Overview of the experiment Collaboration (about 30 physicists at this meeting) Budget Realistic schedule and general status (few words) of each sub-detector.

Slides:



Advertisements
Similar presentations
1 A.Baldini 23 sett CSN I Lecce Stato dellesperimento MEG Stato dellesperimento (LXe, T.C., Trigger a parte) Schedule Budget MoU Richieste finanziarie.
Advertisements

MEG 1  e  search at PSI: SUGRA indications SUSY SU(5) predictions BR (  e  )   SUSY SO(10) predictions BR SO(10)  100 BR SU(5) R.
Status of the MEG Experiment W. Ootani ICEPP, University of Tokyo for the MEG collaboration.
Satoshi Mihara for the   e  collaboration, BV33 at PSI, Jan 2002 Report on the Progress for   e  Experiment Satoshi Mihara ICEPP, Univ. of Tokyo.
COBRA Magnet Test Milestone AssemblyDesignManufactoring DesignAss.TestWinding & Cryo. Deliv. PSI Test Platform Calibration Mapping device.
LEPTON-FLAVOUR VIOLATION AND NEUTRINO OSCILLATIONS
P.-R. KettleMEG-Review February MEG Beam Line Studies  E5 Z-Branch NOW !!! NOW !!!
P.-R. KettleMEG Review July MEG Beam Line Studies.
KEK Beam Test Koji YOSHIMURA KEK MICE Collaboration Meeting Koji YOSHIMURA KEK MICE Collaboration Meeting
A. Baldini PSI July 04 General Introduction Work done in the past 4 months presented in the individual sub-detectors talks: highlights Construction is.
INFN of Genova, Pavia and Roma Flavio Gatti, PSI, February 9 th, Timing Counter status Timing Counter status.
MICE: The International Muon Ionization Cooling Experiment Diagnostic Systems Tracker Cherenkov Detector Time of Flight Counters Calorimeter Terry Hart.
Shuei YAMADA, ICEPP, University of tau04 Nara, Sep. 15, Search for the Lepton Flavor Violating Decay  e  in the MEG Experiment Shuei YAMADA.
Genova/Pavia/Roma Flavio Gatti, PSI, July 1st, Timing Counter july 2004.
MEG 1  e  search at PSI: SUGRA indications SUSY SU(5) predictions BR (  e  )   SUSY SO(10) predictions BR SO(10)  100 BR SU(5) R.
Report from the Lecce’s Offline Group Rome 6-Feb-2006 The Achievements The People Future Plans.
Wataru Ootani, ICEPP, Univ. of Tokyo SORMA X, May 21, 2002 Development of liquid xenon scintillation detector for new experiment to search for   e 
COBRA Magnet Test Milestone AssemblyDesignManufactoring DesignAss.TestWinding & Cryo. Deliv. PSI Test Platform Calibration Mapping device.
A. Baldini PSI 18 July 2007 MEG Overview Cobra (W. Ootani) LXe calorimeter (S. Mihara) Calibrations (G. Signorelli) Drift Chambers (J. Egger) Timing counter.
Malte HildebrandtMEG Review Meeting, 14th February 2007 Report of Run Coordinator Run 2006 Summary Malte Hildebrandt MEG Review Meeting, 14th February.
19 July 2005Fabrizio Cei1 Status and Perspectives of MEG software Fabrizio Cei INFN & University of Pisa On behalf of the MC/Offline group MEG Review Meeting.
Drift Chambers and Pattern recognisation  Fabrizio CeiPattern recognition ideas INFN & Pisa University  Hajime NishiguchiKapton foils for DC cathode.
Mar Toshiyuki Iwamoto (ICEPP) JPS 2010 Spring meeting, Okayama University1 MEG 実験による   e  探索 Run2009 東京大学素粒子物理国際研究センター 岩本敏幸 他 MEG コラボレーション.
Satoshi Mihara ICEPP, Univ. of Tokyo Feb MEG Review Meeting 1 CEX beam test at piE1 Satoshi Mihara.
Liquid Xenon Photon Detector Feb MEG Review Meeting Liquid Xenon Detector Part I CEX beam test at piE1 Oct-Dec/03 –Hardware operation status –Analysis.
2 1/March/2015 日本物理学会大70回年次大会@早稲田大学 東大ICEPP 内山雄祐 他 MEG II collaboration.
MEG positron spectrometer Oleg Kiselev, PSI on behalf of MEG collaboration.
Timing Counter Report of Feb. 14 th, 2007 P.W. Cattaneo.
14 February 2007Fabrizio Cei1 INFN and University of Pisa PSI Review Meeting PSI, 14 February 2007 Status of MEG Software.
M. Grassi – INFN Pisa La Thuile - March 15 th, A sensitive search fordecay: the MEG experiment Marco Grassi INFN, Pisa on behalf of the MEG Collaboration.
