Overview of a Plan for Simulating a Tracking Trigger (Fermilab) Overview of a Plan for Simulating a Tracking Trigger Harry Cheung (Fermilab)

Slides:



Advertisements
Similar presentations
ATLAS ATLAS PESA Meeting 25/04/02 B-Trigger Working Group Status Report This talk:
Advertisements

ATLAS ATLAS PESA Meeting 25/04/02 B-Trigger Working Group Work-plan This talk:
5 th ILD Workshop Orsay, 23 rd -25 th May 2011 D. Moya, J. Duarte, I. Vila, A. Ruiz - IFCA (CSIC-UC) F. Arteche, C. Esteban - ITA Strip FTD Readiness for.
Track Trigger Designs for Phase II Ulrich Heintz (Brown University) for U.H., M. Narain (Brown U) M. Johnson, R. Lipton (Fermilab) E. Hazen, S.X. Wu, (Boston.
1 ACES Workshop, March 2011 Mark Raymond, Imperial College. Two-in-one module PT logic already have a prototype readout chip for short strips in hand CBC.
O. Buchmueller, Imperial College, W. Smith, U. Wisconsin, October 15, 2012 Trigger Performance and Strategy Working Group Trigger Performance and Strategy.
Upgrading the CMS simulation and reconstruction David J Lange LLNL April CHEP 2015D. Lange.
C. Foudas, Imperial CMS Upgrades Workshop FNAL – Trigger Introduction Status of the CMS Trigger Upgrade Activities: –uTCA and Optical Link upgrades.
February 19th 2009AlbaNova Instrumentation Seminar1 Christian Bohm Instrumentation Physics, SU Upgrading the ATLAS detector Overview Motivation The current.
The SLHC and the Challenges of the CMS Upgrade William Ferguson First year seminar March 2 nd
CBM Collaboration Meeting 1 Simulation Status V. Friese.
1 HCAL Upgrade TP simulation studies Jane Nachtman (Iowa) – for the HCAL group Trigger Upgrade meeting April 28, 2010.
Simulation issue Y. Akiba. Main goals stated in LOI Measurement of charm and beauty using DCA in barrel –c  e + X –D  K , K , etc –b  e + X –B 
L1 Pixel Trigger: Is 20 us Latency Achievable? David Christian Fermilab April 29, 2015.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
Offline Coordinators  CMSSW_7_1_0 release: 17 June 2014  Usage:  Generation and Simulation samples for run 2 startup  Limited digitization and reconstruction.
CMS Upgrade Workshop, November 2008 H. W. K. Cheung (FNAL) 1 Simulation WG Summary There was no actual separate Simulation Working Group/sessions.
Workshop 24 Jun 11 AB Workshop on GEMs for CMS high  Last September’s workshop showed that MPGD technology is now mature. Stable operation of large area.
Level 3 Muon Software Paul Balm Muon Vertical Review May 22, 2000.
Muon trigger upgrades, missing since not aimed towards DOE funding PHENIX upgrades: view presented to DOE R&D $3.5M Construction $16.6M Au-Au p-p 200 Si-Si.
Some Thoughts about Hits, Geometry etc Rob Kutschke, Hans Wenzel Fermilab March 13, 2007.
Design and development of micro-strip stacked module prototypes for tracking at S-LHC Motivations Tracking detectors at future hadron colliders will operate.
Simulation of the 4 Layer Pixel Upgrade System (Fermilab) (For the Tracker Upgrade Simulations Group) Simulation of the 4 Layer Pixel Upgrade System Harry.
SiD R&D tasks for the LOI - Subsystem R&D tasks - Summary of SiD R&D - Prioritization of R&D tasks -> Document for DoE/NSF ~Feb 2009 (Mainly based on Marty’s.
CLICdp achievements in 2014 and goals for 2015 Lucie Linssen, CERN on behalf of the CLICdp collaboration CLIC workshop, January 30 th
1 Simulation Update S. Margetis. 2 Issues Since in August most people were gone the action items are the still the same as listed in Jim’s slide for the.
Lcsim software: status and future plans ECFA-LC DESY May 28, 2013 Norman Graf (for the sim/reco group)
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
RAL, Apr H.Weerts SiD Workshop Summary, Next Steps & Life beyond the LOI H.Weerts Argonne National Lab.
ATLAS Trigger Development
Peter Sharp CERN CMS Tracker Summary of the Tracking Trigger Working Group Peter Sharp 21 November 2008.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
