Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Page 1.

Slides:



Advertisements
Similar presentations
Chris Tennant Jefferson Laboratory March 15, 2013 “Workshop to Explore Physics Opportunities with Intense, Polarized Electron Beams up to 300 MeV”
Advertisements

Recirculating pass optics V.Ptitsyn, D.Trbojevic, N.Tsoupas.
Luminosity Prospects of LHeC, a Lepton Proton Collider in the LHC Tunnel DESY Colloquium May F. Willeke, DESY.
MeRHIC Design V.Ptitsyn on behalf of MeRHIC Design team: M. Bai, J. Beebe-Wang, I. Ben-Zvi, M. Blaskiewicz, A. Burrill, R. Calaga, X. Chang, A. Fedotov,
LHeC Test Facility Meeting
Electron and Ion Spin Dynamics in eRHIC V. Ptitsyn Workshop on Polarized Sources, Targets and Polarimetry Charlottesville, VA, 2013.
Jefferson Lab Status Hall A collaboration Dec. 16, 2013 R. D. McKeown Deputy Director For Science.
Peter Paul 12/16/06e-A Collider concept1 Brief History of the e-A Collider Concept Peter Paul BNL/SBU.
ILC RTML Lattice Design A.Vivoli, N. Solyak, V. Kapin Fermilab.
Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Page 1.
1 QM2006 D.I.Lowenstein RHIC : The Path Forward Presented to Quark Matter 2006 Shanghai, PRC Derek I. Lowenstein Brookhaven National Laboratory November.
18 th International Spin Physics Symposium Polarized Beams at EIC V. Ptitsyn.
Toward a Test Facility for an ERL Circulator Ring Based e-Cooler MEIC Electron Cooler Test Facility Planning Retreat January 31, 2012.
Thomas Jefferson National Accelerator Facility R.. McKeown Page 1 View from Lab Management R. McKeown DNP12 Satellite Meeting October 25, 2012.
Thomas Jefferson National Accelerator Facility Page 1 23 rd Annual HUGS Program June 2-20, 2008 CEBAF Overview HUGS08 June 3 CEBAF Overview HUGS08 June.
12 GeV Science Program R. D. McKeown JSA Science Council January 7, 2011 Thanks to A. Lung, L. Cardman, others.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U. S. Department of Energy USPAS.
Helical Undulator Based Positron Source for LC Wanming Liu 05/29/2013.
POETIC 2012 Indiana University R. D. McKeown 12 GeV CEBAF.
Jefferson Lab Nuclear Science Program QCD Evolution May 26, 2015 R. D. McKeown.
Jefferson Lab Status APEX Meeting April 22, 2014 R. D. McKeown Deputy Director For Science.
Contractor Assurance System Peer Review April Page 1 NSTAR 2011 May 16, 2011 Jefferson Lab Hugh Montgomery.
Thomas Jefferson National Accelerator Facility R. D. McKeown Slide 1 R. D. McKeown Jefferson Lab College of William and Mary The 12 GeV Science Program.
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility EIC Collaboration Meeting, Hampton University, May 19-23,
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
Thomas Jefferson National Accelerator Facility Newport News, Virginia, USA ELIC: A HIGH LUMINOSITY AND EFFICIENT SPIN MANIPULATION ELECTRON-LIGHT ION COLLIDER.
Jefferson Lab Update R. D. McKeown Jefferson Lab HPS Meeting June 16, 2014.
Thomas Jefferson National Accelerator Facility Page 1 Concepts for ELIC- a High Luminosity CEBAF based Electron-Light Ion Collider Ya. Derbenev, B. Yunn,
Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy Thomas Jefferson National Accelerator Facility Lia Merminga.
