NCSX Field Period Assembly (FPA) Operations, Cost and schedule, staffing, and metrology utilization Mike Viola Field Period Assembly Manager NCSX FPA Peer.

Slides:



Advertisements
Similar presentations
Archiving NCSX Construction Information Using the PPPL Windows Based Server.
Advertisements

NCSX Mod Coil C1 features requiring rework at PPPL.
1 MC Assembly via Test Cell Crane FPA Stage 3 Peer Review August 12, 2005 T. Brown.
NCSX Vacuum Vessel Overview Paul Goranson WBS 12 Manager Vacuum Vessel Manufacturing Study Kickoff meeting April 29, 2003.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
Scheduling PREREQUISITES FOR EFFECTIVE SCHEDULING.
Metrology for NCSX Steve Raftopoulos and the NCSX Metrology Team.
NCSX May 12, 2005 ACC Review- Station 5 J.H. Chrzanowski - 1 ACC Review Of Modular Coil Manufacturing Facility Station No. 5 [VPI] the NCSX Manufacturing.
NCSX Metrology 1/7/04. Short term purchase recommendation Buy the Spatial Analyzer Software package –This software will be the user interface for operating.
From Research Prototype to Production
GLAST Large Area Telescope:
Chapter 4 Process Design.
SC Project Review of NCSX, April 8-10, 2008 NSCX Poloidal Field Coils Michael Kalish.
1 Stage 3 Peer Review October 26, 2006 T. Brown. 2 Field Period Assembly (FPA) 1.Make sure the requirements for the tooling is well defined (including.
NCSX Vacuum Vessel Joint Design Mike Viola PPPL July 1 st, 2003.
FCS - AAO - DM COMPE/SE/ISE 492 Senior Project 2 System/Software Test Documentation (STD) System/Software Test Documentation (STD)
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
1 Dimensional Control for the National Compact Stellarator Experiment R. Ellis, A. Brooks, T. Brown, W. Reiersen, S. Raftopoulos, B. Stratton Presented.
1 NCSX Modular coil winding pack To shim or not to shim? NCSX WBS 1 Engineering Meeting July 7, 2004 What is requirement? What is baseline winding pack.
1 Stage 3 Peer Review October 26, 2006 T. Brown. 2 Field Period Assembly (FPA) – Stage 3 1.Make sure the requirements for the tooling is well defined.
Trip Report from CERN and Wendelstein W7-X October 6 – 13, 2007 Michael Viola; Steve Raftopoulos; Bill Sands October 6-10 CERN Geneva, Switzerland October.
February NSTX-U Team Meeting. Engineering Operations Feb. 11, 2014 NSTX-U In-Vessel installations and Calibrations to conclude in late March (3/28/2014)
Pre-Lehman Review Briefing Reiersen December 18, 2006.
10/31/2007Mike Viola1 NCSX Field Period Assembly + + = October 31, 2007 Mike Viola Field Period Assembly Manager.
NCSX NCSX Design Review Guide May 27, 2005 Wayne Reiersen NCSX.
12/2/04Module 2D1 The NCSX Engineering Web – An Overview Part IV Engineering Management & Systems Engineering and Other.
10/31/2007Mike Viola1 NCSX Field Period Assembly + + = October 31, 2007 Mike Viola Field Period Assembly Manager.
NCSX VACUUM VESSEL PL Goranson Thermal Insulation Final Design Review July 31, 2006 WBS12 NCSX.
NCSX Metrology. Goals –Need to accurately make measure measurements for several NCSX systems Modular coil –As-built measurements of coil form –Conductor,
Metrology Milestones Metrology Task Force –Vacuum vessel manufacture - P. Goranson –Mod. Coil Form manufacture - D. Williamson –Mod. Coil winding- S. Raftopoulos.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62)
Conceptual Design Requirements for FIRE John A. Schmidt FIRE PVR March 31, 2004.
10/31/2007Mike Viola1 NCSX Field Period Assembly + + = October 31, 2007 Mike Viola Field Period Assembly Manager.
NCSX Systems Engineering Management Plan Peer Review Bob Simmons May 15, 2003.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
NCSX Field Period Assembly (FPA) Operations, Cost and Schedule, Staffing, and Metrology Utilization Mike Viola Field Period Assembly Manager NCSX FPA Peer.
