Southern Natural Gas Company 2014 Outage Review Meeting

Slides:



Advertisements
Similar presentations
Southern Natural Gas Company 2015 Outage Review Meeting Customer con call and Webex February 18,
Advertisements

Southern Natural Gas Company 2013 Outage Review Meeting Customer con call and Lync Online Meeting September 18,
Southern Natural Gas Company 2014 Outage Review Meeting Customer con call and Webex September 17,
Duke Energy Ohio Standby Rates Jim Ziolkowski, P.E., Rates Manager September 13,
Southern Natural Gas Company 2014 Outage Review Meeting Customer con call and Webex July 16,
D E P E N D A B L E N A T U R A L G A S Customer Webex July 25 th, 2013.
Florida Gas Transmission Mainline Hydrostatic Test From the intersection of Milam Dairy Road with NW 65 th Street to the intersection of Galloway Road.
Importance of Processing Plant Information Gas Processors Association 88 th Annual Convention March 8-11, 2009 Barbara Mariner-Volpe
2 Permian Basin Supply San Juan Basin Supply Washington Ranch Storage Waha Compressor Stations Gas Supplies Transport Flow Directions Pipelines Production.
Shelley A. Wright Wyoming Pipeline Authority January 27, 2004 Expansion Projects Update.
Southern Natural Gas Company 2013 Outage Review Meeting Customer con call and Webex July 17,
Natural Gas STAR Partner Experiences Duke Energy Gas Transmission By: David Felcman Transmission Technology Transfer Workshop September 22, 2004 Houston,
MARCH 31, 2014 Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
SPECIAL ORDER BY CONSENT EMC SOC WQ S SOC Attachment 1: Summary of Major Line Replacement Completed DescriptionTotal Linear Footage Meadow Greens.
G 200 L 200 ISO NEW ENGLAND T H E P E O P L E B E H I N D N E W E N G L A N D ’ S P O W E R. COLD SNAP Overview of Proposed Options for Winter 2004/2005.
Insert Photo Here And mark any obvious features in the photo that are discussed in the camera point description.
Florida Gas Transmission Mainline Hydrostatic Test From the intersection of Milam Dairy Road with NW 65 th Street to the intersection of Galloway Road.
Directions to Camera Point: From the parking lot, head south along the path until the three way intersection by the restrooms. Turn east and there will.
NOVEMBER 11, 2014 PUBLIC VERSION Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
AUGUST 19, 2014 PUBLIC VERSION Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014.
Southern Natural Gas Company 2014 Outage Review Meeting Customer con call and Webex June 18,
© 2008 ICF International. All rights reserved. New York Gas Market Overview Based on NYSERDA Case 1 (n0908) March 2009 Contacts: Kevin R. Petak (
Southern Natural Gas Company 2015 Outage Review Meeting Customer con call and Webex March 18,
Florida Gas Transmission Mainline Hydrostatic Test From the Palmetto Expressway Interchange with Okeechobee Road to the Intersection of Milam Dairy Road.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
®® QUESTAR GAS Transportation Balancing Susan Davis, Director, Account & Community Relations February 28, 2014 We develop, transport and deliver clean.
D E P E N D A B L E N A T U R A L G A S | NYSE:EP Customer Webex September 6, 2011.
Intermountain West Production -- Getting Gas to Market Jim Cleary El Paso Western Pipelines IPAA Mid-Year Meeting June 14, 2004.
Florida Gas Transmission Section #1 Hydrostatic Test 14-Inch Saint Petersburg Lateral Pipeline From Compressor Station 30 (Plant City West) to Main Line.
