RPS Bidders Workshop May 11, 2007 1 2007 RPS Bidders Workshop Guidance for Inputs to PPA May 11, 2007.

Slides:



Advertisements
Similar presentations
GEORGIA POWER’S SMALL POWER PRODUCERS FUNDAMENTALS
Advertisements

1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Confidential A PHI Company 1 NJ Off-Shore Wind – Recommended Compliance Structure Stakeholder Meeting January 13, 2009.
1 Power Sales from Solar Power Projects Lee M. Goodwin
ISTISNA’.
STANDARD BIDDING DOCUMENT PROCUREMENT OF GOODS (FOR VALUE UP TO NU.0.25 MILLION) Presentation by: Tshewang Gyeltshen.
Amendment 3/5 Workshop.
GPA Renewable Energy Resource for Guam Power Authority
Duke Energy Ohio Standby Rates Jim Ziolkowski, P.E., Rates Manager September 13,
Enhancing Interruptible Rates Through MISO Demand Response: WIEG Annual Meeting June 19, 2008 Presented by: Kavita Maini, Principal KM Energy Consulting,
Renewable Net Short.
TRANSACTION AND INDUSTRY REVIEW CONFERENCE NIGERIAN POWER SECTOR REFORM: AN OVERVIEW OF TCN AGREEMENTS.
PG&E’s General Market Virtual Net Metering Schedule NEMV
Contract Termination and Excusable Delay
Power Purchase Agreements Alex Sifford Ecos Consulting Portland, Oregon
Office of Traffic, Safety and Technology Module 6 Specifications and Special Provisions Traffic Control Plan Development Course.
PPAs AND CONTRACTS FOR LONG-TERM RENEWABLE ENERGY CREDITS North American Power Credit Organization September 2006 Meeting Presented by: William H. Holmes,
BIDDERS CONFERENCE July 21, SOLICITATION RENEWABLES PORTFOLIO STANDARD.
2009 RPS Solicitation Workshop 1 Highlights of PG&E’s Form of Power Purchase Agreement August 3, 2009.
1 Managing Renewables Integration Valerie Fong Utilities Director Power Association of Northern California September 17, 2013.
Renewable Energy Delivery, Scheduling, and Firming / Shaping
WSPP REC Training A Walk Through The REC Schedule WSPP Webinar August 24, 2011 Arnold Podgorsky WSPP Legal Counsel
California Energy Commission HEATHER RAITT Technical Director Renewable Energy Program Proposed Changes to RPS Guidelines April 17, 2006 Proposed Changes.
2009 Bidders Workshop Attachment D August 3, 2009.
National Power Corporation Small Power Utilities Group POWER SUPPLY AGREEMENT.
WSPP REC Training A Walk Through The REC Schedule WSPP Webinar August 24, 2011 Updated (corrected) Version 9/5/2011 Arnold Podgorsky WSPP Legal Counsel.
ERS Update for DSWG June 1, Agenda June – September 2012 Procurement XML Project Update Clearing Price discussion NPRR 451 Q & A.
July 9, 2010, AB 920 Workshop Pacific Gas and Electric Company.
RPS Bidders Workshop 1 Guidance for Inputs to 2008 RPS PPAs April 11, 2008 Disclaimer: Not to be considered or construed as legal advice or counsel; in.
2008 All Source Participants WorkshopJune 19, Participants Workshop All Source RFO June 19, 2008.
BIDDERS CONFERENCE March 17, SOLICITATION RENEWABLES PORTFOLIO STANDARD.
Colombian Firm Energy Market: Discussion and Simulation Peter Cramton (joint with Steven Stoft and Jeffrey West) 9 August 2006.
1 Bilateral Interconnection Agreement Model Presented to HAPUA Working Group 5 (ESI Services), Project 6 By Power Purchase Agreement Division Electricity.
Energy for the Future Belene Nuclear Power Plant Project Status.
RPA1 Standard Bidding Documents for the Supply and Installation of Information Systems General Conditions of Contract and Special Conditions of Contract.
UNEP Collaborating Centre on Energy and Environment Capacity Development for CDM - Egypt, Second Nationa Workshop - Phase II - Cairo, January 2004.
