Solving Cleanup Challenges Through Risk Reduction EM/RW Quality Assurance Activities Office of Standards and Quality Assurance (EM-64) April 15, 2009.

Slides:



Advertisements
Similar presentations
Update on NRC Low-Level Waste Program – Major Activities Large Scale blending of LLRW -Issued guidance to agreement states for reviewing proposals for.
Advertisements

Office of River Protection 2013 Hanford ORP Site Status Report
Quality Assurance Update Presented byRay Hardwick Presented by: Ray Hardwick.
Department of Energy Quality Assurance Updates Frank Russo Deputy Assistant Secretary Office of Corporate Performance Assessment Energy & Environmental.
IQA Implementation As-Is Status May, 2009 Jed Heyes.
Department of Environmental Quality Environmental Management System Overview.
Idaho Cleanup Project _____________________ ICP Spent Nuclear Fuel Examination Barbara Beller for Kathleen Hain, PBS-12 FPD April 15, NSNFP Strategy Meeting.
1 Guidance for the American Recovery and Reinvestment Act of 2009 By David G. Bullock, Partner Macias Gini & O’Connell LLP.
Identify source area and COCs Determine nature and extent of discharge Evaluate potential risks to public health and the environment Develop Investigation.
FY 2012 SIG 1003G LEAD PARTNER REQUEST FOR SEALED PROPOSAL (RFSP) BIDDERS’ CONFERENCE February 7, 2011.
Port St. Lucie City of Crosstown Parkway Extension Project Development and Environment (PD&E) Study & Environmental Impact Statement (EIS) Substantial.
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement Dave Paveglio, Contract Administrator NSLS-II PAC Meeting May 25, 2007.
Information Governance and the Presidential Memo on Managing Government Records: Converging Issues and the Search for New Ideas Presidential Memorandum:
Safety  performance  cleanup  closure M E Environmental Management National Spent Nuclear Fuel Program Role in DOE’s Transformation Barb Beller, Project.
National Spent Nuclear Fuel Program Meeting April 14, 2009 Stephen O’Connor, Director Office of Packaging and Transportation.
0-1 Team # Status Report (1 of 4) Client Contact –Point 1 –Point 2 Team Meetings –Point 1 –Point 2 Team Organization –Point 1 –Point 2 Team #: Team Name.
0-1 Team # Status Report (1 of 4) Client Contact –Status Point 1 –Status Point 2 Team Meetings –Status Point 1 –Status Point 2 Team Organization –Description.
Defense Waste Processing Facility 257 Actual Canisters Produced in FY05 37% Waste Loading (averaged for FY05) 1,995 Total Canisters Produced (as of the10/31/05.
Office of River Protection 2014 Hanford ORP Site Status Report Glen Clark, WRPS 2014 ASP Workshop September, 2014 Albuquerque, NM Glen Clark, WRPS.
Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation,
Software Compliance: Are we there yet? Looking back and moving forward.
The Crown and Suppliers: A New Way of Working People & Security15:35 – 16:20 Channels & Citizen Engagement Social Media ICT Capability Risk Management.
The Status of Quality Assurance Presented by Sandra Waisley, Director Office of Standards and Quality.
Software Quality Assurance Implementation Plan June 15, 2004 Defense Nuclear Facilities Safety Board Chip Lagdon Director Office of Quality Assurance Programs.
Jhon Carilli Low-Level Radioactive Waste (LLW) Activity Lead
FY2010 PEMP Notable Outcomes October 15, FRA, LLC Board of Directors 10/15-16/2009 Office of Quality and Best Practices Performance Evaluation Management.
INTEGRATION OF QA/ISM J. R. Yanek Chair, EFCOG ISM Working Group April 13, 2000.
MusalaSoft Quality Process Overview Damyan Kasapov, QA Engineer Tsvetelina Kovacheva, QA Engineer March 15, 2005.
Systems Update February, ICD10 AHCCCS ICD10 Project Milestones –Complete Requirements and Design – Reference; December 2012 –Begin Coding – Reference;
1 Working Group on Archives and Records Management WGARM.
1 DOE IMPLEMENTATION WORKSHOP ASSESSING MY EMS Steven R. Woodbury
Soft Tech Development Inc. 1 Software Project Tracking A CMM Level 2 Key Process Area Soft Tech Development Inc.
FAFSA Collective Impact Initiative Professional Learning Community January 13, 2015.
UN/CS/RAI/USAA/DB01/ Development of a Strategic Plan for a Digital Archives Programme Common Services Working Group on Archives and Records.
PA Department of Environmental Protection Continuous Source Monitoring Manual (Manual, Revision 8)
US Department of Energy (DOE) of the Quality Assurance Program of the XXX Program at the ZZZ Site Bob Blyth DOE-NE July xx, 200x DOE-NE Audit.
Quality Strategy June 10, 2009 Presented by: Debby McNamara, LCSW, PMP Quality Coordinator, AHCA.
1 Resuming Operations at WIPP Frank Marcinowski Acting Associate Principal Deputy Assistant Secretary for The Office of Environmental.
11 Presented by: Kevin Smith, Manager September 29, 2015 ORP’s Path to Reinvigorating Technology Development DOE National Cleanup Workshop EM Technology.
SNF/HLW Repository Acceptance Presented by Steve Gomberg Office of Systems Analysis and Strategy Development Office of Civilian Radioactive Waste Management.
INTERNAL AUDIT AND INVESTIGATION SERVICES PRESENTATION TO THE PORTFOLIO COMMITTEE ON THE UNIT’S ACTIVITIES FOR THE YEAR ENDING 31 MARCH 2006 Z MXUNYELWA,
DOE Integrated Safety Management (ISM) Conference Knoxville, TN August 24-27, 2009 Colette Broussard, DOE-HQ Office of Quality Assurance Policy.
NSNFP Technical Exchange Meeting Bethesda, MD April 14, 2005 Savannah River Site Spent Fuel Program Status.
Configuration Management of Post-Fukushima Regulations CMBG June 2013 David Gambrell Director, Severe Accident Management Southern Nuclear.
Integrating EM QA Performance Metrics with Performance Analysis Processes August 26, 2009 Robert Hinds, Manager, Quality Assurance Engineering & Greg Peterson,
November 8, 2005 Philip Wheatley NSNFP Fiscal Year 2006 Workscope.
Implementation Status Presented to: Berkeley Site Office Implementer : Minh Huebner January 4, 2007 Office of Management and Budget Circular A-123 (Appendix.
ISM WORKSHOP April 24-27, 2006 Albuquerque, NM Feedback and Improvement Assessment Results and Path Forward Michael N. Worley Office of Nuclear Energy.
Defense Nuclear Facilities Safety Board September 26, 2005 Frank Russo Office of Corporate Performance Assessment Robert Loesch Office of Quality Assurance.
Quality Assurance Update for the EFCOG ISM & QA Working Group 2011 Spring Meeting Sonya Barnette Office of Quality Assurance Policy and Assistance Office.
DOE EM RAI and Contention Support NSNFP Strategy Meeting Washington, DC Henry Loo April 2009.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
1 IMPLEMENTING DOE ORDER ENVIRONMENTAL MANAGEMENT SYSTEMS U.S. Department of Energy Richland Operations Office.
 closure E M Environmental Management  cleanup  performance safety STRATEGY MEETING NATIONAL SPENT NUCLEAR FUEL PROGRAM Bringing Innovation to Spent.
Mitigation & Education (MES) Subcommittee Update Chris Jonientz-Trisler, FEMA Co-Chair.
0 Software Quality Assurance Implementation Plan Briefing to the Board June 20, 2003.
April 13, 2005 Philip Wheatley Incorporation of HLW Activities Within the NSNFP.
DOECAP Laboratories Phased Audits U.S. Department of Defense 2016 Environmental Monitoring and Data Quality Workshop St. Louis, Missouri April 12-14, 2016.
Quality Assurance Briefing Defense Nuclear Facilities Safety Board June 1, 2005 Frank Russo Office of Corporate Performance Assessment Robert Loesch Office.
Performance Accountability Review Risk-Based Management Kathryn Hornsby Technical College System of Georgia NACTEI May 14, 2009.
SUPERINTENDENT’S RECOMMENDATIONS – Community Forum Capacity Utilization Arlington Public Schools December 9, 2009.
American Recovery & Reinvestment Act Office of Environmental Management Presentation to Regulators March 6, 2009 Cynthia V. Anderson, EM Recovery Act Program.
DOECAP Laboratories Phased Audits U. S
U.S. Department of Energy 2016 ASP Workshop
2nd QUARTER ANALYSIS REPORT FOR THE 2017/18 FINANCIAL YEAR
Enterprise Content Management Owners Representative Contract Approval
Path Forward for FY 2017 Laboratory Audits
February 2007 Note: Source:.
2015 January February March April May June July August September
Citizens Advisory Committee EPA/CBP Program Update Jim Edward Deputy Director Chesapeake Bay Program Office February 20-21,2019 Williamsburg, VA.
Presentation transcript:

Solving Cleanup Challenges Through Risk Reduction EM/RW Quality Assurance Activities Office of Standards and Quality Assurance (EM-64) April 15, 2009

Solving Cleanup Challenges Through Risk Reduction 2 Discussion Topics EM/RW Quality Assurance Program Audits (2008, 2009, and the Future) QARD Implementation at EM Sites

Solving Cleanup Challenges Through Risk Reduction 3 FY2008 EM/RW Audit Activities Four audits conducted in FY2008 –NSNFP, SRS DWPF HLW, ID SNF, RL SNF –No significant programmatic issues identified –Ongoing issue in meeting records storage requirements Qualification of ORP/BNI Programs –Phase I (Surveillances of QA Program, Technical Activities, and Software QA) –No significant programmatic issues identified –Phase II of BNI Program (Document Review/Flowdown of Requirements) - ongoing

Solving Cleanup Challenges Through Risk Reduction 4 FY2009 EM/RW Audit Activities Six audits scheduled/completed –NSNFP (March Completed) –SRS DWPF HLW (April 27-30, 2009) –BNI HLW (Contractor) Phase III Audit (June 2009) –ID SNF (July 2009) –RL SNF (September 2009) –ORP HLW (Federal) Phase II Document Review and Phase III Audit (TBD)

Solving Cleanup Challenges Through Risk Reduction 5 Future EM/RW Audit Activities EM to Maintain Status Quo through FY09 EM/RW Discussion on Path Forward - Maintain Level of Rigor to Maximize Flexibility

Solving Cleanup Challenges Through Risk Reduction 6 QARD Applicability and Implementation EM-60 March 2008 Memorandum (Impact Analysis and Direction) – EM Commitment to Implement QARD Revision 20 QARD Revision 21 per OQA Response and Commitment to NRC RAIs - OQA conducted QARD Revision 21 Impact Analysis to EM activities (determined no impact)

Solving Cleanup Challenges Through Risk Reduction 7 Questions??