CALIFORNIA ENERGY COMMISSION Alaska Crude Oil Disruption Staff Update California Energy Commission Fuels and Transportation Division Gordon Schremp August.
El Paso Corporation Nominations and Scheduling Customer Advisory Group Update May 14, 2009 Colorado Interstate Gas Company Wyoming Interstate Company Cheyenne.
NPRR 365 Change in Resource Outage Approvals from 8 to 45 or 90 Days Woody Rickerson Director Grid Coordination
Michael Dirrane Director, Northeast Marketing NASUCA 2012 Annual Meeting November 13, 2012.
Southern Natural Gas Company 2015 Outage Review Meeting Customer con call and Webex September 16,
Southern Natural Gas Company 2015 Outage Review Meeting
Florida Gas Transmission Mainline Hydrostatic Test From the Golden Glades Interchange to the interchange of NW 122 nd Street with the Palmetto Expressway.
FERC Order No. 698 Procedures for Providing Hourly Consumption Data Spectra Energy Pipelines June 20, 2008.
Discussion of Alternatives. OPTION 9 CO 2 PLANT PROCESSING Description: Operate the existing Castle Valley CO 2 plant to process the Price area coal-seam.
Southern Natural Gas Company 2015 Outage Review Meeting Customer con call and Webex June 17,
Southern Natural Gas Company 2015 Outage Review Meeting Customer con call and Webex July 22,
Totem Gas Storage Project Wyoming Pipeline Authority March 23, 2004.
OPTION 9 CO 2 PLANT PROCESSING Description: Operate the existing Castle Valley CO 2 plant to process the Price area coal-seam gas. Plant can processes.
Drought Monitoring, Prediction and Response - A View From Georgia - David Emory Stooksbury, Ph.D. State Climatologist and Associate Professor Engineering.
Southern Natural Gas Company 2013 Outage Review Meeting Customer con call and Webex May 22,
Southern Natural Gas Company 2013 Outage Review Meeting Customer con call and Webex March 14,
Southern Natural Gas Company 2015 Outage Review Meeting Customer con call and Webex October 21,
OCTOBER 2, 2013 Maine 2013 Outage Coordination Redacted Copy.
Southern Natural Gas Company 2015 Outage Review Meeting Customer con call and Webex August 19,
Southern Natural Gas Company 2014 Outage Review Meeting Customer con call and Webex August 20,
Southern Natural Gas Company 2014 Outage Review Meeting Customer con call and Webex April 16,
LFUCG Group 1 Remedial Measures Plans September, 2011 Presentation to Lexington-Fayette Urban County Residents.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
Southern Natural Gas Company 2016 Outage Review Meeting Customer con call and Webex March 16,
City of Buda ElectroPurification Water Supply Evaluation Drew Hardin, PE Council Workshop - January 20, 2015.
Nominations PEA Meeting October Why ask for Nominations? In a common carriage system gas flows must be approved in advance to keep them within pipeline.
Summer 2000 – Present in California
June 5, 2017.
Southern Natural Gas Company 2015 Outage Review Meeting
TGP Outages Remainder of the Year (Sept. thru Dec.)
Florida Gas Transmission Mainline Hydrostatic Test
Florida Gas Transmission Mainline Hydrostatic Test
Southern Natural Gas Customer Working Group Meeting
Message Vortex: Communicating During Record Cold Weather
Florida Gas Transmission Mainline Hydrostatic Test
Florida Gas Transmission Mainline Hydrostatic Test
Southern Natural Gas Company 2018 Outage Review Meeting
Harbour Island Force Main Replacement
System Operational Update and Review December 4, 2018
Presentation transcript:

Southern Natural Gas Company 2014 Outage Review Meeting Customer con call and Webex March 19, 2014

Welcome

Agenda Review Unscheduled Outages Review of Upcoming Outages Contacts 4/26/2017 10:28 AM Agenda Review Unscheduled Outages Review of Upcoming Outages March/April & May North System South System South Louisiana Outages for the remainder of 2014 Contacts © 2007 Microsoft Corporation. All rights reserved. Microsoft, Windows, Windows Vista and other product names are or may be registered trademarks and/or trademarks in the U.S. and/or other countries. The information herein is for informational purposes only and represents the current view of Microsoft Corporation as of the date of this presentation. Because Microsoft must respond to changing market conditions, it should not be interpreted to be a commitment on the part of Microsoft, and Microsoft cannot guarantee the accuracy of any information provided after the date of this presentation. MICROSOFT MAKES NO WARRANTIES, EXPRESS, IMPLIED OR STATUTORY, AS TO THE INFORMATION IN THIS PRESENTATION.

4/26/2017 10:28 AM Disclaimers Anticipated Impacts are estimates. Actual nominations, market demand, weather and pipeline conditions, etc. will determine if, and through what level, restrictions become necessary. Unless otherwise stated, all scheduled dates represent gas days as defined in the Southern Natural Gas Pipeline tariff to mean a period of twenty-four consecutive hours, beginning and ending at 9:00 a.m. (Central Clock Time). Scheduled dates are subject to change. Projects may be added, altered, delayed or cancelled. SNG will provide notice of such additions or changes via SoNet Premier postings. Dates as posted on SoNet should be deemed correct in the event of conflicts between SoNet posted dates and dates within this presentation. © 2007 Microsoft Corporation. All rights reserved. Microsoft, Windows, Windows Vista and other product names are or may be registered trademarks and/or trademarks in the U.S. and/or other countries. The information herein is for informational purposes only and represents the current view of Microsoft Corporation as of the date of this presentation. Because Microsoft must respond to changing market conditions, it should not be interpreted to be a commitment on the part of Microsoft, and Microsoft cannot guarantee the accuracy of any information provided after the date of this presentation. MICROSOFT MAKES NO WARRANTIES, EXPRESS, IMPLIED OR STATUTORY, AS TO THE INFORMATION IN THIS PRESENTATION.

Color Key for Maps Green Yellow Red No Impact Anticipated Restrictions are possible With extended duration, restrictions could be necessary from time to time Meter(s) affected are noted with (M) Red Restrictions are probable

Southern Natural Gas Pipeline Chattanooga SC North System Muldon GA MS Aiken Elba Express Atlanta Bear Creek Thomaston Elba South System Enterprise Gwinville AL Albany LA Pearl River South Louisiana Franklinton White Castle FL Compressor Station Storage Field LNG

Southern Natural Gas Pipeline Unscheduled Outage Update Chattanooga SC Muldon GA MS 8” West Point Line outage. Aiken Elba Express Atlanta Bear Creek Auburn Thomaston Elba Enterprise Gwinville AL Albany LA Pearl River Auburn Station unit outage. Return to service still pending Franklinton White Castle FL Toca Compressor Station Storage Field LNG

SNG North System Maintenance Review March/April & May Muldon Spring Shut-in test 4/8/14 to 4/14/14 DIQ and DWQ allocated 36% Chattanooga 24” 2nd North Main line remediation-east & west of Tarrant 3-24-14 thru 5-30-14 Bear Creek unit maintenance one unit at a time 3-25-14 to 4-3-14 Huntsville Muldon unit maintenance Sometime in May AL Rome Bear Creek Spring Shut-in test 4/22/14 to 4/28/14 DIQ and DWQ allocated 64% Muldon Storage Tarrant Atlanta Bell Mills Pell City McConnells MS Reform DeArmanville Louisville Providence GA Pickens 14” Chattanooga Branch line Calhoun tap to Rome station Pig run-4/1/14 to 4/3/14 Onward Bear Creek Storage 24” 2nd North Mainline Hydro-test- east & west of Tarrant capacity reduced approximately 225 MMcf/d 3/31/14 to 6/7/14 AL Logansport Bienville Rankin LA 16” Logansport line Bienville station to Perryville regulator pig run 3/25/14 to 3/28/14. No customer impact Compressor Station Storage Field 16” Logansport Supply line Logansport station to Bienville station pig run May/June Receipt points could see higher than normal pressures Southern will be conducting other general maintenance during this period