11/2/2005Mike Viola1 November Lehman Review November 2, 2005 NCSX VVSA NCSX Vacuum Vessel Fabrication Major Tool and Machine – S F 3 120° segments.
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
1 Field Period Assembly Office of Science Project Review Princeton Plasma Physics Laboratory Princeton, NJ November 2, 2005 T. Brown Princeton Plasma Physics.
NCSX NCSX Vacuum Vessel R&D, Risk Management and Manufacture NCSX Preliminary Design Review October 7-9, 2003 Princeton, NJ Mike Viola, Phil Heitzenroeder,
10/31/2007Mike Viola1 NCSX Field Period Assembly + + = October 31, 2007 Mike Viola Field Period Assembly Manager.
SC Project Review of NCSX, April 8-10, 2008 NCSX Field Period Assembly Mike Viola NCSX Field Period Assembly Manager NCSX Project Review April 8-10, 2008.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62) Manager.
SC Project Review of NCSX, April 8-10, 2008 NCSX Machine Assembly E. D. Perry.
How the NCSX Project Does Business
NCSX November 18-20, 2003NCSX Performance Baseline ReviewMichael Viola 1 NCSX Vacuum Vessel R&D, Risk Management and Manufacture Mike Viola, Phil Heitzenroeder,
1 Stellarator Core Metrology issues NCSX WBS-1 Meeting April 2, 2003 What are we measuring? When? How do we take the measurements? How do we correlate.
1 Assembly Tooling PU Workshop on NCSX Cost & Schedule Princeton Plasma Physics Laboratory Princeton, NJ Mar 1-4, 2007 T. Brown Princeton Plasma Physics.
AWB Dimensional Control Requirements for the Modular Coils and TF coils Field Period Assembly Peer Review October 11-12, 2006 Art Brooks.
Field Period Assembly Wayne Reiersen SC Project Review PPPL May 2006.
12/2/04Module 2C1 The NCSX Engineering Web – An Overview Part III Design Data, Fabrication, Assembly, and Installation Plans.
DISCUSSION BCP in subassemblies or in fully assembled cavity? Silvia Verdú-Andrés | Brookhaven National Laboratory | 11 December 2015 Thanks to Mike Kelly.
DRAFT Cost and schedule, staffing, metrology utilization 10 AM October 12, 2006 Mike Viola Field Period Assembly Manager.
9/28/20051 Mike Viola 1, T. Brown 1, P. Heitzenroeder 1, F. Malinowski 1, W. Reiersen 1, L. Sutton 1, P. Goranson 2, B. Nelson 2, M. Cole 2, M. Manuel.
10/31/2007Mike Viola1 NCSX Field Period Assembly + + = October 31, 2007 Mike Viola Field Period Assembly Manager.
Engineering Operations Outage Status: New shielding of HHFW/in-vessel components has been completed. Fit-ups of OH bus lead upgrades to reduce error fields.
Preparations for working on Station 1 November 22, 2005.
NCSX Strykowsky 1Cost and Schedule Rebaseline April 25, 2005 NCSX Project Re-baseline Review April 25, 2005 Cost and Schedule Ron Strykowsky.
8/15/2007Mike Viola1 NCSX Field Period Assembly + + = August 15, 2007 Mike Viola Field Period Assembly Manager.
12/19/2006Mike Viola1 December Lehman Review December 19, 2006 Mike Viola Field Period Assembly Manager NCSX Field Period Assembly + + =
NCSX VVSA / MCWF FDR A Systems Engineering Perspective Wayne Reiersen Bob Simmons NCSX VVSA / MCWF FDR May 19-20, 2004 PPPL.
1 WBS 1 Preparation for FDRs NCSX WBS 1 Engineering Meeting March 17, 2003 What establishes the plan? What are near term deliverables? How will we status.
Status of MICE RF for Step V’ (at LBNL) Derun Li Lawrence Berkeley National Laboratory December 6, 2014.
1 VV Support Fixture FPA Stage 1 PDR Review August 10, 2005 T. Brown.
NCSX Strykowsky 1Independent Project Review (IPR) June 8-9, 2004 NCSX Project Review June 8-9, 2004 Cost, Schedule, and Project Controls Ron Strykowsky.
1 NCSX Construction Overview NCSX Team (presented by L. Dudek) March, 2008.
SC Project Review of NCSX, April 8-10, 2008 C. A. Gentile NCSX Startup (WBS 85) C.A.Gentile NCSX CD-4 Startup.
NCSX Vacuum Vessel Fabrication
© 2004 – 2011 PAVAC Industries Inc. All rights reserved
CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.
Presentation transcript:

NCSX Field Period Assembly (FPA) Operations, Cost and schedule, staffing, and metrology utilization Mike Viola Field Period Assembly Manager NCSX FPA Peer Review October 11-12, 2006 PPPL

NCSX October 12, 2006NCSX Field Period Assembly Peer Review M. Viola 2 FPA Concerns and Risks Heavy emphasis on Prototyping each activity Crack Work Crew and Support –Our most highly effective and ingenious technicians assigned to perform first time tasks. More time allocated for first time. John Edwards 30 years experience (Master Support Technician), Mike Duco from Lockheed (simulations, manufacturing, coatings vibrations), Ed Bush 20+ Quality Assurance then NB Ion Sources. –Augmented as needed by Cryogenic operators and NB Technicians Learning Curve (Extra time included in schedule) –Perform all tasks first with crack crew – Prove principles to mitigate risk!! And then Finalize Procedures. –Train secondary support crew to perform bulk of work Tooling –Crack Crew perform dry run of tooling Metrology (Mike Duco with Steve Raftopoulos Support) –Leica Laser: ” accuracy –Romer arm: ” accuracy (2 other Romer Arms available)

NCSX October 12, 2006NCSX Field Period Assembly Peer Review M. Viola 3 FPA Metrology Issues Available Equipment in house –Leica Laser: ” accuracy –Romer arm: ” accuracy (2 other Romer Arms available) Reliability –Hardware/Software is ~80% reliable. –Have days of crashing and unpredictable operations. Combination of Windows, Verisurf, MasterCAM, Leica Power Inspect, ROMER… Reach/Accessibility –Coils are easy to reach but need high accuracy –VVSA is hard to reach but localized activities can use lower accuracy equipment. Repeatability –Datums strategically located to provide individual activity support –May need recommendation for datum locations to be used through final machine assembly if datum shift or tolerance buildup is of concern Expert support group being considered within Fabrication Division.

NCSX October 12, 2006NCSX Field Period Assembly Peer Review M. Viola 4 “SAFELY SAFELY SAFELY” Documentation and ISM Work Plans –Manufacturing Facility Operation Plan (MFOP) covers overall facility conduct using ISM as its basis. –Activities Control Committee (ACC) independently reviews each station setup, operations, and plans before station is activated.

NCSX October 12, 2006NCSX Field Period Assembly Peer Review M. Viola 5 FPA Process Definitions FPA Manufacturing, Inspection, Test, Quality Assurance Plan (MIT/QA) –Input: Dimensional Control Plan FPA Assembly Sequence Plan FPA Specification and Assembly Drawings –Output: Individual procedures to perform tasks then revised to include developed improvements.

NCSX October 12, 2006NCSX Field Period Assembly Peer Review M. Viola 6 FPA Roll up Schedule

NCSX October 12, 2006NCSX Field Period Assembly Peer Review M. Viola 7 FPA Cost and Schedule –Station 1 $744K 6/30/06 – 1/17/08 –Station 2 $336K 10/5/06 – 1/31/08 –Station 3 $300K 7/31/07 – 4/7/08 –Station 4 $214K 10/4/07 – 6/3/08 –Station 5 $647K 9/14/07 – 7/11/08 Total FPA Cost $2.241M

NCSX October 12, 2006NCSX Field Period Assembly Peer Review M. Viola 8 FPA Metrology VVSA1_MTM_FINAL_NUMBERSVVSA1_PPPL_BEST_FIT Very good agreement.