MEG DC (report June 04) DC report june_04,J.E. a)Foil stability and quench related problems b)How to get more stability c)Frame design d)Measurement of.
Status of the MEG Experiment  → e  On behalf of the MEG collaboration Stefan Ritt Paul Scherrer Institute, Switzerland.
2007/9/13N. Ishihara, TAUP2007, Sendai1 DCBA DCBA experiment for searching for Neutrinoless Double Beta Decay Nobuhiro Ishihara (KEK, Tsukuba) TAUP2007.
PSI - February 3, 20031F. Sergiampietri MEG – PMT cryogenic test: PURPOSES -SYSTEMATIC TEST OF THE PMT’s FOR MEG IN OPERATING CONDITIONS -BUILD AN EVOLUTIVE.
Satoshi Mihara ICEPP, Univ. of Tokyo Feb MEG Review Meeting 1 Liquid Phase Purification Satoshi Mihara.
1 Satoshi Mihara for the   e  collaboration, review meeting at PSI, Jul 2002 Photon Detector Satoshi Mihara ICEPP, Univ. of Tokyo 1.Large Prototype.
Dec. 8th, 2000NOON A new   e  experiment at PSI For the MUEGAMMA collaboration Stefan Ritt (Paul Scherrer Institute, Switzerland) Introduction.
PSI - 11 Feb The Trigger System of the MEG Experiment Marco Grassi INFN - Pisa On behalf of D. Nicolò F. Morsani S. Galeotti.
The MEG Experiment T. Mori for the MEG Collaboration.
20 September 2005Fabrizio Cei1 Status and Perspectives of MEG Software Fabrizio Cei INFN & University of Pisa INFN Scientific Committee I Napoli, 20 September.
SksMinus status Hyperball collaboration meeting 2009/3/11 K. Shirotori.
Current status of MEG Experiment Yasuko HISAMATSU ICEPP, The Univ. of Tokyo ICEPP Symposium.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
TIMING COUNTER: status report Giorgio CECCHET, PSI July 11th, 2003.
Xenon Detector Installation schedule Satoshi MIHARA.
Liquid Xe detector for m +  e + g search Kenji Ozone ( ICEPP, Univ. of Tokyo, Japan ) Introduction prototype R&D ー PMTs ー small & large type summary Outline.
Collaboration Meeting Feb. 9 th / 10 th 2004 How may go to Oase for dinner? Register ONLY at MEG web page, not at PSI guesthouse! Register early enough,
Xenon Delivery Japan 1 MCHF 575 kCHF granted Additional grant 656 kCHF Last 50l subject to negotiation.
R&D works on Liquid Xenon Photon Detector for μ  e γ experiment at PSI Satoshi Mihara ICEPP, Univ. of Tokyo Outline Introduction Prototype R&D works Summary.
P.-R. KettleMEG-Review July MEG Beam Line Studies  E5 Z-Branch Collaborative Effort !!! Effort !!!  E5 Z-Branch Collaborative Effort !!! Effort.
A. Baldini PSI July 05 Overview of the experiment MEG is being built (Beam line, Magnet, LXe, DC, TC, Elect., Software) Delays in some items: O(months)
9 Feb, MEG Software Status -for the coming review committee- Question from A.Blondel Our answer Schedule and Man power MEG Software Group.
1 PMT Univ. of Tokyo Yasuko HISAMATSU ICEPP, MEG Collaboration meeting Feb. 10th, 2004.
FARICH status E.A.Kravchenko Budker INP, Novosibirsk, Russia.
g beam test of the Liquid Xe calorimeter for the MEG experiment
MEG  e  search at PSI: SUGRA indications SUSY SU(5) predictions BR (  e  )   SUSY SO(10) predictions BR SO(10)  100 BR SU(5) R.
The MEG Experiment at PSI: a sensitive search for m eg decay
Technical Design for the Mu3e Detector
Timing Counter G.Cecchet INFN Pavia Genoa & Pavia F.Gatti,S.Dussoni
Liquid Xenon Detector for the MEG Experiment
New experiment to search for mge g at PSI status and prospects
Stato del calorimetro elettromagnetico
Upgrade of LXe gamma-ray detector in MEG experiment
Timing Counter Sept CSN I, Assisi 2004 Giorgio Cecchet.
Status of the experiment in Italy
Liquid Xenon Scintillation Detector for the MEG Experiment
The MEG Detector to Search for m -> eg Decays
MEG Summary T. Mori for MEG Collaboration February 9, 2005.
Decay Angular Measurement in the MEG Experiment
New Results from the MEG Experiment
Presentation transcript:

Overview of the experiment Collaboration (about 30 physicists at this meeting) Budget Realistic schedule and general status (few words) of each sub-detector (see individual presentations) A. Baldini 11 Jul 03

INFN & Pisa University A. Baldini, C. Bemporad, F.Cei, M.Grassi, F. Morsani, D. Nicolo’, R. Pazzi, F. Raffaelli, F. Sergiampietri, G. Signorelli ICEPP, University of Tokyo Y. Hisamatsu, T. Iwamoto, T. Mashimo, S. Mihara, T. Mori, H. Nishiguchi, W. Ootani, K. Ozone, T. Saeki, R. Sawada, S. Yamada, S. Yamashita KEK, Tsukuba T. Haruyama, A. Maki, Y. Makida, A. Yamamoto, K. Yoshimura Osaka University Y. Kuno Waseda University T. Doke, J. Kikuchi, S. Suzuki, K. Terasawa, A. Yamaguchi, T. Yoshimura Budker Institute, Novosibirsk L.M. Barkov, A.A. Grebenuk, D.G. Grigoriev, B, Khazin, N.M. Ryskulov PSI, Villigen J. Egger, P. Kettle, M. Hildebrandt, S. Ritt The collaboration INFN & Pavia University A.de Bari, P. Cattaneo, G. Cecchet, G. Nardo’, M. Rossella INFN & Genova University S. Dussoni, F. Gatti, D. Pergolesi, R. Valle INFN Roma I D. Zanello INFN & Lecce University S. Spagnolo, C. Chiri, P. Creti, M. Panareo, G. Palama’

Budget (K€) Approved in april Approved in may

Magnet: Construction finished! Construction was finished! Construction was finished! Excitation test has started on June 21th. Excitation test has started on June 21th. Compensation coils Superconducting coil in cryostat Potentiometer Support frame

Jan 2002: Jan 2003: Test Milestone AssemblyDesignManufactoring DesignAss.TestWinding & Cryo. Deliv. PSI Test Field Measurement Platform COBRA Magnet schedule

Platform design status (June 24 th ) beam

Measurements: Phase B – post Triplet 2 & Collimator Phase B – post Triplet 2 & Collimator Phase C – post Solenoid Phase C – post Solenoid Several unexpected problems encountered & Solved !!! Measurements: Phase B – post Triplet 2 & Collimator Phase B – post Triplet 2 & Collimator Phase C – post Solenoid Phase C – post Solenoid Several unexpected problems encountered & Solved !!! “Z-Branch” Measurements April/May2003

Jan Jan 2003: Test Milestone AssemblyDesignManufactoring Studies Solenoid Quadrupoles Target Beam

Photon detector Large prototype successfully operated with purified Xenon at TERAS:  E  2% LP already shipped to PSI: will be better tested by making use of monocromatic photons Need of a liquid hydrogen target Cryostat project is being examined by F. Raffaelli (Pisa) who will follow its construction PMT test facility under construction at Pisa Deficit in the budget for 350 PMTs

Photon Detector schedule Test Milestone AssemblyDesignManufactoring Large PrototypeBeam Test Vessel DesignAssembly & Test PMT Delivery + Testing RefrigeratorManufactoringAssembly Liq. Purification AssemblyTest Manufactoring Engineering runs

Drift chambers Prototypes of cathodes supporting structure Print foils meeting the experimental requirements found Tests at  M1: drift time measurements and cathodes read- out First studies on pattern recognition

Test Milestone AssemblyDesignManufactoring Full Prototype Medium PrototypeCharge division & Cosmics FP Full Detector (18 DC) Jan 2002: Positron Tracker

Test Milestone AssemblyDesignManufactoring Design PMT EvaluationPMT Jan 2002: Timing Counter Tests of fine mesh PMTs (even in magnetic fields) and of counter prototypes (  M1) going on Good solution for transverse detector: scintillating fibers + APDs

Electronics Need of at least two prototypes (both for the trigger and the DRS) First trigger prototype to be tested in september Second DRS design is soon going to be designed

Full System Test Milestone AssemblyDesignManufactoring Prototype Board 2 nd Prototype Jan 2002 Trigger

Test Milestone AssemblyDesignManufactoring 2 nd Prototype Tests1 st Prototype Boards & ChipTest Jan 2002 DRS (DAQ)

Test Milestone AssemblyDesignManufactoring Platform Detector Integration Engineering Runs Jan 2002: Complete Detector Start of the experiment in 2006 All possible engineering runs in 2005

Sensitivity The rate is lowered in order to have ~ 0.5 background events for 1 signal event We confirm our (July 02) estimates of detectors resolutions and therefore our goal of improving the present limit by two orders of magnitudes