EUROnu WP5 Detector Costing EuroNu Annual General Meeting, Strasbourg 3 June 2010 Paul Soler.

Slides:



Advertisements
Similar presentations
TASD R&D IDS-NF Mumbai. 2 Alan Bross IDS Plenary Meeting – Mumbai October 12-14, 2009 Detector R&D There are 3 components to this detector and their respective.
Advertisements

ISS-2 25 jan KEK Alain Blondel Physics of Future Neutrino Detectors PoF-NuDet detectors and beam instrumentation time scales and cost estimates.
ISS-4 22 August IRVINE Alain Blondel NEUtrino DETectors N-EU-DET 4-years working plan for Neutrino Detector R&D to take place in ~ objectives.
Segmented magnetised detectors Anselmo Cervera Villanueva Universidad de Valencia ISS meeting RAL (UK) 25/04/06 RAL (UK) 25/04/06.
How to Build a Neutrino Oscillations Detector - Why MINOS is like it is! Alfons Weber March 2005.
3/1/05 Status of the SHBD for the NUMI OPERA exposure D. Autiero IPN Lyon  Reminder about the proposed setup for the SHBD  Status of the sub-detectors.
Neutrino detectors for the future Neutrino Facility global numbers : next project ~ 600 M€ (NB NOvA, T2K = 200M$, OPERA=100MCHF, etc...) community between.
Neutrino Factory Detector R&D BENE Meeting 5 July 2006 Paul Soler University of Glasgow.
K.T. McDonald June 18, 2009 DUSEL FNAL 1 Strategies for Liquid Argon Detectors at DUSEL Kirk T. McDonald Princeton University (June 18, 2009)
DoE Review June 26, 2000 A Magnetic Tracking Calorimeter for a Neutrino Factory - Ideas & Issues Jeff Nelson William & Mary Williamsburg, Virginia 1 st.
Main Questions for Neutrino Detector R&D EUDET Neutrino Group Meeting 4 December 2007 Paul Soler University of Glasgow.
Lens ALens B Avg. Angular Resolution Best Angular Resolution (deg) Worst Angular Resolution (deg) Image Surface Area (mm 2 )
Summary Near Detector at IDS Meeting in FNAL EuroNu Annual General Meeting, Strasbourg 3 June 2010 Paul Soler.
WP5: Detector Performance and Cost EuroNu Launch Meeting 5 February 2008 Coordinator: Paul Soler, University of Glasgow Deputy: Anselmo Cervera Villanueva,
NuMI Schematic View of the MINOS Scintillator System 8 m Scintillator Module WLS Fibers Optical Connector Clear Fiber Ribbon Cable (2-6 m) Multiplex Box.
Douglas Michael California Institute of Technology NuMI Off-Axis Workshop SLAC Jan. 24, 2003 Overview A few details Some cost and production information.
Cost of a Large Solid Scintillator Detector Jeff Nelson Fermilab.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
UK involvement in Neutrino Factory Detector R&D UK Neutrino Factory Meeting 3 May 2006 Paul Soler University of Glasgow.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
Anselmo Cervera Villanueva IFIC (Universidad de Valencia & CSIC) EURODET meeting 7 December 2007 Neutrino Networking activities.
Activities relevant to Neutrinos in the UK Alfons Weber Oxford/RAL Durham, 11-Mar-2011.
WP5: Detector Performance and Cost EuroNu Meeting CERN, 26 March 2009 Paul Soler Coordinator: Paul Soler, University of Glasgow Deputy: Anselmo Cervera.
Alain Blondel. AIDA-Neutrino meeting AIDA Neutrino detector studies 1. News from the neutrino scene 2. Beam requirements for AIDA 3. Discuss.
Neutrino Detector R&D UKNF Detector Meeting 25 April 2007 Paul Soler University of Glasgow.
A new underground laboratory at Frejus Jacques Bouchez CEA-SACLAY NNN05-Aussois April 7, 2005 Historical overview Latest developments Outlook.
O R&D programme to test detector concepts being developed for neutrino factory: wrong sign muon “Golden” signature R&D Programme MIND & TASD 15 m 100 m.
Structure Update Installation & Building Update Revisions Outlined Costs Revisited (since given to Gina) Jeff Nelson Fermilab.
Neutrino Detector R&D International Scoping Study UC Irvine 21 August 2006 Paul Soler University of Glasgow.
Neutrino detector IA request Lines of thought first meeting on 24 August 2007 on- the fly notes by AB present: Alain Blondel, André Rubbia, Anselmo Cervera,
Detector possibilities: scintillator based detectors EUCARD 1 st Annual Meeting, RAL, 13 April 2010 Paul Soler.
E. W. Grashorn and A. Habig, UMD, for the MINOS Collaboration The Detectors of The Main Injector Neutrino Oscillation Search (MINOS) Experiment The MINOS.
MINER A Main INjector ExpeRiment for v-A Active segmented scintillator detector: 5.87 tons Nuclear targets of C, Fe and Pb, Water, Helium.
1 Neutrino detector test beam requirements 0. Disclaimer 1. News from the neutrino scene 2. Beam requirements for AIDA and others.
SiD Muon Detector Progress. Overall concept 2 There are slots in the iron. We will insert modules of orthogonal strips of appropriate size into the slots.
1 Performance of a Magnetised Scintillating Detector for a Neutrino Factory Scoping Study Meeting U.C. Irvine Monday 21 st August 2006 M. Ellis & A. Bross.
10/20/2015 TASD and MIND prototype and tests at CERN SPSC Oct Tests of TASD and MIND prototypes at CERN.
NUMI Update on Steel, Coils, Fixtures, and Prototyping J.K. Nelson 12/98 MINOS Meeting.
Neutrino detector IA request Lines of thought first meeting on 24 August 2007 on- the fly notes by AB present: Alain Blondel, André Rubbia, Anselmo Cervera,
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
MIND Systematic Errors EuroNu Meeting, RAL 18 January 2010 Paul Soler.
Baby MIND, Large Area Trigger Counters E. Noah WA105 General Meeting 21 January 2015.
Detector: Status and Plans 6 th IDS-NF Meeting, RAL, 22 September 2010 Paul Soler.
A. Blondel WP 4.7 LAGUNA_LBNO LARG+ND meeting Near detector for CN2PY -- discussion What is needed? What does it take? Ideas…
Concepts Beyond the Neutrino Factory Baseline Design Detector R&D Alan Bross, Malcolm Ellis, Steve Geer, Olga Mena, Silvia Pascoli.
Near Detector Tasks EuroNu Meeting, CERN 26 March 2009 Paul Soler.
EUROnu Review: 14 th April 2011 EUROnu Introduction and Objectives Neutrino oscillations: much interest since 1 st paper in extension required to.
Detector R&D for Future Neutrino Oscillation Facilities (Solid Detectors) NUFACT08 Valencia, Spain 30 June 2008 Paul Soler.
Magnetized Iron Neutrino Detector MIND Technology & Engineering.
23/11/05BENE meeting at CERN1 (22-25 November 2005) L. Mosca (CEA-Saclay) The MEMPHYS project MEgaton Mass PHYSics in a Large International Underground.
Final Results from IDS-NF Study NUFACT14 Workshop, Glasgow on behalf of the IDS-NF Collaboration Paul Soler, 26 August 2014.
Detector WG Summary 5 th Plenary meeting of the IDS-NF A. Bross.
Alan Bross 6th Plenary Meeting of the IDS-NF
Neutrino factory near detector simulation
EURONu Collaboration Board,
J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting
Detector Working Group: review of progress, issues to be addressed
Alain Blondel. LAGUNA meeting CERN 3-5 March 2011
Detector Baseline EuroNu Meeting, RAL 20 January 2010 Paul Soler.
nuSTORM at Fermilab D Adey
Alain Blondel 11 October 2010 GDR NEU2012 summary
Baby MIND Status on T9 E. Noah 6th July 2017.
Alain Blondel. EUCARD meeting NEU April 2010
Neutrino Oscillation Physics with a Neutrino Factory
Chris Smith California Institute of Technology EPS Conference 2003
General Introduction to IFR
Presentation transcript:

