1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.

Slides:



Advertisements
Similar presentations
ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
Advertisements

P.N. Burrows ATF2 Project Meeting, KEK, 14/12/091 Feedback On Nanosecond Timescales Philip Burrows Glenn Christian Hamid Dabiri Khah Javier Resta Lopez.
Philip Burrows CLIC MDI Meeting 6/11/091 Design issues for IP intra-train feedback Philip Burrows John Adams Institute Oxford University.
ATF2 FB/FF layout Javier Resta Lopez (JAI, Oxford University) for the FONT project group FONT meeting January 11, 2007.
FONT4 Status Report Glenn Christian John Adams Institute, Oxford for FONT collaboration.
P.N. Burrows ATF2 Project Meeting, KEK, 18/12/061 Philip Burrows John Adams Institute Oxford University LCABD ATF / ATF2 ESA Miscellaneous FONT.
Some simulation results on FF/FB system for ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group FONT meeting January 25, 2008.
P.N. Burrows GDE/MDI Vancouver 19/7/06 (T-488) Philip Burrows John Adams Institute Oxford University EM Background Tests of Feedback BPM.
P.N. Burrows BDS/MDI, LCWS08 Chicago, 17/11/081 Beam-based feedback for LC ILC luminosity goal 10**34 / cm**2 / s 3000 or 6000 bunches, spacing ns.
-brief report of October runs and some inputs for the Nov/Dec planning – Nobuhiro Terunuma, KEK, ATF ATF session on LCWS13, Tokyo Univ., Nov. 13, 2013.
Progress towards nanometre-level beam stabilisation at ATF2 N. Blaskovic, D. R. Bett, P. N. Burrows, G. B. Christian, C. Perry John Adams Institute, University.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
Philip Burrows Third Mini Workshop on Nano Project, KEK 30/5/05 Philip Burrows Queen Mary, University of London Overview of Intra-train Beam Feedback Program.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
IP-BPM NOV. BEAM TEST RESULTS Siwon Jang (KNU). 11cm Low-Q IP-BPM design  11cm Low-Q IP-BPM drawings of HFSS 100mm Sensor cavity Wave guide Antenna Designed.
FONT IP intra-train feedback prototype status
High Resolution Cavity BPM for ILC final focal system (IP-BPM) ILC2007/LCWS 2007 BDS, 2007/6/1 The University of Tokyo, KEK, Tohoku Gakuin University,
Philip Burrows LCUK Meeting, Oxford 29/01/04 Feedback on Nanosecond Timescales (FONT): FONT2 run results Dec 03/Jan 04 Philip Burrows Queen Mary, University.
Ground Motion + Vibration Transfer Function for Final QD0/SD0 Cryomodule System at ILC Glen White, SLAC ALCPG11, Eugene March 21, 2011.
ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group 5th ATF2 project meeting, KEK December 19-21, 2007.
Feedback on Nanosecond Timescales (FONT) - Review of Feedback Prototype Tests at ATF(KEK) Glenn Christian John Adams Institute, Oxford for FONT collaboration.
ATF2 ILC Final Focus Test Beam Line at KEK-ATF References : ATF2 Proposal, KEK Report ATF2 Proposal Vol.2, KEK Report ホームページ:
1 FONT Results 2010 Philip Burrows Robert Apsimon, Doug Bett, Glenn Christian Michael Davis, Colin Perry, Javier Resta Lopez John Adams Institute Oxford.
Philip Burrows ECFA LC Workshop, Warsaw, 10 June Philip Burrows John Adams Institute Oxford University G. Christian, C. Clarke, B. Constance, H.
Feedback On Nano-second Timescales: An IP Feedback System for the Future Linear Collider Requirement for a fast IP beam-based feedback system Simulation.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
3/25/2006 KEK LCPAC Marc Ross - SLAC 1 Results of Beam Instrumentation Studies at ATF 1.Nanometer resolution Beam Position Monitors 2.High resolution readout.
P.N. Burrows ECFA/GDE Meeting, BDIR session, Valencia, 9/11/06 Philip Burrows John Adams Institute Oxford University FONT4 tests at KEK/ATF EM background.
Development of a Low-latency, High-precision, Intra-train Beam Feedback System Based on Cavity Beam Position Monitors N. Blaskovic Kraljevic, D. R. Bett,
Philip Burrows ATF 15/03/05 FONT Group Progress + Plans 2005 Philip Burrows, Christine Clarke, Glenn Christian, Hamid Dabiri Khah, Stephen Molloy, Glen.
1 FONT R&D status Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford University.
