Jefferson Lab Overview Bob McKeown April 20, 2015.

Slides:



Advertisements
Similar presentations
Update from NSAC NuPECC Long Range Planning Meeting Susan J. Seestrom NSAC Chair U.S. Department of Energy Office of Science.
Advertisements

The Physics of Nuclei, Nuclear Matter and Nucleosynthesis Report of the Nuclear Physics Advisory Panel.
12 GeV Parity-Violation Program Introductory Welcome Kees de Jager.
Hall A Status Hall A Collaboration Meeting June 9, 2011 Robert Michaels Acting Hall A Leader Recent Activity Publications (please write archival papers.
Future Sino-US Collaboration in QCD Phyics Ten-Year Anniversary of STAR-China Collaboration Haiyan Gao 高海燕 Duke University 1.
NSAC Report Donald Geesaman Argonne National Laboratory Chair, US Department of Energy/National Science Foundation Nuclear Science Advisory Committee NuPECC.
The Science of an EIC Nuclear Science Goals: How do we understand the visible matter in our universe in terms of the fundamental quarks and gluons of QCD?
A View from NSF The Early Years of CESR David Berley University of Maryland May 31, 2008 Two Aspects of Cornell’s Success in the International Arena of.
1 Hall A Update Thia Keppel APEX Collaboration Meeting April 2015.
Jefferson Lab Status Bob McKeown July 17, April 2015 Outline 12 GeV Project and Commissioning PAC Budgets and Schedule LERF Planning MOLLER, SoLID.
R. D. McKeown Jefferson Lab College of William and Mary The Jlab 12 GeV Upgrade 1 R. McKeown - IUPAP - July 2, 2010.
Jefferson Lab Status Hall A collaboration Dec. 16, 2013 R. D. McKeown Deputy Director For Science.
GlueX Collaboration Meeting February 2011 Jefferson Lab Our 30’th Collaboration Meeting.
Reaching to the Horizons (Working Title) The NSAC 2015 Long Range Plan Don Geesaman 1 June JLAB Users Group Meeting.
1 Auteuil, Paris March 2011 Jefferson Lab The 12 GeV Era Hugh Montgomery.
Thomas Jefferson National Accelerator Facility R.. McKeown Page 1 View from Lab Management R. McKeown DNP12 Satellite Meeting October 25, 2012.
Bob McKeown Presentation to SoLID Collaboration March 22, 2013 Jefferson Lab Update.
12 GeV Science Program R. D. McKeown JSA Science Council January 7, 2011 Thanks to A. Lung, L. Cardman, others.
UK Hadron Physics D. G. Ireland 10 October 2014 NuPECC Meeting, Edinburgh.
J EFFERSON L AB – A N I NTRODUCTION Hugh Montgomery; May 14, 2012.
POETIC 2012 Indiana University R. D. McKeown 12 GeV CEBAF.
Jefferson Lab Nuclear Science Program QCD Evolution May 26, 2015 R. D. McKeown.
Hall A Collaboration, June 10, 2010, 1 Operated by the Jefferson Science Associates for the U.S. Department Of Energy Thomas Jefferson National Accelerator.
Jefferson Lab Status APEX Meeting April 22, 2014 R. D. McKeown Deputy Director For Science.
Contractor Assurance System Peer Review April Page 1 NSTAR 2011 May 16, 2011 Jefferson Lab Hugh Montgomery.
Thomas Jefferson National Accelerator Facility R. D. McKeown Slide 1 R. D. McKeown Jefferson Lab College of William and Mary The 12 GeV Science Program.
1 EIC Update R. D. McKeown Presentation to EICAC April 10, 2011 (Thanks to R. Ent, A. Hutton, H. Montgomery, M. Farkhondeh, others)