General Discussion some general remarks some questions.
ERHIC Conceptual Design V.Ptitsyn, J.Beebe-Wang, I.Ben-Zvi, A.Fedotov, W.Fischer, Y.Hao, V.N. Litvinenko, C.Montag, E.Pozdeyev, T.Roser, D.Trbojevic.
UMass Amherst Christine Aidala Jacksonville, FL Measuring the Gluon Helicity Distribution at a Polarized Electron-Proton Collider APS April Meeting 2007.
SLAC, September 25, 2009 Searching for a U -boson with a positron beam Bogdan Wojtsekhowski Thomas Jefferson National Accelerator Facility  The light.
Y. Roblin, D. Douglas, F. Hannon, A. Hofler, G. Krafft, C. Tennant EXPERIMENTAL STUDIES OF OPTICS SCHEMES AT CEBAF FOR SUPPRESSION OF COHERENT SYNCHROTRON.
Jefferson Lab Overview Bob McKeown April 20, 2015.
The 12 GeV Physics Program at Jefferson Lab R. D. McKeown Jefferson Lab College of William and Mary PTSP 2013 – Charlottesville, VA September 9, 2013.
EIC Users Meeting, SBU, 6/27/14 Polarized Electron Beams in the MEIC at JLab Fanglei Lin for MEIC Study Group EIC Users Meeting, Stony Brook University,
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Anthony.
NLC - The Next Linear Collider Project Tor Raubenheimer Beam Delivery System Design Differences American Linear Collider Physics Meeting SLAC January 8.
PAC37 Charge 1 1.) Review new proposals, previously conditionally approved proposals, and letters of intent † † for experiments that will utilize the 12.
MeRHIC Internal Cost Review October, Dmitry Kayran for injector group MeRHIC Internal Cost Review October 7-8, 2009 MeRHIC: Injection System Gun.
Future Circular Collider Study Kickoff Meeting CERN ERL TEST FACILITY STAGES AND OPTICS 12–15 February 2014, University of Geneva Alessandra Valloni.
Jefferson Lab Science Program R. D. McKeown Jefferson Lab Users Meeting June 3, 2014.
BINP tau charm plans and other projects in Turkey/China A. Bogomyagkov BINP SB RAS, Novosibirsk.
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Alex Bogacz NuFact’08, Valencia, Spain, July 4, 2008 Acceleration.
EIC NAS review Charge-2 What are the capabilities of other facilities, existing and planned, domestic and abroad, to address the science opportunities.
P. Chevtsov for the ELIC Design Team
Beam-beam effects in eRHIC and MeRHIC
Explore the new QCD frontier: strong color fields in nuclei
Large Booster and Collider Ring
Electron Polarization In MEIC
12 GeV CEBAF.
Introduction to Jefferson Lab
BINP Tau-Charm Project
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
Other issues and concepts under study Conclusions References
Jefferson Lab Status Bob McKeown October 21, 2015.
View from Lab Management HPS Collaboration Meeting
LHC (SSC) Byung Yunn CASA.
Introduction and Workshop Charge
Collider Ring Optics & Related Issues
Accelerator and Interaction Region
Physics Plans for CEBAF at 12 GeV
Transfer Line for EIC.
HALLA APEL REPORT Yves Roblin Hall A colllaboration Meeting
Main Design Parameters RHIC Magnets for MEIC Ion Collider Ring
Fanglei Lin, Yuhong Zhang JLEIC R&D Meeting, March 10, 2016
JLEIC Main Parameters with Strong Electron Cooling
MEIC New Baseline: Performance and Accelerator R&D
Optimization of JLEIC Integrated Luminosity Without On-Energy Cooling*
Presentation transcript:

Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Page 1 Strategic Planning Exercise CEBAF as a High Energy Fixed Target Machine: An Alternate Possibility for Nuclear Physics Beyond the 12 GeV Upgrade

Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Page 2 Strategic Planning Exercise Talks so far have discussed: 12 GeV (extremely well understood, exciting, and happily well underway) A possible EIC as a follow-on (a growing science program and developing machine and experimental equipment designs; preliminary case made to the larger community) This talk will raise the possibility of an alternate future based on a higher energy, fixed target accelerator

Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Page 3 Strategic Planning Exercise CEBAF as a High Energy Fixed Target Machine: An Alternate Possibility for Nuclear Physics Beyond the 12 GeV Upgrade Bottom Line Question: Will a higher energy fixed target machine deliver better physics for comparable (or lower) cost? With thanks to: G. A. Krafft, Y. Roblin, and Y. Zhang, who have done much of the speculating and all of the performance estimates

Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Page 4 Strategic Planning Exercise Possible Future Cases Explored 24 GeV Recirculated Linac (push present tunnel to limit) —Average current de-scoped by a factor of 2 (to 40 µA/hall max) due to 1 MW dump limit (get to 100 µA with new, higher power dump?) —Magnet layout and types roughly the same as 12 GeV, but 24 GeV requires stronger focusing and a completely new set of magnets! —Need 20 "C150s" and 10 C100s, and 20 C50s, yielding just over 2.5 GeV per linac pass (better than 50 total C100s) 50 GeV “Blue Sky Site Filler” —Same dumps w/ 1 MW limit imply 20 µA/hall maximum; for 100 µA either develop 5 MW dump or full (or partial) energy recovery (interesting to explore possibility) —Arcs are Theoretical Minimum Emittance (TME), Normal Conducting —Optimize shape, pass #, and cryomodule energy gain (C200s?) for lowest cost, as done for CEBAF

Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Page 5 Strategic Planning Exercise A Possible “Phase II”: 12  24 GeV

Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Page 6 Strategic Planning Exercise 22 x C150 or 17 x C m long 400 m radius 50 GeV: Five Passes through Three 3.33 GeV Linacs

Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Page 7 Strategic Planning Exercise What Beam Performance Appears to be Feasible? The CASA folk have looked broadly at the question of technical feasibility and provided rough estimates of achievable beam properties If we are seriously interested in either of these possibilities, further work is highly desirable

Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Page 8 Strategic Planning Exercise Expected Beam Parameters Units6 GeV12 GeV24 GeV50 24 GeV 50 GeV A, B, CGeV DGeVn/a1227n/a ModeCW Total CurrentµAµA (80  A with 2 MW Dump)  A with 5 MW Dump (& ERL?)  A with 5 MW Dump (& ERL?) Beam Power/DumpMW11111 Emittance (unnormalized,rms) nm- rad < Relative Energy Spread (rms) % Spot Size (rms)mm

Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Page 9 Strategic Planning Exercise 22 x C150 or 17 x C m long 400 m radius 50 GeV: Five Passes through Three 3.33 GeV Linacs Spin Rotator Fix Spin Dilution Problem by injecting w/ orientation vertical (along arc magnetic fields) and rotating to longitudinal on the way to the halls

Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Page 10 Strategic Planning Exercise Physics Example – Pion Form Factor 24 GeV fixed target 12 GeV Upgrade 50 GeV fixed target Garth Huber (private communication) EIC

Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Page 11 Strategic Planning Exercise Physics Example: DIS/DES Reach Harut Avakian (private communication) 12 GeV Upgrade 50 GeV

ep→e’   X Kinematic coverage For a given luminosity (30min of runtime with L=10 35 cm -2 s -1 ) and given bin in hadron z and P T, higher energy provides higher counting rates and wider coverage in x and Q 2 24 GeV 50 GeV Harut Avakian (private communication)

ep→e’   X Kinematic coverage For a given luminosity (30 min of runtime with L=10 35 cm -2 s -1 ) and given bin in hadron z and P T, higher energy provides higher counting rates and wider coverage in x and P T to allow studies of correlations between longitudinal and transverse degrees of freedom Wider x range allow studies of transverse distributions of sea quarks and gluons Wider P T range will be important in extraction of k T -dependences of PDFs Harut Avakian (private communication)

ep→e’   X Kinematic coverage For a given luminosity (30min of runtime with L=10 35 cm -2 s -1 ) ) and given bin in hadron z and P T, higher energy provides higher counting rates and wider coverage in Q 2, allowing studies of Q 2 evolution of 3D partonic distributions in a wide Q 2 range. Harut Avakian (private communication)

Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Page 15 Strategic Planning Exercise Physics Issues Is it worth investigating possible external beam upgrades more seriously? Much has been done to develop the physics that can be done with an Electron Ion Collider, but what can be done with a fixed target machine, and which machine can do the physics we consider essential better??? The issue should be discussed, and pursued if we consider the effort waranted

Another Topic for Consideration: Positrons in 12 GeV and Beyond The PEPPo experiment (below), which will use polarization transfer to convert an intense e - beam into a usable (nA level) e + beam, is in preparation for commissioning during the last 6 month run and then running at the start of the 12 month shutdown It aims to demonstrate that state-of-the-art mA e - beams could drive  A level e + sources, but will need continued encouragement to succeed Such a source could support research ranging from GPD and TPE physics (after acceleration to 12 GeV in CEBAF) to condensed matter studies (at keV energies) Polarization controls Variable energy MeV Polarization measurement (1.5%) Energy measurement (10 -2 ) PEPPo Laser Intensity controls

Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Page 17 Strategic Planning Exercise Parallel Positron Source Concept Should it be included as part of our long range planning, implying resource allocations over the next few years? Parallel to Injector: Duplicate Gun  100MeV portion of injector available for low energy positron operations (materials and/or NP research) in parallel with CEBAF in electron mode First CW polarized positron source: Beam currents up to ~microAmpere (10 13 e + /s) Polarization TBD, calculations suggest it will be as high as 70% Injection/Extraction energy tunable via RF.

Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Page 18 Strategic Planning Exercise Conclusions Efforts on MEIC collider continue and progress is being made, but consideration should be given to alternatives: A 24 GeV CEBAF-like machine in the present tunnel It would require further upgrades to the beam acceleration system and a completely new (normal conducting) complement of magnets A 50 GeV fixed target machine The CEBAF site could support such a machine, but it would be a major construction effort (of the scale of MEIC). Polarization and emittance dilution imply a completely new layout is required, and even so, special optics (or transverse injection w/ rotation at 50 GeV) may be needed to retain the polarization For both of these machines there are tradeoffs between beam power, dump development, cost, etc. In addition, should we consider developing a positron source to add new physics capabilities at a relatively modest cost?

Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Page 19 Strategic Planning Exercise

Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Page 20 Strategic Planning Exercise From 6 GeV to 12 GeV has been studied in detail ARC1ARC2ARC3ARC4ARC5ARC6ARC7ARC8ARC9 ARCA HALLD

Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Page 21 Strategic Planning Exercise Transverse Emittance* and Energy Spread † Area  p/p [x10 -3 ]  x [nm]  y [nm] Chicane Arc Arc Arc Arc Arc Arc Arc Arc Arc Arc Hall D * Emittances are geometric † Quantities are rms 12 GeV Beam Properties Double Bend Achromat Design Sync. Rad. Damping

Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Page 22 Strategic Planning Exercise Emittance Growth By Scaling Beam emittance growth over a section of beam line due to synchrotron radiation (ODU Lectures) For a FODO lattice where α is the bending angle of the beam line, equals to π for a half circle, ϑ = l b /ρ is bending angle of a dipole, l b /l b0 is the packing factor of the FODO cell, [ /ρ ϑ 3 ] only depends on phase advance of the FODO cell In this case Comparing the 12 GeV case and a potential 50 GeV accelerator: E increased by a factor of 45/11=4.09 and ρ increased by a factor of 3, then emittance growth scales by a factor of /3 4 ~ 14

Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Page 23 Strategic Planning Exercise Energy Spread by Scaling Energy spread after passing a section of circular beam line with uniform 180 degree bend Thus, Comparing 12 GeV and 50 GeV CEBAF, after last arc E increased by a factor of 45/11=4.09, ρ increased by a factor of 3, then δE/E increased by a factor of /2 /3=11.3

Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Page 24 Strategic Planning Exercise Polarization Loss Spin precession per 180 degree bend For 9 arcs Polarization angle spread yields dilution Fixed By Clever Longitudinal Optics?

Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Page 25 Strategic Planning Exercise

Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Page 26 Strategic Planning Exercise The 12 GeV Upgrade is Well Underway

It’s Science Case is Well Developed and Growing The Hadron spectra as probes of QCD (GluEx and heavy baryon and meson spectroscopy) The transverse structure of the hadrons (Elastic and transition Form Factors) The longitudinal structure of the hadrons (Unpolarized and polarized parton distribution functions) The 3D structure of the hadrons (Generalized Parton Distributions and Transverse Momentum Distributions) Hadrons and cold nuclear matter (Medium modification of the nucleons, quark hadronization, N-N correlations, hypernuclear spectroscopy, few-body experiments) Low-energy tests of the Standard Model and Fundamental Symmetries (Møller, PVDIS, PRIMEX, …..) And other science we can’t foresee

Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Page 28 Strategic Planning Exercise The EIC is an Evolving Candidate to Follow 12 GeV With an evolving science case JLab: add figure-8 hadron & electron rings to CEBAF medium energy IP low energy IP Three compact rings: 3 to 11 GeV electron Up to 20 GeV/c proton (warm) Up to 100 GeV/c proton (cold)

Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Page 29 Strategic Planning Exercise There is Still Work to be Done on the Science Case Bob McKeown at the JLab S&T “Visit” this year