Philip Burrows ALCPG11, Eugene 21/03/111 Performance of FONT at ATF2 Philip Burrows John Adams Institute Oxford University.
1 FONT IP Feedback System Implications of increase of L* Philip Burrows John Adams Institute Oxford University.
ATF2 Software tasks: - EXT Bunch-Bunch FB/FF - IP Bunch-Bunch FB - FB Integration Status Javier Resta-Lopez JAI, Oxford University FONT meeting 1th August.
Design of the ATF2 FB/FF Systems Javier Resta Lopez (JAI, Oxford University) for the FONT project group Final EUROTeV Scientific Workshop Uppsala, 25-27th.
Philip Burrows ATF2 project meeting 14/1/111 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.
Status of ATF Collaboration The unique test facility for ILC with a low emittance beam. Junji Urakawa, KEK LCPAC at KEK
Design and Simulation of Intra-train Feedback Systems at ATF2: Current Status and Future Plans Javier Resta Lopez (JAI, Oxford University) for the FONT.
Philip Burrows 2 nd Nano Workshop, KEK 11/12/04 Plans for FONT3 and Future Feedback Experiments Philip Burrows Queen Mary, University of London ILC system.
N. BlaskovicFONT Meeting1 ATF October 2014 shift plan N. Blaskovic.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
Feedback On Nanosecond Timescales (FONT) Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis**, Colin Perry.
Low-Q IP-BPM Schedule Siwon Jang KNU. IP-BPM Schedule IP BPM schedule –Reference cavity (middle of October) Frequency tuning parts –Electronics (middle.
Design of ATF2 feedback/feed-forward systems Javier Resta Lopez (JAI, Oxford University) for the FONT project group LC-ABD meeting Birmingham, 17-18th.
ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake.
N. BlaskovicFONT Meeting1 ATF November 2013 shift plan N. Blaskovic.
Philip Burrows ATF2 project meeting 1/07/101 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.
Cold BPM development in KEK H. Hayano, March 2011 Jung Keun Ahn (PNU), Sun young Ryu (PNU), Eun San Kim (KNU), Young Im Kim (KNU), Jin yeong Ryu (KNU),
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
Low-Q IP BPM Y. I. Kim *, A. Heo, E-S. Kim (KNU) S. T. Boogert (JAI) D. M. McCormick, J. May, J. Nelson, T. Smith, G. R. White (SLAC) Y. Honda, N. Terunuma,
1 IP FB tests at ATF2 Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford.
G.R.White: F.O.N. T. From Ground Motion studies by A.Seryi et al. (SLAC) ‘Fast’ motion (> few Hz) dominated by cultural noise Concern for structures.
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
Overview of progress at FONT Neven Blaskovic TMD technologies CASE student John Adams Institute Oxford University.
Technical Board Summary Preliminary Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 project meeting, Technical.
ATF2 Software tasks: - EXT Bunch-Bunch FB - IP Bunch-Bunch FB - FB Integration Status and plans Javier Resta-Lopez JAI, Oxford University ATF2 commissioning.
FONT4 Status Report Glenn Christian John Adams Institute, Oxford for FONT collaboration.
1 FONT IP FB Philip Burrows Robert Apsimon, Doug Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Colin Perry John Adams Institute Oxford University.
Feedback On Nanosecond Timescales (FONT) Philip Burrows Neven Blaskovic, Talitha Bromwich, Glenn Christian, Colin Perry, Rebecca Ramjiawan John Adams Institute,
Philip Burrows X-band 2010 Daresbury 2/12/101 Advanced beam feedback systems Philip Burrows John Adams Institute Oxford University.
D. BettATF Operations Meeting - 15 June IP C. Perry G. Christian Y. Kim D. Bett N. Blaskovic Kraljevic.
Fast Beam Collision Feedbacks for luminosity optimisation at next-generation lepton colliders Philip Burrows John Adams Institute Oxford University.
In collaboration with P. N. Burrows, A. Latina and D. Schulte
IPBPM test results at the LINAC end
KNU IP-BPM and Reference cavity
CLIC-UK Oxford Activities
Progress towards nanometre beam stabilisation at ATF2
Intra-Pulse Beam-Beam Scans at the NLC IP
Progress towards nanometre level beam stabilisation
Presentation transcript:

1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford University IP Feedback

2 Outline Reminder of CLIC IPFB prototype Remarks on L* ATF2 IP FB concept Results of recent beam runs

3 IP beam feedback concept Last line of defence against relative beam misalignment Measure vertical position of outgoing beam and hence beam-beam kick angle Use fast amplifier and kicker to correct vertical position of beam incoming to IR FONT – Feedback On Nanosecond Timescales

CLIC Final Doublet Region 4

5

6

7 Comments on L* Current geometry: time of flight IP  BPM  kicker  IP ~ 24 ns Demonstrated FONT3 electronics latency = 13ns Estimated IPFB latency = 37ns

8 CLIC IP FB performance Single random seed of GM C Resta Lopez

9 For noisy sites: CLIC IP FB performance  factor improvement

10 Comments on L* Current CDR geometry: time of flight IP  BPM  kicker  IP ~ 24 ns Demonstrated FONT3 electronics latency = 13ns Estimated IPFB latency = 37ns In principle, change of L* need not affect IPFB position and latency, but needs to be engineered carefully, considering other beamline components

CLIC Final Doublet Region 11

FONT5 installation at ATF2 ATF2 extraction line 12

13 IP kickerIPBPMs FONT digital FB IPBPM electronics FONT amplifier e- ATF2 IP FB loop scheme Eventual goal is to stabilise the small ATF2 beam (design 37nm) at the nanometer level

14 Nanometer beam FB at ATF2 IP Much harder than IPFB at ILC or CLIC! Only 1 beam  must measure beam position directly nm-level stabilisation requires nm-level position meas.  Cavity BPMs (rather than striplines) Cavities intrinsically slow, signal processing complicated Cavities required to resolve 2 bunches within << 300ns  Low-Q cavities and low-latency signal processing  New BPMs+electronics (KNU), new IP chamber (LAL)

15 Layout with new IP kicker Designed by Oxford Fabrication arranged by KEK

16 IP kickerIPBPMs FONT digital FB IPBPM electronics FONT amplifier e- Preparatory tests June 2013 Existing IPBPMs Honda low-latency electronics

17 Preparatory test setup A B

Preparatory test IPFB loop Analogue Front-end BPM processor FPGA-based digital processor Kicker drive amplifier Strip-line kicker Beam Cavity BPM 18

IP Feedback Results FB Off Jitter: 170 ± 10 nm FB On Jitter: 93 ± 4 nm FB Off Correlation: 81% 19

IP Feedback Results FB Off Jitter: 170 ± 10 nm FB On Jitter: 93 ± 4 nm FB Off Correlation: 81% FB On Correlation: -16% 20

Incoming Beam Position Scan 10 μm pos. scan Bunch 2

22 IP BPM resolution Beam size during measurements ~ 100 nm Model  beam jitter ~ 20% of beam size, i.e. 20nm Assuming results are resolution limited … Resolution = 93 nm / sqrt(2) ~ 65 nm (no direct resolution measurement possible)

23 New IP chamber installed summer 2013 Commissioning Started November: alignment, BPM signals

11cm Low-Q IP-BPM design 11cm Low-Q IP-BPM drawings of HFSS 100mm Sensor cavity Wave guide Antenna Designed frequency X-port: GHz Y-port: GHz Full size : 11cmx11cm (to install IP-Chamber) Light weight: 1 kg (Single cavity) 2 kg (Double cavity)

25 In May tests resumed w. Honda electronics FF quad current scan to set vertical beam waist at IPB

26 In May tests resumed w. Honda electronics Centre beam in BPM using mover  optimise resolution

27 In May tests resumed w. Honda electronics Centre beam in BPM using mover  optimise resolution

28 Summary ATF2 IPFB prototype is progressing Beam stabilised (June 2013) to ~ 100nm level Beam jitters measured (June 2014) ~ 60nm (best) Beam studies continue until June 20 th Attempting to disentangle jitter/resolution Looking at boosting signal levels  resolution Hope to close FB loop with improved resolution