2008 Bidders Workshop Attachment D April 11, 2008.
April 2, 2008 CRR Team Update PCRRs CRR Team UpdateApril 2, 2008 Table of contents 1.What is a PCRR? 2.Which NOIEs are eligible for PCRRs? 3.What.
Chicago Advanced Energy Demand Response & CSP Evolution Kellen Bollettino Comverge Inc. 10/23/14.
Power Purchase Agreement from a Utility Perspective Marilynn Semro Seattle City Light May 11, 2005 Are Geothermal Projects Different than Other Resources?
Generic Documents for the Design, Build, Operate Contract for a Solid Waste Facility.
Explanation of Changes to Draft “Firming” Schedule, Service Schedule E Contact: Arnie Podgorsky Mike Thompson Wright & Talisman PC
1 Instructions to bidders  Eligibility  Procedure for clarifications  Bid preparation - form  Number of copies, addressee  Language  Pricing and.
Resolutions E-4168 and E-4157 Southern California Edison (SCE) requests approval of contracts with a new wind facility and a new solar photovoltaic facility.
EEI Master Power Purchase & Sale Agreement Drafting Committee Optional Provisions to EEI Master Power Purchase & Sale Agreement remarks of Dickson C. Chin*
Third-Party Solar Financing Options in New Hampshire 1.
Outage Planning Subcommittee Mark Wilson. Outage Planning Subcommittee Created to address Market Participant concerns with existing rules and procedures.
Common Energy Derivatives and Their Use to Manage Risk
Governor’s Clean Energy GREEN TEAM Annual Statewide Air Quality Conference May 10, 2001.
BIDDERS CONFERENCE APRIL 3, SOLICITATION RENEWABLES PORTFOLIO STANDARD.
G 200 L 200 ISO NEW ENGLAND T H E P E O P L E B E H I N D N E W E N G L A N D ’ S P O W E R. Southwest Connecticut RFP Markets Committee November 14, 2003.
Programs/Products that ERCOT Does Not Presently Offer ERCOT Demand Side Working Group New DR Product Options Subgroup Jay Zarnikau Frontier Associates.
Overview of Governing Document for Weather-Sensitive ERS Pilot Project Stakeholder Workshop Mark Patterson, ERCOT Staff March 1, 2013.
BIDDERS CONFERENCE July 20, SOLICITATION RENEWABLES PORTFOLIO STANDARD.
Demand Side Working Group March 5, 2010 Mary Anne Brelinsky EDF Trading North America.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4144/SMB/HL-LHC (Point 1) IT-4155/SMB/HL-LHC (Point 5)
Offset Purchase Agreements: Key Issues RON EZEKIEL Fasken Martineau
BIDDER’S CONFERENCE: Eskom Grid Connection Process and related matters Date: 16 August 2012.
Confidential & Proprietary Mark-to-Market Accounting Enron Global Markets November 2000.
Auction Format and Fiscal Terms New York Task Force Meeting April 28,
Dallas Area Rapid Transit Pre-Bid Conference Event #B Purchase and Install 5 Generators February 25, 2016.
Session 22 (R) Utility Scale Solar Development Power Purchase Agreements (PPAs) April 04, 2016.
HOW TO PROTECT YOUR INTEREST IN A SALE CONTRACT Focus on what you “get” when you sign!
Joint Energy Auction Implementation Proposal of PG&E, SCE and SDG&E California Public Utilities Commission Workshop – November 1, 2006.
SCE Green Rate and Community Renewables Programs 2016.
Prepared by California Department of Water Resources May 31, 2001
Carbon Free Energy with Storage 2017 JOINT REQUEST FOR OFFERS
BIDDING DOCUMENTS AND MAIN FEATURES
© 2014 Cengage Learning. All Rights Reserved.
Monterey Bay Community Power and Silicon Valley Clean Energy Joint RFP for Renewable Portfolio Standard Resources to Achieve Carbon-Free Goals Bidders.
Presentation transcript:

RPS Bidders Workshop May 11, RPS Bidders Workshop Guidance for Inputs to PPA May 11, 2007

RPS Bidders Workshop May 11, Cover Sheet Contact Information for Parties Reference for key contract information New Generation Facility, Section 3.9 Credit and Collateral Requirements, Sections 8.2 and 8.4 No Fault Termination provisions, Sections 10.1(a) and (b) Production Tax Credit (“PTC”)/Investment Tax Credit (“ITC”) termination, Section 10.1(c). Confidentiality, Section 10.7 Article One: Definitions Article Two: Governing Terms and Term Cover Sheet & Articles One and Two

RPS Bidders Workshop May 11, No ModificationPG&E PPA Reference Bid Price CPUC Approval Article One Definitions, “Bid Price” Article One Definitions, “CPUC Approval” Green AttributesArticle One Definitions, “Green Attributes,” and Section 3.2 Green Attributes Market Price Referent Contract Term Article One Definitions, “Market Price Referent” Delivery Term options in Section 3.1(c) SEP Awards and ContingenciesSection 10.1(a) and (b) CEC CertificationSection 10.2(b) and Article One Definitions, “Eligible Renewable Energy Resource” AssignmentSection 10.6 ConfidentialitySections 10.7 and 10.8 Applicable LawSection These terms are highlighted in the online versions of the PPAs (see Non-Modifiable Standard Terms & Conditions

RPS Bidders Workshop May 11, Section 3.1(a) – Product –Select PPA for As-Available or for Baseload, Peaking, or Dispatchable Section 3.1(c) – Delivery Term –Select 10, 15, or 20 contract years –Other is allowed, but must justify to CPUC Section 3.1(d) – Delivery Point –PPA set up for NP15 in CAISO –Mark up PPA for delivery outside of NP15 Article Three: Obligations and Deliveries

RPS Bidders Workshop May 11, Section 3.1(e) – Contract Quantity –Enter the expected annual energy output –For As-Available, also enter % of Contract Quantity guaranteed over 24 month rolling period Example: for a 70% annual guarantee, enter 140% Section 3.1(f) – Contract Capacity –Enter the maximum capacity available for delivery Section 3.1(h) – Interconnection Facilities –Enter the interconnection point (substation or transmission line) Article Three: Obligations and Deliveries (continued)

RPS Bidders Workshop May 11, Section 3.4(b) – EIRP Requirements (for As- Available only; does not apply to Baseload) –Pick the applicable paragraph depending on EIRP eligibility as of execution date Section 3.9(c)(iii) – Guaranteed Project Milestones –Enter the Guaranteed Construction Start Date and the Guaranteed Commercial Operation Date Up to 180 day allowance for early COD Up to 90 day delay for Force Majeure Up to 60 day cure period for missing milestones Article Three: Obligations and Deliveries (continued)

RPS Bidders Workshop May 11, Section 4.1 – Contract Price –For each Contract Year, enter the price per MWh Price can be flat or vary by Contract Year Section 4.3 (As-Avail) or 4.4 (Baseload) – Monthly TOD Payment –Sum of each hour’s Scheduled Energy times the Contract Price times the TOD Factor –Example: 3-4 pm on a Tuesday in June 50 MW scheduled * $80/MWh contract price * TOD factor = $8148 Article Four: Compensation; Monthly Payments

RPS Bidders Workshop May 11, Section 4.6 (As-Avail) and 4.7 (Baseload) – Imbalance Energy –If in EIRP (As-Avail), all imbalances between Scheduled and Delivered Energy are settled between Seller and CAISO –If not in EIRP (As-Avail and Baseload), true-up between seller and buyer based on price differences for Imbalance Energy and the TOD- adjusted Contract Price –If Delivered > Scheduled (defined as Positive Imbalance Energy) and if the Imbalance Price > (Contract Price * TOD factor), Buyer’s monthly payment to Seller is reduced by the amount of the Imbalance times the price difference (Imbalance Price – Contract Price * TOD) –If Delivered < Scheduled (defined as Negative Imbalance Energy) and if the Imbalance Price < (Contract Price * TOD factor), Buyer’s monthly payment to Seller is reduced by the amount of the Imbalance times the price difference (Imbalance Price – Contract Price * TOD) Article Four: Compensation; Monthly Payments (continued)

RPS Bidders Workshop May 11, Example: Positive Imbalance Energy –50 MWh scheduled, 55 MWh delivered –Contract Price is $80/MWh, TOD factor is –Applicable Imbalance Price is $200/MWh –Buyer’s monthly payment to Seller is reduced by the amount of the Imbalance times (Imbalance Price – Contract Price * TOD) (55 MWh – 50 MWh)*($200/MWh - $80/MWh*2.037)= $ –If Imbalance Price < $80/MWh*2.037, then no true up Example: Negative Imbalance Energy –50 MWh scheduled, 45 MWh delivered –Contract Price is $80/MWh, TOD factor is –Applicable Imbalance Price is $100/MWh –Buyer’s monthly payment to Seller is reduced by the amount of the Imbalance times (Imbalance Price – Contract Price * TOD) (45 MWh – 50 MWh)*($100/MWh - $80/MWh*2.037)= $ –If Imbalance Price > $80/MWh*2.037, then no true up Article Four: Compensation; Monthly Payments (continued)