Jefferson Lab Update R. D. McKeown Jefferson Lab HPS Meeting June 16, 2014.
Curtis A. Meyer Nuclear Science in the United States The Core of Matter The Fuel of Stars.
Status and General Considerations Jian-ping Chen, JLab SoLID Collaboration Meeting May 14-15, 2015.
Rolf Ent Jefferson Lab ? + = 2007 Long-Range Plan 2014 EIC White Paper
Welcome to Jefferson Lab R. D. McKeown Jefferson Lab Hypernuclear Workshop May 27, 2014.
Hadron Physics in America L. Cardman. Venues for Hadronic Physics Today (and their near-term plans) Two Major Facilities: Jefferson Lab (~6 GeV,
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Swapan.
10/25/2007GlueX Collaboration Meeting1 October 25-27, 2007 Jefferson Lab This is approximately our 20’th such meeting.
Nuclear Physics at Jefferson Lab Part III R. D. McKeown Jefferson Lab College of William and Mary Taiwan Summer School June 30, 2011.
MOLLER Collaboration Meeting May 2014 Hall A Update Thia Keppel 1.
Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Page 1.
The 12 GeV Physics Program at Jefferson Lab R. D. McKeown Jefferson Lab College of William and Mary PTSP 2013 – Charlottesville, VA September 9, 2013.
R.G. Milner2nd EIC Workshop Summary and Outlook science case machine design EIC realization.
StatusUpdate Jian-ping Chen, JLab SoLID Collaboration Meeting September 11-12, 2015.
Lab Update Rolf Ent January 21, January 2016 Page 2 Outline Near term schedule (note: will not include Hall C/12 GeV status as you will hear more.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Anthony.
PAC37 Charge 1 1.) Review new proposals, previously conditionally approved proposals, and letters of intent † † for experiments that will utilize the 12.
1 Melynda Brooks, “Understanding the Origin of the Nucleon Spin” Understanding the Origin of the Nucleon Spin Andi Klein, P-23, Melynda Brooks P-25, Pat.
Jefferson Lab Science Program R. D. McKeown Jefferson Lab Users Meeting June 3, 2014.
Hall A Update Thia Keppel User Group Board of Directors January 2015.
EIC NAS review Charge-2 What are the capabilities of other facilities, existing and planned, domestic and abroad, to address the science opportunities.
GlueX Collaboration Meeting
Jefferson Lab Overview
Welcome Stuart Henderson May 22, 2017.
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
Jefferson Lab Reliability Task Force and Initiatives
Report to UGBOD Bob McKeown January 14, 2016.
PAC38 Charge 1.) Review new proposals, previously conditionally approved proposals, and letters of intent† for experiments that will utilize the 12 GeV.
Jefferson Lab Status Bob McKeown May 6, 2016.
Samples of Hall B Results with Strong Italian Impact
Introduction to Jefferson Lab
Operations Department
for meson spectroscopy
Jefferson Lab Status Bob McKeown October 21, 2015.
Jefferson Lab Hugh Montgomery Jefferson Lab UGBOD January 2015.
Operations Department
View from Lab Management HPS Collaboration Meeting
Introduction and Workshop Charge
Schedule Rolf Ent HPS Meeting, May 22, 2018.
SOLID Collaboration Meeting
Physics Plans for CEBAF at 12 GeV
Feedback from the Temple Town Meeting MEIC Accelerator R&D Meeting
PAC47 Charge Robert McKeown PAC47 July 29, 2019.
Presentation transcript:

Jefferson Lab Overview Bob McKeown April 20, 2015

2 April 2015 Outline CEBAF Status PAC MOLLER, SoLID status Budget Experiment Schedule

3 April 2015 CEBAF Commissioning Current Hall D Hall B Hall A Dec. 2014: Feb. 2015: restore 5 pass beam Mar. 2015: commission new RF separator system in pass 5 Demonstrate 5 pass beam to D and A Beam to Hall A, B, D for commissioning/physics

4 April 2015 Power Outage Event March 24, 4PM JLab site lost power due to off-site event Power restored after a few hours, both CHL-1 and CHL-2 stable at 4K Encountered difficulties restarting 2K cold boxes on CHL-1 and CHL-2 CHL-2 warmup to remove contamination restored functionality CHL-1 has a failed compressor – will take weeks to repair, recovery plan still under discussion Plan is to reconfigure cryoplant to use CHL-2 to cool both LINACs and attempt to restore beam at lower energy (~5.5 GeV) – work began April 10, beam restart expected mid-week (~April 15) Hope for 2 weeks of running at lower energy before shutdown

5 April Summer Shutdown May-June: CHL-1 maintenance (UIM project), need CHL-2 on to keep CEBAF cool June-Oct.: CHL-2 warranty repair by vendor, CHL-1 used for CEBAF LINACs at 2K for He processing (gradient maintenance) Restart in November (see Rolf’s talk for physics)

6 April GeV Approved Experiments by Physics Topics TopicHall AHall BHall CHall DOtherTotal The Hadron spectra as probes of QCD (GluEx and heavy baryon and meson spectroscopy) 1 34 The transverse structure of the hadrons (Elastic and transition Form Factors) The longitudinal structure of the hadrons (Unpolarized and polarized parton distribution functions) The 3D structure of the hadrons (Generalized Parton Distributions and Transverse Momentum Distributions) Hadrons and cold nuclear matter (Medium modification of the nucleons, quark hadronization, N-N correlations, hypernuclear spectroscopy, few-body experiments) Low-energy tests of the Standard Model and Fundamental Symmetries TOTAL

7 April GeV Approved Experiments by PAC Days TopicHall AHall BHall CHall DOtherTotal The Hadron spectra as probes of QCD (GluEx and heavy baryon and meson spectroscopy) The transverse structure of the hadrons (Elastic and transition Form Factors) The longitudinal structure of the hadrons (Unpolarized and polarized parton distribution functions) The 3D structure of the hadrons (Generalized Parton Distributions and Transverse Momentum Distributions) Hadrons and cold nuclear matter (Medium modification of the nucleons, quark hadronization, N-N correlations, hypernuclear spectroscopy, few-body experiments) Low-energy tests of the Standard Model and Fundamental Symmetries TOTAL

8 April 2015 Future Projects MOLLER experiment (Possible MIE – FY17-20) – Standard Model Test – DOE science review (September 2014) – strong endorsement - Technical, cost & schedule reviews? SoLID – Chinese collaboration – CLEO Solenoid  – Director’s review (Feb. 2015)  lots of good feedback

9 April 2015 JLab Operations Budget FY15 – NP=$595M –Funded at $92.6M for 21 weeks –JLab proposed $97.6M for 30 weeks FY16 – NP=$625M (Pres. Budget) –Pres. Budget is $95.7M for 16 weeks –JLab proposed $103.7M for 25 weeks FY17 –DOE guidance is $105.7M for 27 weeks –JLab proposed $112M for 30 weeks

10 April 2015 Jefferson Lab 3 Year Schedule

11 April 2015 Hall A Projected Experiment Schedule, updated 2/ available on Hall A wiki CY 2015 CY 2017 CY Experiments listed in italics represent potential schedule options, in no order -Red indicates PAC41 High Impact Experiments including SBS G e p -Purple indicates new experiments approved by PAC42 -Blue indicates potential back-up experiment CY 2018 SBS start?

12 April 2015 Jefferson Lab NP Funding Projection (AY$) Actual Proposed   Proposed budget as presented at NSAC meeting November GeV Project completes in FY17 FY15 ops = senate mark (PB +$8M) FY15-19 proposed for 30 weeks/yr ops FY20+ is COL supporting 30 weeks/yr ops

13 April 2015 Recommendation 1: With highest priority, we recommend both completion of construction and full operation of the 12 GeV CEBAF at the Thomas Jefferson National Accelerator Facility, along with targeted instrumentation investments, such as the SoLID and MOLLER projects. Recommendation 2: A high luminosity, high-energy polarized Electron Ion Collider (EIC) is the highest priority of the U.S. Nuclear Physics QCD community for new construction after FRIB. ( voted jointly with Phases of QCD community ) LRP Resolution Meeting: April Important to Get Priority from NSAC