WF on SIB1bis Transmission

Slides:



Advertisements
Similar presentations
Way forward for LTE DL 4Rx AP SI on RF
Advertisements

Way Forward Proposals for Inter-band CA Consisting of B41
WF on design of physical downlink control channel for MTC CATT, Alcatel Lucent, Alcatel Lucent Shanghai Bell, Ericsson, ETRI, InterDigital, MediaTek, NTT.
WF on PBCH Coverage Enhancement
3GPP TSG RAN WG1 # R1-15xxxx Fukuoka, Japan 25th – 29th May 2015
Doc.: IEEE /1192r5 Submission MAC calibration results comparison Date: Authors: Zhou Lan (Huawei Technology)Slide 1 October 2014.
Views on IEEE m Frame Structure Document Number: C80216m-07_354 Date Submitted: November 12, 2007 Source: Sassan Ahmadi
WF on BS MMSE-IRC receiver
Rel-13 eProSe-Ext.
Way forward on TBS determination in initial partial subframes
WF on CQI Table for eMTC ZTE, Sony, Nokia, Ericsson, Samsung… R GPP TSG RAN WG1 #83 Anaheim, USA, 15th – 22nd November, 2015 Agenda item
R4-15XXXX Way forward on coexistence evaluation methodology for NB-IOT in-band and guard band operation Qualcomm, Huawei, Nokia Networks, ZTE, Intel, Ericsson,
WF on Support of EBF/FD-MIMO Features in TM9
WF on MCOT and CWS for LBT priority classes
WF on Regulation and MCOT
Way forward to NB-IoT 3GPP TSG RAN WG1 #83 R1-157xxx
WF on LAA DL Multi-Channel LBT
Proposal for NB-IoT single-tone only UE
R 18 G 65 B 145 R 0 G 201 B 255 R 104 G 113 B 122 R 216 G 217 B 218 R 168 G 187 B 192 Core and background colors: 1 © Nokia Solutions and Networks 2014.
Way forward on RAN2 aspects of multiple PRB operations
WF on UE capability signaling for FD-MIMO Class B LG Electronics, Intel Coorporation, NTT DOCOMO, Qualcomm 3GPP TSG RAN WG1 Meeting #84 R St Julian’s,
Clarification of the scope of the study on latency reduction techniques for LTE 3GPP TSG RAN Meeting #71RP-16xxxx Göteborg, Sweden, March , 2016.
WF on dynamic blockage Qualcomm, Intel, Samsung, Ericsson R GPP TSG RAN1 #85 Nanjing, China, May , 2016 Agenda Item:
WF on MCOT limit Signaling and Modifying LBT type Ericsson, … 3GPP TSG RAN WG1 #85 R1-16xxxx Nanjing, China 23 rd – 27 th May 2016 Agenda item:
WF on Supporting different Numerologies in a NR carrier LG Electronics, [Huawei, HiSilicon, Panasonic], 3GPP TSG RAN WG1 Meeting #85R Nanjing,
WF on Bandwidth Part for DL common channel
WF on RA-RNTI design 3GPP TSG RAN WG1 Meeting NR#3 R1-171xxxx
3GPP TSG-RAN WG4 Meeting NR#3 Nagoya, Japan, 18 – 21 Sep, 2017
Offline Discussion on remaining details about RACH Procedure
3GPP TSG-RAN WG4 Meeting #84bis
MAC calibration results comparison
R GPP TSG RAN WG1 Meeting #90 Prague, P.R. Czechia, 21st – 25th August 2017 Agenda: WF.
WF on new NR CG sequences for PUCCH
WF on NPUSCH scrambling for Rel-14 NB-IoT
WF on pre-DFT PT-RS pattern for DFTsOFDM
Summary of proposals on CBG-based retransmission
Summary of offline discussion for PDCCH structure
3GPP RAN1 #90 meeting summary on LAA Enhancements
WF on Beam Indication for Beam Management
WF on NB-IoT Radio Link Monitoring Performance Test Procedure
3GPP TSG RAN WG1 Meeting #90bis
WF on spherical coverage in FR2
R WF on channel raster Nokia,.
WF on remaining open items for allowing 1Tx transmission in LTE-NR DC
WF on Beam failure recovery
WF on SS Block Index Reporting through RACH Procedure
Intel Corporation, Apple
Way forward on DL ACLR&ACS for WP5D LS
Samsung, KT Corp., NTT DOCOMO, Verizon, [ZTE], [CATT], [Intel]
WF on beam reporting CATT, Intel R1-17xxxxx
WF on Beam-Related Indication
WF on CSI timing offset for PUSCH
TSG-RAN WG1 Meeting #60bis
WF on Radio Link Monitoring in NR
Motorola Mobility, Lenovo, …
WF for 4Rx CA 256QAM(1/2 layer) and 3/4 layers tests in Rel-14
Way Forward on Coexistence Evaluation Methodologies for LAA
WF on LTE-NR DC with UL coexistence
WF on 4Tx UL Codebook For CP-OFDM
Summary of Offline Discussion on RMSI CORESET Configuration (Part 2)
WF on UL Beam Management
WF on UL Beam Management
RP Motivation for New WI (RP ): NB-LTE for Low Complexity Radio Access Network for Cellular Internet of Things Alcatel-Lucent, Alcatel-Lucent.
WF on CB-group based retransmission
Explanation of draft TP IP Radio Network Development Department
WF on Phase discontinuity issue in intra-band EN-DC with 1-PA
WF on LTE-NR Coexistence
WUR Discovery Frame Format
on the overall 5G-NR eMBB workplan
Presentation transcript:

WF on SIB1bis Transmission 3GPP TSG RAN WG1 #83 Anaheim, USA, 15th – 22nd November, 2015 Agenda item 6.2.1.9 R1-15xxxx WF on SIB1bis Transmission Nokia Networks, Ericsson, ALU, ASB, Panasonic, Samsung, CATT, Intel, Qualcomm, Sierra Wireless, InterDigital, NEC, AT&T, ZTE, LGE, MediaTek, Sony

Background Agreements from RAN1#83 6 TBS values are supported for SIB1bis Support {4, 8, 16} SIB1bis transmissions per 80ms For a given number of SIB1bis transmissions, the set of subframe(s) to be used for SIB1bis are fixed or predefined in the specification, FFS details The duration over which the content of SIB1bis that the UE can assume to NOT change is Fixed in specification to N radio frames Working assumption: N=512, which can be further discussed especially considering possible input from RAN2 5 bits in MIB are used to indicate information related to SIB1bis, low cost MTC support, and/or coverage enhancement support

No LC support, no CE support Proposal 5 MIB spare bits are used to indicate TBS and RSIB1bis via a table Value TBS RSIB1bis No LC support, no CE support 1 TBS1 4 2 8 3 16 TBS2 5 6 7 TBS3 9 10 TBS4 11 12 13 TBS5 14 15 TBS6 17 18 19 - 31 Reserved

Proposal Time location is determined from RSIB1bis and PCID for BW > 3 MHz RSIB1bis Time Allocation PCID FDD TDD System frame number Subframe number 4 even odd 5 8 any 9 16 4 and 9 0 and 5 0 and 9

Proposal For BW = 3 MHz, PBCH repetition is only in SF#0 in all frames for TDD Time location is determined from RSIB1bis and PCID For BW <= 3 MHz, only RSIB1bis = 4 is supported RSIB1bis Time Allocation PCID FDD TDD System frame number Subframe number 4 even odd 5

Proposal For BW > 3 MHz, the two middle narrowbands are not used for SIB1bis transmission In case of collision between SIB1bis transmissions and M-PDCCH/PDSCH repetitions, Drop M-PDCCH/PDSCH subframe, the unavailable subframe is counted in the repetition