RPS Bidders Workshop May 11, Performance Adjustments for Baseload/Peaking PPA only Section Capacity Factor Section Performance Adjustment –For each of the TOD periods (Super-Peak, Shoulder, Night) within each of the months of Period A (June, July, August, and September), performance measured and settled monthly –For each of the TOD periods in Period B (Oct-Feb) and Period C (Mar- May), performance measured and settled monthly, but then trued up on an aggregated basis for each Period B or C Article Four: Compensation; Monthly Payments (continued)

RPS Bidders Workshop May 11, The first table (from Baseload Section 4.5) shows minimum required capacity factors (including maintenance allowance) for each period The second table (from Baseload Section 4.6) shows the % adjustment for each 1% that the actual capacity factor is below the minimum Performance Adjustments for Baseload/Peaking PPA Monthly Period1. Super-Peak2. Shoulder3. Night A.June – September95%90%80% B.Oct.– Dec.;Jan.&Feb.90%85%65% C.Mar.– May80%75%65% Performance Requirements: Capacity Factor For Each Period Monthly Period1. Super-Peak2. Shoulder3. Night A.June – September B.Oct.– Dec.,Jan.&Feb C.Mar.– May Performance Adjustment Factors For Each TOD Period

RPS Bidders Workshop May 11, Example: Super-Peak period in June –10 MW Contract Capacity, 1554 MWh Delivered –176 hours in TOD period, 8 Seller Excuse Hours –Contract Price $80/MWh, TOD factor Capacity Factor = Delivered Energy / (Contract Capacity x (Hours in TOD Period minus Seller Excuse Hours)) –= 1554 MWh / (10 MW x (176 hours – 8 hours)) = 92.5% Maximum Performance Adjustment = Contract Price x TOD Factor x x Contract Capacity x (Hours in applicable TOD Period minus Seller Excuse Hours) –= $80/MWh x x x 10 MW x (176 hours – 8 hours) = $273,773 Performance Adjustment = (Performance Requirement - Capacity Factor) x Performance Adjustment Factor x Maximum Performance Adjustment –= (95% %) x 3.00 x $273,773 = $20,533 Performance Adjustments for Baseload/Peaking PPA (cont’d)

RPS Bidders Workshop May 11, Payments and Performance Adjustments for Dispatchable PPA Section 4.10 –Capacity Payments based on Time of Availability (TOA) Factor and actual availability –Monthly Capacity Payment = Capacity Price x TOA Factor x Contract Capacity For months with minimum of 90% and 95% availability, 4% payment reduction for each 1% that actual is below minimum For months with minimum of 70% availability, 1.5% payment reduction for each 1% that actual is below minimum

RPS Bidders Workshop May 11, An outage resulting from Force Majeure that prevents the Project from delivering at least 60% of Contract Quantity to the Delivery Point for a consecutive 12 month period The failure to meet either of the “Guaranteed Project Milestones” after the 60-day cure period has expired For As-Available Products, the failure to achieve the Guaranteed Energy Production requirement For Baseload and Peaking Products, Capacity deficiency or Capacity Factor deficiency –Net Rated Output Capacity is less than specified amount at COD or specified percent after COD –Capacity Factor is less than specified percent for 12 consecutive months (reasons other than Seller Excuse Hours) For Dispatchable Products only, Availability Factor deficiency Article Five: Event of Default

RPS Bidders Workshop May 11, Article Six: Payment Article Seven: Limitations Article Eight: Credit and Collateral Requirements Article Nine: Governmental Charges Articles Six through Nine

RPS Bidders Workshop May 11, Article Ten: Miscellaneous –SEP Awards and Contingencies –Production Tax Credit (“PTC”)/Investment Tax Credit (“ITC”) termination –Representations, Warranties and Covenants –Indemnities –Assignment –Confidentiality –Audit –Insurance –Access to Financial Information Article Ten

RPS Bidders Workshop May 11, Article Eleven: Conditions Precedent Article Twelve: Dispute Resolution Article Thirteen: Notices Articles Eleven through Thirteen

RPS Bidders Workshop May 11, Appendix IForm of Letter of Credit Appendix IIInitial Energy Delivery Date Confirmation Letter Appendix IIIMilestones Schedule Appendix IVProject Description Including Description of Site Appendix VForm of Certification Appendix VICommercial Operation Certification Procedure and Procedure for Subsequent Capacity Terms Appendix VII Form of Monthly Progress Report Appendix VIIIOutage Notification Form Appendix IXCounterparty Notification Requirements for Outages and Generation Schedules. Appendix XResource Adequacy Appendices