Upgrade Software University and INFN Catania Upgrade Software Alessia Tricomi University and INFN Catania CMS Trigger Workshop CERN, 23 July 2009.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
Marcello Mannelli October 2011 Overview of CMS Tracking Trigger.
Software Tools for Layout Optimization (Fermilab) Software Tools for Layout Optimization Harry Cheung (Fermilab) For the Tracker Upgrade Simulations Working.
General Muon Meeting, 03-March-2014 Jay Hauser “Update on Phase 2 muon Technical Proposal”  Recent developments:  ME0 inserted into HGCAL as for other.
News and Miscellaneous UPO Jan Didier Contardo, Jeff Spalding 1 UPO Jan Workshop on Upgrade simulations in 2013 (Jan. 17/18) -ESP in.
CMS Upgrade Workshop - Fermilab Trigger Studies Using Stacked Pixel Layers Mark Pesaresi
07/24/07 Francisco Carrion OPTIMIZING THE TRACK DETECTOR Francisco Javier Carrión Ruiz Mentor: Hans Wenzel 07/08/09 SID CONCEPT FOR THE INTERNATIONAL LINEAR.
RD50 Workshop November 2007Marcello Mannelli CMS SLHC Upgrade.
Leonardo Rossi INFN Genova - UTOPIA #12 0 What we have learned from UTOPIA so far? Defined a set of gauge histos to compare layouts Exercised on barrel-part.
8/12/2010Dominik Dannheim, Lucie Linssen1 Conceptual layout drawings of the CLIC vertex detector and First engineering studies of a pixel access/insertion.
Joerg Dubert’s Questions as you all aware we currently do not yet know how the final mechanical design of the new Small Wheel will look like. Nevertheless,
Atlas Software May, 2000 K.Amako Status of Geant4 Physics Validation Atlas Software Week 10 May, Katsuya Amako (KEK)
Geoff HallLECC LHC detector upgrades Introductory comments on electronic issues Organisation of this short session.
CMS Trigger Upgrades Phase-I (1) Muon Trigger Upgrades: – CSCTF (CSC TrackFinder) – MPC (Muon Port Card) Calorimeter Trigger Upgrades: – HCAL TPG – Calorimeter.
Marcello Mannelli CERN ACES Workshop February 2009 CMS Tracking Trigger Strawmen.
INFO 638Lecture #91 Software Project Management Conclude Adaptive Project Framework INFO 638 Glenn Booker.
Introduction to FCC Software FCC Istanbul 11 March, 2016 Alice Robson (CERN/UNIGE) on behalf of / with thanks to the FCC software group.
AliRoot survey: Reconstruction P.Hristov 11/06/2013.
S. Dasu, University of Wisconsin February Calorimeter Trigger for Super LHC Electrons, Photons,  -jets, Jets, Missing E T Current Algorithms.
Current Status of the Tracking Trigger Software Andrew W. Rose.
Goals and requirements 1 st flexible geometry version Next geometry version development Conclusions and outlook A realistic and flexible VTX geometry in.
Pixel Phase 1 Physics/Simulations (Fermilab) for the Tracker Upgrade Simulations Group Pixel Phase 1 Physics/Simulations Harry Cheung (Fermilab) for the.
23/01/2009Andrew W. Rose1 SLHC Tracking Trigger Framework and Utilities Andrew Rose.
Pixel Phase 1 Upgrade Simulation: Technical Status and Plans (Fermilab) (For the Tracker Upgrade Simulations Group) Pixel Phase 1 Upgrade Simulation: Technical.
IOP HEPP Conference Upgrading the CMS Tracker for SLHC Mark Pesaresi Imperial College, London.
Tracker Upgrade Simulation Task List Harry Cheung (Fermilab), Alessia Tricomi (Catania)
Tracker Upgrade Simulations Software Harry Cheung (Fermilab)
Strawman A Status Report
Upgrade Tracker Simulation Studies
Status of Full Simulation for Muon Trigger at SLHC
Sub-Detector Assembly Area Summary of discussion at ALCW2015
Overview of CLAS12 Calibration
SVT Issues for the TDR What decisions must be taken before the TDR can be written? What is the mechanism for reaching those decisions How can missing information.
Overview and plans of the ITK Layout Task Force
Simulation Update S. Margetis.
7. EAFM cycle overview Essential EAFM Date • Place 1.
Presentation transcript:

Overview of a Plan for Simulating a Tracking Trigger (Fermilab) Overview of a Plan for Simulating a Tracking Trigger Harry Cheung (Fermilab)