NCSX October 12, 2006NCSX Field Period Assembly Peer Review M. Viola 9 FPA Metrology VVSA2_MTM_FINAL_NUMBERSVVSA2_PPPL_BEST_FIT Metrology is serving appropriate needs.

NCSX October 12, 2006NCSX Field Period Assembly Peer Review M. Viola 10 FPA Station 1 Active Station 1 setup Port prefit

NCSX October 12, 2006NCSX Field Period Assembly Peer Review M. Viola 11 FPA Schedule

NCSX October 12, 2006NCSX Field Period Assembly Peer Review M. Viola 12 FPA Station 1 Station 1 Schedule (VVSA) –All three VVSA’s received by 9/30/06 –All work performed on station 1 fixture (2 “rotisserie” stations) with Leica & 2 men augmented with 3 technicians when needed –Install VVSA external components (Diagnostic Coils, Cooling Tubes, Thermocouples) Laser or Romer Tooling Checks and Metrology Training 5/15/06 – FP#1 6/30/06 – 5/3/07 FP#2 (VVSA #3) 9/30/06 – 8/31/07 FP#3 (VVSA #2) 8/1/06 – 1/17/08

NCSX October 12, 2006NCSX Field Period Assembly Peer Review M. Viola 13 FPA Station 2 Station 2 Schedule (3 Coil preassembly) –Perform crude prefit – any gross interferences & Tooling checkout 10/30/06 – 6/19/07 –Perform prefit – shim and alignment –Align and Assembly Laser Tracker Tooling checks 10/5/06 – 3/4/07 FP#1 3/5/07 – 9/6/07 FP#2 9/7/07 – 11/15/07 FP#3 11/16/07 – 1/31/08

NCSX October 12, 2006NCSX Field Period Assembly Peer Review M. Viola 14 FPA Station 3 Station 3 Schedule (Coils onto VVSA) (Laser Tracker or Internal GPS) –Align and Assembly 2 coil three packs Tooling checks 7/31/07 – 8/27/07 FP#1 9/7/07– 10/4/07 FP#2 11/16/07 – 12/10/07 FP#3 2/1/08 – 2/21/08 –Align and Assembly Coils onto VVSA Tooling checks 7/31/07 – 8/27/07 FP#1 8/28/07– 11/7/07 FP#2 11/8/07 – 1/16/08 FP#3 1/17/08 – 4/7/08

NCSX October 12, 2006NCSX Field Period Assembly Peer Review M. Viola 15 FPA Station 4 Station 4 Schedule (TF Coils) Laser Align and Assembly TF Coils Tooling checks 10/4/07 – 11/14/07 FP#1 11/15/07 – 1/15/08 FP#2 1/16/08 – 2/19/08 FP#3 2/20/08 – 6/3/08

NCSX October 12, 2006NCSX Field Period Assembly Peer Review M. Viola 16 FPA Station 5 Station 5 Final Assembly Schedule in NCSX Test Cell to enhance efficiency and reduce HP overhead (Weld ports, Install TF Coils, Leak Check, Final metrology) –Align and Assembly Laser Tracker and Laser on Target for port welding Tooling checks 9/14/07 – 10/4/07 FP#1 11/8/07 – 4/4/08 FP#2 1/17/08 – 5/20/08 FP#3 4/11/08 – 7/11/08

NCSX October 12, 2006NCSX Field Period Assembly Peer Review M. Viola 17 FPA Summary To Conclude –Our best technicians are assigned to these FPA tasks. –Some assembly operations are still somewhat conceptual and will be tested out prior to actual work is performed. –Reasonable time is allocated to perform FPA including proof of principle. Open Issues –I invite the review team to offer their concerns or provide advice. –Some activities are still quite conceptual –Datum transferability and tolerance buildup –Very limited machine serviceability

NCSX October 12, 2006NCSX Field Period Assembly Peer Review M. Viola 18 And if all else fails We found this guy