NERC Event Analysis Overview ERCOT ROS Meeting Austin, Texas May 15, 2006.

Slides:



Advertisements
Similar presentations
Perspectives on Demand Response Rick Sergel President & CEO, NERC Demand Response Town Meeting June 2, 2008.
Advertisements

Strategic Planning Update For Board Meeting December 5, 2007.
NERC Orientation Joint Guidance Committee WECC Leadership
NERC Reliability Readiness The Next Steps Mitch Needham NERC Readiness Evaluator September 24, 2007.
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee March 2014.
Information System Assurance Practices in China Key players doing IS Assurance In China Regulatory Regime and Professional Organizations -Regulatory AuthoritiesRegulatory.
August 14, 2003 Blackout Final Report
Standards Development: Update to IMO Regulatory Standing Committee May 14, 2003.
NERC and Regional Efforts to Ensure Reliability Dave Nevius, NERC Sr. VP David Cook, NERC VP & General Counsel Louise McCarren, WECC CEO Don Benjamin,
Date Texas RE Board Update to TAC November 5, 2009 Susan Vincent Director, Legal Affairs.
Corporate Ethics Compliance *
ERCOT’S COMPLIANCE ASSESSMENT PROGRAM Mark Henry Compliance Manager March 23, 2005.
The Electric Reliability Organization Mandatory Reliability Standards Gerry Cauley Vice President and Director of Standards.
North American Electric Reliability Corporation History and Developments Rhaiza Villafranca Reliability Assessment Performance Analysis Technical Analyst.
Electric Power Infrastructure: Status and Challenges for the Future Mark Lauby Director, Reliability Assessments and Performance Analysis.
Assessing Statistical Systems Graham Eele – World Bank, Development Data Group.
Generator Data Submittals 5/8/ Transmission Customer Forum Bob Jones Transmission Planning Southern Company Transmission 5/8/ Transmission.
Averting Disaster - Grid Reliability Issues and Standards National Energy Restructuring Conference April 1, 2004 Washington, DC.
GOP and QSE Relationship Jeff Whitmer Manager, Compliance Assessments Talk with Texas RE June 25, 2012.
ERCOT Compliance Audits Robert Potts Sr. Reliability Analyst March 23, 2005.
Business Analysis: A Business Unit Perspective International Institute of Business Analysis January 18, 2012.
Risk Management Office ECO-IDB Workshop on Risk Management 4 March 2012.
Generation & Trading CIST REGIONAL ENERGY MARKET IN SOUTH EAST EUROPE (REM) Athens – 27 th of October 2004.
Nuclear Power Plant/Electric Grid Regulatory Coordination and Cooperation - ERO Perspective David R. Nevius and Michael J. Assante 2009 NRC Regulatory.
Frequency Response Initiative Robert W. Cummings Director of System Analysis and Reliability Initiatives NERC Standing Committees September 14-15, 2010.
H.B. “Trip” Doggett President and Chief Executive Officer Tab 4: Proposed 2013 – 2017 Strategic Plan – Redline Board of Directors Strategic Planning Event.
Integration of Variable Generation Task Force Preliminary Conclusions and Actions.
Compliance Performance Measure Proposals and Preliminary Trends Greg Pierce – Chair, Performance Measures Task Force Compliance and Certification Committee.
VISUALIZATION WHY WE NEED SYNCHROPHASOR TECHNOLOGY IN OPERATIONS John Ballance – EPG Presented to ERCOT Phasor Technology Workshop – November 16, 2012.
Page 0 Eastern Interconnection Phasor Demonstration Enhanced Wide-Area Visibility In the Eastern Interconnection for Reliability Management Transmission.
NERC as the ERO Craig Lawrence Manager of Organization Registration, Certification, and Compliance Monitoring.
1 Renewable Technology Working Group (RTWG) July 14, 2009 Henry Durrwachter.
Texas Regional Entity Update Sam Jones Interim CEO and President Board of Directors July 18, 2006.
Actions Affecting ERCOT Resulting From The Northeast Blackout ERCOT Board Of Directors Meeting April 20, 2004 Sam Jones, COO.
1 Texas Regional Entity 2008 Budget Update May 16, 2007.
Overview of WECC and Regulatory Structure
Assessing the Capacity of Statistical Systems Development Data Group.
Status Report for Critical Infrastructure Protection Advisory Group
FCC Field Hearing on Energy and the Environment Monday November 30, 2009 MIT Stratton Student Center, Twenty Chimneys Peter Brandien, Vice President System.
Board of Directors Meeting February 26, 2013 Standards, Registration and Certification Report.
Item 5d Texas RE 2011 Budget Assumptions April 19, Texas RE Preliminary Budget Assumptions Board of Directors and Advisory Committee April 19,
February 26, 2013 Board of Directors Meeting 2012 ERCOT Region Reliability Update.
1 Compliance Update May Control Performance Highlights  NERC CPS1 Performance Performance further declined in March  March performance comparison.
REGULATORY PERSPECTIVE ON USING OPERATIONAL EXPERIENCE Thomas E. Murley Former Director of Nuclear Reactor Regulation USNRC Conference on Improving Nuclear.
ERCOT Generation Adequacy Study TAC Meeting February 7, 2002.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Regulatory Authority.
Draft Reliability Standards Development Plan Ryan Stewart, NERC Manager of Standards Development Texas RE NSRS August 17, 2015.
Employee Privacy at Risk? APPA Business & Financial Conference Austin, TX September 25, 2007 Scott Mix, CISSP Manager of Situation Awareness and Infrastructure.
NERC and ESISAC Electricity Sector Information Sharing and Analysis Center Update March 2006 CIPC Confidentiality: Public Release.
November 2, 2006 LESSONS FROM CIPAG 1 Lessons from Critical Infrastructure Group Bill Bojorquez November 2, 2006.
Compliance Update September Control Performance Highlights  NERC CPS1 Performance ERCOT’s August score was ERCOT’s CPS1 scores show significant.
FERC Staff’s Report on Demand Response and Advanced Metering.
RSC An Overview of Fill-In-the-Blanks (FIB) Reliability Standards Farzaneh Tafreshi Manager, Reliability Standards Texas Regional Entity
Operations Report Kent Saathoff System Operations ERCOT.
1 Texas Regional Entity Report November Performance Highlights  ERCOT’s Control Performance Standard (NERC CPS1) score for September –
Impacts and Actions Resulting from the August 14, 2003 Blackout Minnesota Power Systems Conference November 2, 2003.
Planning for Texas’ Energy Future Select Committee on Electric Generation Capacity and Environmental Effects Bob Kahn President & CEO February 6, 2008.
Role of Account Management at ERCOT 2006 TAC Subcommittee Review ERCOT Board February 21, 2006.
ERCOT IT Update Ken Shoquist VP, CIO Information Technology Board Meeting February 2004.
1 Compliance Update April Control Performance Highlights  NERC CPS1 Performance Performance further declined in March  March performance comparison.
Reliability and the Market Place Perfect Together The Transition from NERC to NAERO Baltics Working Group June 6, 2001 Princeton, NJ The Transition from.
Reliability Standards Committee 2009 Scope and Plan Judith James Manager, Reliability Standards.
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
NERC Reliability Readiness The Next Steps
Natural Gas Infrastructure Assessment
Compliance Performance Measure Proposals and Preliminary Trends
Impacts and Actions Resulting from the August 14, 2003 Blackout
Resilience Framework Mark Lauby, Senior Vice President and Chief Reliability Officer WIRES Winter Meeting February 15, 2018.
Performance Measure Recommendations
Cyber Security in a Risk Management Framework
Presentation transcript:

NERC Event Analysis Overview ERCOT ROS Meeting Austin, Texas May 15, 2006

2 Committees Program Groups Subject Matter Expert Groups President & CEO President & CEO Members’ Forums Compliance & Organization Certification Compliance & Organization Certification Situation Awareness & Infrastructure Security Standards Reliability Readiness Reliability Readiness Training, Education & Operator Certification Information Technology Legal & Regulatory Finance & Accounting Reliability Assessment & Performance Analysis Future Adequacy Benchmarking Event Analysis Human Resources Administration

3 Overall Scope of RAPA Programs ● Reliability Assessment – Looking Ahead  Independently assess and report on reliability and adequacy of the bulk power system ● Events Analysis and Information Exchange – Looking Back for Lessons Learned  Analyze off-normal events and disseminate “lessons learned” to improve reliability performance ● Benchmarking – How are we doing?  Develop reliability performance metrics, trends, and benchmarks – requires system measurements

4 Program Scope ● Investigate large-scale outages, disturbances, and near misses  Determine root causes and lessons learned ● Identify and monitor performance to detect emerging trends and signs of decline in reliability performance ● Communicate results, trends, recommendations, and initiatives to industry

5 Events Under Investigation NERC “Action List” ● Los Angeles – Sept. 12, 2005  Blackout ● Denver – February 18, 2006  Rolling Blackouts ● NYPA / Ontario – March 29, 2006  Significant Generation Trip ● ERCOT – April 17, 2006  Rolling Blackouts

6 Los Angeles – Sept. 12, 2005 ● Design Alert – Generation Design  Undersized exciter power supply cables on Haynes Unit 10 – resulted in tripping of ~ 500 MW of generation  Turnkey project  Similar problems on sister units installed by same A&E firm  Review design (as built) of generators to ensure they can reach rated reactive power output

7 Sample Alert

8 Potential Studies for “Actions List” ● Short-term demand forecasting  Contributory to 3 disturbances in 12 months ● Generation forced outages  Weather-related  Protection / control system coordination

9 Questions