CMS Upgrade Workshop, November 2008 H. W. K. Cheung (FNAL) 2 Geometry Layouts We have a number of strawman layouts Original and more realistic Strawman A Strawman B with superlayers of doublets Long barrel strawman Phase 1 strawman (pixel detector) Original Strawman A Strawman B

CMS Upgrade Workshop, November 2008 H. W. K. Cheung (FNAL) 3 Geometry Layouts Strawman Geometry was supposed to limit the phase space Already many geometry layout variations to simulate and study Layout will be much easier once we know what track triggering method we need and what the “trigger layer(s)” look like (Doublet? Cluster shape?) Worse for forward region, no track trigger idea yet? “Realistic” Strawman A Long Barrel Strawman

CMS Upgrade Workshop, November 2008 H. W. K. Cheung (FNAL) 4 Track Trigger Layers Top priority to see whether a (buildable) trigger doublet would work, how many are needed and what their parameters should be This can be studied in any of the strawman geometries Want to study both a single doublet and a “stack” of 2 doublets Mark Pesaresi is studying trigger doublet performance in Strawman B Studying p T thresholds for both a single doublet and pair of doublets See Mark’s talk from yesterday’s Tracker session (layout and simulation)

CMS Upgrade Workshop, November 2008 H. W. K. Cheung (FNAL) 5 Mark Pesaresi’s Doublet Study

CMS Upgrade Workshop, November 2008 H. W. K. Cheung (FNAL) 6 Mark Pesaresi’s Doublet Study

CMS Upgrade Workshop, November 2008 H. W. K. Cheung (FNAL) 7 Mark Pesaresi’s Doublet Study

CMS Upgrade Workshop, November 2008 H. W. K. Cheung (FNAL) 8 Mark Pesaresi’s Doublet Study

CMS Upgrade Workshop, November 2008 H. W. K. Cheung (FNAL) 9 Mark Pesaresi’s Doublet Study

CMS Upgrade Workshop, November 2008 H. W. K. Cheung (FNAL) 10 Mark Pesaresi’s Doublet Study

CMS Upgrade Workshop, November 2008 H. W. K. Cheung (FNAL) 11 Mark Pesaresi’s Doublet Study

CMS Upgrade Workshop, November 2008 H. W. K. Cheung (FNAL) 12 Mark Pesaresi’s Doublet Study

CMS Upgrade Workshop, November 2008 H. W. K. Cheung (FNAL) 13 Track Trigger Layers Top priority to see whether a (buildable) trigger doublet would work, how many are needed and what their parameters should be This can be studied in any of the strawman geometries Want to study both a single doublet and a “stack” of 2 doublets Mark Pesaresi is studying trigger doublet performance in Strawman B Studying p T thresholds for both a single doublet and pair of doublets Eric Brownson and Matthew Jones looking at the L1 single muon trigger rate with Fastsim, Will study effectiveness of Mark’s trigger doublet points and vectors How much does the performance of trigger doublets depend on Exact Structure of the doublets? Material of doublets and whole construction? Need a robust trigger… What are workable alternatives? Fabrizio Palla is studying track triggering using cluster shapes Must tackle the forward region for track triggering!

CMS Upgrade Workshop, November 2008 H. W. K. Cheung (FNAL) 14 Tracking System Layout Once we know what the triggering layers should look like we can start narrowing the tracking system layout variations to decide on a baseline layout Geometry layout tool will be very useful to quickly compare layouts: can compare many statistics (including surface, channels, occupancy, power, cost, bandwidth) Tracker Layout Task Force will have an important role to help us converge to a viable baseline layout geometry (e.g. define realistic ladder and module structures; realistic material budgets and cooling layout; possible channel counts; overall detector construction, etc.) What do we do about track triggering in forward region? Can we give guidelines regarding what is feasible? E.g. –Is there more possibility to take data off-detector than in the barrel? –Use same technology for correlating forward disks as stacks of doublets? –Can we consider a cone/”elliptical” forward detector? Setting up a new geometry layout in the simulation Once we have an idea of what the baseline layout looks like we can build the new layout relatively easily How much configurability? Make fastsim more realistic