SNG South System Maintenance Review March/April & May MS Hartwell Selma unit maintenance 5/5/14 thru 5/21/14 Aiken Atlanta Elba Express GA Ocmulgee Wrens Hallgate AL Thomaston unit maintenance In the month of April Ellerslie Auburn Thomaston Elba Gallion Selma Elmore Riceboro York Holy Trinity Enterprise Bay Springs Albany Auburn unit maintenance 5/5/14 thru 5/16/14 Gwinville Brookman Pavo Compressor Station Storage Field LNG Southern will be conducting other general maintenance during this period

SNG South Louisiana System Maintenance Review March/April & May Gwinville MS LA Pearl River Franklinton West Leg White Castle East Leg White Castle, Shadyside Unit Maintenance April and May West Leg Capacity impact up to 150 MMcf/d Shadyside Toca Compressor Station Storage Field Southern will be conducting other general maintenance during this period

SNG North System Maintenance Review remainder of 2014 Chattanooga Pipeline remediation 24” North Main 2nd Loop line September/October Muldon Fall Shut-in Test 10/7/14 thru 10/13/14 DIQ and DWQ allocated 36% Huntsville Pipeline relocation on 30” field storage line sometime this summer Stopple by-pass Rome Atlanta Muldon Storage Bell Mills Bear Creek Fall Shut-in Test 10/21/14 thru 10/27/14 DIQ and DWQ allocated 64% Tarrant Pell City McConnells MS Reform Providence DeArmanville Louisville GA Pickens Remediation on the 24” North Main Loop line 7/7/14 thru 8/10/14 Onward Bear Creek Storage AL Rankin Bienville Bear Creek unit maintenance 12/01/14 thru 01/31/15 Logansport LA Southern will be conducting other general maintenance during this period Compressor Station Storage Field

SNG South System Maintenance Review remainder of 2014 Ellerslie unit maintenance In October Pipeline replacement on the 30” South Main Loop line 9/15/14 thru 11/1/14 Capacity reduced up to 240 MMcf/d Hartwell AL Aiken Atlanta Pipeline replacement on the 24” South Main Loop line 8/4/14 thru 9/12/14 Capacity reduced up to 100 MMcf/d Elba Express GA Wrens Ocmulgee Hallgate MS Ellerslie Pipeline Remediation on South Main 2nd Loop line 6/16/14 thru 6/20/14 Selma Auburn Thomaston Elba Gallion Elmore Holy Trinity Riceboro York Enterprise Bay Springs Albany Auburn unit maintenance September /October Gwinville Brookman Hydro-test 6” Line -26 East Dougherty 7/28/14 thru 8/15/14 (M)Ashburn (960050) (M)Douglas (960170) (M)Fitzgerald (960190) (M)Ocilla (960280) (M)Sylvester (960340) (M)Tifton area (960378)   Pavo Compressor Station Storage Field LNG Southern will be conducting other general maintenance during this period

SNG South Louisiana System Maintenance Review remainder of 2014 Gwinville MS Pearl River LA Franklinton Southern will be conducting other general maintenance during this period West Leg White Castle East Leg Shadyside White Castle, Shadyside Unit Maintenance Mid September - mid October West Leg Capacity impact up to 150 MMcf/d Toca Compressor Station Storage Field

Gas Control Contacts Nancy Barton – Manager (713) – 420 – 6191 (office) (713) – 204 – 4815 (cell) nancy_barton@kindermorgan.com Adam Krustchinsky – Manager (713) – 420 – 3265 (office) (713) – 202-7035 (cell) Kalman (Kal) Dankovich – Outage Coordinator (713) – 420 – 7522 (office) (205) – 325 – 7305 (Gas Control) kalman_dankovich@kindermorgan.com Jimmy Reese – Lead Controller (713) – 420 – 7310 (office) jerry_peterson@kindermorgan.com Jerry Peterson – Operations Analyst (205) – 325 – 7345 (office) Paul Reed – Operations Analyst (205) – 325 – 7655 (office) paulr_reed@kindermorgan.com  

Questions?