EUROnu WP5 Detector Costing EuroNu Annual General Meeting, Strasbourg 3 June 2010 Paul Soler

2 EuroNu AGM Strasbourg, 2 June 2010 Introduction o The aim of this talk is to introduce a Work Breakdown Structure and then the fractional cost for each item o The aim is not to give absolute costs but (to the best of our current knowledge) derive some relative costs to define cost drivers for the detectors. o Most of the time I will stay at the 1 st or 2 nd level of the WBS o The WBS is based on previous experience: MINOS, NOVA and MEMPHYS o In some cases I scaled up from previous experience, in other cases I looked up commercial value of components and multiplied by number of expected items or size of work. o I will cover: 100 kton MIND, 24 kton TASD, 600 kton Water Cherenkov (fiducial 440 kton) and Near Netector.

3 EuroNu AGM Strasbourg, 2 June 2010 Magnetised Iron Neutrino Detector (MIND) o Baseline for Neutrino Factory: iron (3 cm) + scintillators (2cm) beam 15 m B=1 T 90 m100KT o Main cost drivers: Steel Scintillator Wavelength Shifting fibres Photon detectors Infrastructure (if need to dig cavern)

4 EuroNu AGM Strasbourg, 2 June 2010 Magnetised Iron Neutrino Detector (MIND) o However, more realistic shape for toroidal field: iron (3 cm) + scintillators (2cm) beam 15 m B>1 T 120 m107KT o In MINOS: factor of 2 iron wastage o Can reduce wastage to nearly zero through simple shapes Is this feasible structurally? o However, machining cost is also factor 2 (in MINOS this was paid through iron wastage) o Assume factor x2 additional cost of iron from MINOS to MIND 15 m

5 EuroNu AGM Strasbourg, 2 June 2010 Magnetised Iron Neutrino Detector (MIND) Bob Wands, FNAL: 0.6T-2.2T with 92 kA-turn Add toroidal field: Idea by A. Bross (FNAL) With Superconducting Transmission Line (STL) could achieve 100 kA-turn with one turn! – only needs 10 cm hole $500/m 100 kA-turn