CMS Upgrade Workshop, November 2008 H. W. K. Cheung (FNAL) 15 What Plan? No grand plan yet for plan of work beyond initial studies Alessia Tricomi, Harry Cheung (Tracker Upgrade Simulations WG), Dave Newbold (Trigger Upgrade - Simulations WG), Anders Ryd, John Jones (Trigger Upgrade - Track Trigger WG) have discussed working together on the initial steps to make progress Need to involve other WG: Sridhara Dasu, Jane Nachtman (Trigger Upgrade - Calorimeter Trigger WG), Tracker Upgrade - Muon Trigger (no-one yet) Did not manage to make it to other WG sessions in this workshop, will need to talk together Work with and guidance from Tracker Layout Task Force (headed by Duccio Abbaneo) Group has not yet met, will have important contribution to plan/schedule Work with other groups that might spring up, e.g. Cluster shape group led by Fabrizio Palla The next slides that contain plans are my opinion

CMS Upgrade Workshop, November 2008 H. W. K. Cheung (FNAL) 16 Working together The Tracker upgrade and Trigger upgrade simulations groups have worked together already to create the code to interface the simulated tracker information to the trigger code framework (to get TPG) Any plan should include how people in the various working groups, groups, or individuals can successfully work together E.g. Ecal electrons sensitive to trigger layer placement (larger radius?) Any plan should not discourage innovations (that may be discovered in areas outside the immediate plan) Plan should include common tools so we can compare Single set of SLHC software Before we work out the details people should be able to continue work E.g. Trigger upgrade group work with generator 4-vectors E.g. Tracker upgrade simulation group using private trigger primitive code to make progress (e.g. Mark Pesaresi’s studies)

CMS Upgrade Workshop, November 2008 H. W. K. Cheung (FNAL) 17 Scope of Initial Tasks Current simulation studies with limited manpower: simulation studies we expect to make progress in the next few months 1. Studies to see whether a (buildable) trigger doublet would work, how many are needed and what their parameters should be Mark Pesaresi’s doublet study is very encouraging Still work to be done, e.g. study efficiency in pileup conditions Need to work out realistic/buildable doublet structures Will look track doublet info for the L1 single muon trigger rate 2. Studies of a very long barrel detector of (mini-)strips Study Phase 2 forward region options and doublet at large radius? 3. Studies of a Phase 1 strawman (Roland’s options for pixel replacement/upgrade) Including a study of a 4th barrel pixel layer We need to define the Phase 1 Forward Pixel detector and possible forward detector (but that is external to simulation groups)

CMS Upgrade Workshop, November 2008 H. W. K. Cheung (FNAL) 18 Tasks after the initial work Of course these studies could be/are in parallel with more manpower Trigger using cluster shapes (studies already ongoing - Fabrizio Palla) Work out track trigger scheme in the forward region Now we are only looking at a very long barrel Will need input from the Tracking group to make a plan For doublet schemes Any vertex information for pair of doublets? Interest in standalone track vectors triggers? Moving to a newer CMSSW version and get the improvements with the latest version

CMS Upgrade Workshop, November 2008 H. W. K. Cheung (FNAL) 19 Tracking Layout in ~6 months Once we know what the triggering layers should look like we can start narrowing the tracking system layout variations to decide on a baseline layout Results from doublet study in L1 Muon trigger by March/April 2009 if possible Geometry layout tool will be very useful to quickly compare layouts: can compare many statistics (including surface, channels, occupancy, power, cost, bandwidth) Can we get the tool to output the geometry for use in the simulation in the timescale we want? Tracker Layout Task Force will have an important role to help us converge to a viable baseline layout geometry (e.g. define realistic ladder and module structures; realistic material budgets and cooling layout; possible channel counts; overall detector construction, etc.) What do we do about track triggering in forward region? Will need lots of input from different WGs (what is the forum?) Work on other needed tools: more realistic fastsim (pileup, etc.)

CMS Upgrade Workshop, November 2008 H. W. K. Cheung (FNAL) 20 Plans after 6 months? Make the baseline geometry! Do the needed simulation studies Trigger performance Tracking performance Work on making simulation more realistic Not only the tools, but also any hardware constraints Work on making the baseline layout more realistic Learn when we get real data and feedback into simulations

CMS Upgrade Workshop, November 2008 H. W. K. Cheung (FNAL) 21 Summary We have a short term focused plan On studying trigger doublet performance On the Phase 1 pixel layout There is a plan to get a baseline layout in mid-2009 If we take Peter Sharp’s proposal to use Marcello Mannelli’s layout we can start building the geometry (it is a variation of strawman B) Need exact documentation on the proposed geometry Can spend the time to converge on realistic structures/materials Need a forum, etc. for WGs to work together (just layout task force) Plan to use real data to feedback to simulations