Experiment M. Yoshida (Osaka Univ.) for the MICE Collaboration Osaka - Overview and Status -
Q&A on T2K construction of beam line near detectors budget collaboration (contribution from each) T2KK.
ICHEP 2012 Melbourne, 7 July 2012 Paul Soler on behalf of the MICE Collaboration The MICE Beam Line Instrumentation (Trackers and PID) for precise Emittance.
KEK Plans for J-PARC Particle Physics at J-PARC CERN-KEK Committee March 29, 2010 at KEK Koichiro Nishikawa Institute for Particle and Nuclear Studies,
Advanced Accelerator Design/Development Proton Accelerator Research and Development at RAL Shinji Machida ASTeC/STFC/RAL 24 March 2011.
Front-End Design Overview Diktys Stratakis Brookhaven National Laboratory February 19, 2014 D. Stratakis | DOE Review of MAP (FNAL, February 19-20, 2014)1.
J. Pozimski UKNF WP1 meeting 10 March 2010 UKNF WP1 milestone table status.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
1 Design of Proton Driver for a Neutrino Factory W. T. Weng Brookhaven National Laboratory NuFact Workshop 2006 Irvine, CA, Aug/25, 2006.
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
Road Map of Future Neutrino Physics A personal view Ken Peach Round Table discussion at the 6 th NuFACT Workshop Osaka, Japan 26 th July – 1 st August.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
Muon Beams for Particle Physics Ajit Kurup Winter Seminar March 2010.
MCTF 8/17/06 A. Bross MTA Activities and Plans MCTF August 17, 2006 A. Bross.
MICE at STFC-RAL The International Muon Ionization Cooling Experiment -- Design, engineer and build a section of cooling channel capable of giving the.
MICE CM16 Goals Alain Blondel 8 October MICE CM 16 Collaboration meeting 8-11 October 2006 at RAL Goals of the meeting thanks to John Cobb & Marco.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
The ISS Peter Dornan Imperial College London. 16 March 2006P Dornan - MUTAC `atmospheric’`solar’ `cross/reactor’ Oscillation defined by 3 mixing.
John Womersley Welcome Director of Particle Physics, CCLRC International Scoping Study Meeting, RAL April 2006.
STATUS OF BNL SUPER NEUTRINO BEAM PRORAM W. T. Weng Brookhaven National Laboratory NBI2003, KEK November 7-11, 2003.
Proton Driver Keith Gollwitzer May 31, Initial Design Overview For design purposes, the following is assumed –H - beam comes from PIP II and follow-on.
G-2, EDM, COMET muon particle physics programmes at J-PARC Mu_01 Satoshi MIHARA IPNS, KEK FKPPL-FJPPL workshop, Yonesei Univ.
Alain Blondel -- After the ISS -- What did ISS achieve? 1. Established a « baseline » for the accelerator study 2. Rejuvenated simulation and study of.
Road Map of Neutrino Physics in Japan Largely my personal view Don’t take too seriously K. Nakamura KEK NuFact04 July 30, 2004.
IDS-NF Accelerator Baseline The Neutrino Factory [1, 2] based on the muon storage ring will be a precision tool to study the neutrino oscillations.It may.
J-PARC Accelerator and Beam Simulations Sep. 7th, SAD2006 Masahito Tomizawa J-PARC Main Ring G., KEK Outline of J-PARC Accelerator Characteristics of High.
COMET. μ-e conversion search from muonic aluminium J-PARC pulsed proton beam to produce pulsed muon beam Forbidden in the Standard Model  clue to the.
CHIPP Aug 2010J.S. GraulichSlide 1 MICE and the Neutrino Factory Jean-Sebastien Graulich, Geneva.
Summary of Nufact-03 Alain Blondel NuFact 03 5th International Workshop on Neutrino Factories & Superbeams Columbia University, New York 5-11 June 2003.
MICE RF review Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
1 Alan Bross AEC March 31, 2008 MuCool RF Program Muon Cooling R&D Alan Bross.
1 Status of the T2K long baseline neutrino oscillation experiment Atsuko K. Ichikawa (Kyoto univeristy) For the T2K Collaboration.
COMET μ-e conversion search at J-PARC. μ-e conversion physics SUSY-GUT, SUSY-seesaw (Gauge Mediated process) – BR = = BR(μ→eγ) × O(α) – τ→lγ SUSY-seesaw.
Water Cherenkov detector - brief status report - Kenji Kaneyuki Research Center for Cosmic Neutrinos, ICRR, Univ. of Tokyo.
ch/~bdl/lepc/lepc.ppt 1 MICE Status and Plans Rikard Sandström Université de Geneve International Scoping Study CERN,
Steering Group Meeting 10:30 – 12:30 am CDT Monday, July 23, 2007 Y2K.
COMET Task Force 16/Oct/2008 J-PARC PAC meeting Satoshi MIHARA.
Project X: Accelerators Sergei Nagaitsev September 2, 2011.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
中国缪介子衰变中基线中微子束流实验 MOMENT 袁野 2014 年 7 月 4 日 中国科学技术大学.
Presenter : Yang Wu McMaster University Work conducted at IHEP.
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Summary Vyacheslav Yakovlev Fermilab, USA.
Horn and Solenoid options in Neutrino Factory M. Yoshida, Osaka Univ. NuFact08, Valencia June 30th, A brief review of pion capture scheme in NuFact,
CARESG, 11Apr2006V. Palladino Report on BENE Activities Beams for European Neutrino Experiments (BENE) subtitle: A Network aiming at a consensual road.
J. Pasternak PRISM Synergies between muon projects J. Pasternak, Imperial College London/RAL STFC on behalf of the PRISM Task Force , PASI Workshop,
Irradiated T2K Ti alloy materials test plans
UK Neutrino Factory Conceptual Design
Outline: Why now ? What ? How ?
Completing the Step IV Programme
Accelerator R&D for Future Neutrino Projects
Presentation transcript:

29 September 2006M.Sakuda NuFact06 Asian Regional Outlook (Japan) -by Y.Kuno (Osaka) (1) SuperBeam (T2K) (2) J-PARC current upgrade plan (3) T2HK or T2KK (4) FFAG muon acceleration for neutrino factory R&D/PRISM R&D for muon physics (5) Contribution to ISS and continue contribution to IDS (to be discussed tomorrow)

29 September 2006M.Sakuda NuFact06 Construction Schedule Construction Start Facility Operation NOW Status 2

29 September 2006M.Sakuda NuFact06 Construction Schedule Status Mile Stones Start the Linac Beam Commissioning: Dec., 2006 Start the RCS Beam Commissioning: Sep., 2007 (start to transport the beam from the linac to the RCS) Start the MR Beam Commissioning: May, 2008 (start to transport the beam to MR and/or MLF) Start the Experiment sometime in JFY2008 3

29 September 2006M.Sakuda NuFact06 Beam Power Goal MR: 0.75 MW (50 GeV, 15  A), slow and fast extraction for nuclear and particle physics experiments RCS: 1 MW (3 GeV, <1  s, ~ 25 Hz) for spallation neutron source 4 Ring Final Goal (Phase II) Phase I Goal MR: 0.6 MW (40 GeV, 15  A) RCS: 1 MW (3 GeV, 333  A) Phase I 0 Goal MR: 0.36 MW (40 GeV, 9  A) RCS: 0.6 MW (3 GeV, 200  A) In order to increase the MR beam power beyond this level, various operational modes have been proposed, including the increase in the number of MR bunches, the increase in the MR repetition, and so forth. However, the accomplishment of the Phase I 0 Goal with the robust, reliable hardware is most important. Then, the attempts of various operational modes will be realistic, and efficient.

29 September 2006M.Sakuda NuFact06 T2KK JPARC Off-axis angle Distance from the target (km) K. Hagiwara Nucl. Phys. Proc. Suppl (2004) Kamioka L=295km OA2.5deg Korea L=1000~1250km OA 1.0~2.5deg Hyper-K sign(  m 2 ) CP violation T2KK ( Mt) T2K-II (0.54Mt) Ishitsuka et al. PRD 72 (2005) 2 33

29 September 2006M.Sakuda NuFact06 Conceptual design of upstream Carbon target 6T capture solenoid 2T bent solenoid Tracking by g4beamline Heat load by MARS The 1st PRISM-FFAG magnet PRISM-FFAG under construction 3 magnets have been build and field measurement is underway. 5MHz RF has been developed. PRISM/PRIME  -e conversion experiment sensitivity : BR  - /sec 68MeV/c +- 2% by phase rotation in a FFAG

29 September 2006M.Sakuda NuFact06 Progress in PRISM-FFAG magnet The first batch of PRISM-FFAG magnet has been delivered in May, Successful setup in KEK test area Field map of one of the magnets has been measured by 3D- scanning probes Finish the measurement for 3 of the magnets, and check the field quality in Sep., The second production batch will be delivered by March, Will study optics using alpha particles (2007)

29 September 2006M.Sakuda NuFact06 MICE SciFi Tracker Successfully tested tracker prototype in KEK test beam (2005) Improving quality control scheme for full tracker production Will prepare waveguides for full tracker Install full tracker in RAL, and start commissioning in Oct Liquid Hydrogen Absorber Convection-type absorber cooled by He flow has been successfully filled with LH2 in MTA at FNAL (2005) Further test is scheduled in collaboration with MUCOOL KEK absorber II KEK pi2 beam line Tracker prototype inside 1T solenoid

29 September 2006M.Sakuda NuFact06

29 September 2006M.Sakuda NuFact06

29 September 2006M.Sakuda NuFact06

29 September 2006M.Sakuda NuFact06