6 EuroNu AGM Strasbourg, 2 June 2010 Magnetised Iron Neutrino Detector (MIND) o Extruded scintillator: earlier costs were roughly –50% materials, 50% processing o Current materials cost for a large detector (20 kT): –~ $3 / kg for polystyrene, dopants, reflective coating o A total of $6 / kg seems possible o Silicon Photomultipliers (SiPM) now widely available commercially o T2K uses them in most sub-detectors o Coming down in cost: assume ~ €10/channel and ~ €5/channel electronics SiPM (MPPC) from Hamamatsu

7 EuroNu AGM Strasbourg, 2 June 2010 MIND WBS NumItem Cost MIND (k$)% 3Electronics and DAQ Front ends Hubs and interface crate Central system and trigger farm Data acquisition Database Auxiliary systems Electronics management0.1 4Installation Infrastructure Materials receiving and handling Detector assembly Alignment and survey0.1 5Project management Salary support Travel support0.1 Total100 NumItemCost (k$)% 1 Magnets: steel and coils Steel plane fabrication Steel handling fixtures Support structures Magnet coil Detector plane prototypes Steel management0.6 2 Scintillator detector fabrication Scintillator strips Fibre Scintillator modules Photodetectors Multiplex boxes and connectors Calibration systems Assay and test equipment Factories Scintillator management0.5

8 EuroNu AGM Strasbourg, 2 June 2010 Totally Active Scintillating Detectors (TASD) 15 m 150 m o Totally Active Scintillating Detector is useful to lower threshold o Magnetisation volume with Superconducting Transmission Line 35.4 KT o With these dimensions: 3 cm 1.5 cm 15 m

9 EuroNu AGM Strasbourg, 2 June 2010 TASD WBS NumItemCost (k€)% 1 Magnets: electronic cavern Magnet STL cable Scintillator detector fabrication Scintillator strips Fibre Photodetectors Multiplex boxes and connectors Detector plane prototypes Calibration systems Assay and test equipment Factories Scintillator management1.9 3Electronics and DAQ Front ends Hubs and interface crates Central system and trigger farm Data acquisition Database Auxiliary systems Electronics management0.0 4Installation Infrastructure Materials receiving and handling Detector assembly Alignment and survey0.1 5Project management Salary support Travel support0.1 Total100.0

10 EuroNu AGM Strasbourg, 2 June 2010 Water Cherenkov o Water Cherenkov (ie. MEMPHYS at Frejus) is the baseline detector for a Super-Beam or Beta Beam facility in the context of EUROnu. Fréjus CERN 130km Memphys ~440 kton o Initially there are only three caverns 65 m diam., 60 m height. o Main cost drivers: Excavation Photon detectors 65m 60m Water Cerenkov modules at Fréjus

11 EuroNu AGM Strasbourg, 2 June 2010 NumItemCost (k$)% 1 Photomultiplier tubes Photomultiplier tubes PMT Housing PMT support Cables Calibration systems Assay and test equipment0.4 2 Electronics and DAQ Front ends High Voltage Online computing Data acquisition Database Auxiliary systems Electronics management0.1 Water Cherenkov 3Civil Engineering Cavern excavation Water and services0.4 4Assembly Detector assembly Alignment and survey0.1 5 Project management Salary support Travel support0.1 Total100.0

12 EuroNu AGM Strasbourg, 2 June 2010 Near Detector o No near detector design yet, but …. o Near detector needs to have a leptonic TASD like detector with high granularity, a vertex detector for charm measurement and a MIND-like detector for flux extrapolation and muon momentum measurement o Assume these dimensions for costing beam 3 m B=1 T ~20 mMini-TASD 95 t Mini-MIND 460 t VertexDetector

13 EuroNu AGM Strasbourg, 2 June 2010 Near Detector NumItemCost (k€)% 1Mini-MIND Steel plane fabrication MIND Scintillator MIND Fibre MIND SIPM MIND Electronics MIND Coil Mind0.1 2Mini-TASD Scintillator TASD Fibre TASD SiPM TASD Electronics TASD Coil4.7 3Silicon vertex Silicon Silicon electronics5.2 4Computing Central system and trigger farm Data acquisition Database0.8 4Installation Infrastructure Materials receiving and handling Detector assembly Alignment and survey0.4 5Project management Salary support Travel support0.8 Total100.0

14 EuroNu AGM Strasbourg, 2 June 2010 Conclusions o An attempt has been made to guess costs and cost drivers for detectors. o So far, very big uncertainties and many things not included. o Rough breakdown of activities per detector are as follows:  100 kton MIND: Steel (39%), scintillator+fibre (20%), photon detectors (10%), electronics (8%), cavern (22%)  24 kton TASD: scintillator+fibre (41%), photon detectors (17%), electronics (11%), magnetic cavern (10%), cavern+installation (16%)  600 kton Water Cherenkov: photomultipliers (48%), cavern (50%)  Near detector (550 t): Mini-MIND (11%), Mini-TASD (41%), Si vertex (31%)